• Events for Highway 7
  • Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 272 St for 0.5 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. September 15-20, 22-27, Sept. 29, Oct. 1-4, Oct. 6-10, Oct. 14-16. Construction speed zone 50km/h. No work on Sept. 30 and Oct. 11-13. Next update time Sat Oct 18 at 5:00 PM PDT. Last updated Mon Sep 15 at 7:15 AM PDT. (DBC-70968)
    Highway 7 Eastbound Highway 7 (Lougheed Highway), eastbound. Electrical maintenance planned between Dyke Rd and Shook St for 1.1 km (Mission). Starting Mon Sep 22 until Fri Sep 26. From 9:00 AM to 3:00 PM PDT daily. Right lane will be closed. Last updated Thu Sep 11 at 3:17 PM PDT. (DBC-81471)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Paving operations between Hawkins Pickle Rd and Gledhill Rd for 0.7 km (3 km east of Mission). Until Sat Oct 11. From 7:00 AM to 6:00 AM PDT daily. Lane Closure. Watch for traffic control. No traffic control on long weekends. Last updated Thu Sep 11 at 9:33 AM PDT. (DBC-81447)
    Highway 7 Westbound Highway 7 (Lougheed Highway), westbound. Utility work planned between Skweahm Pl and Waring Rd for 3.3 km (10 to 7 km east of Mission). Starting Mon Sep 22 at 9:00 AM PDT until Fri Sep 26 at 3:00 PM PDT. Right lane will be closed. BC Hydro maintenance and pole replacement. Last updated Thu Sep 11 at 3:44 PM PDT. (DBC-81460)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Road maintenance work between Taylor Rd and Harrison Bay Rd for 8.1 km (13 km east of Mission to 6 km west of Kent). Until Tue Sep 30. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays. Last updated Sat Aug 30 at 11:48 PM PDT. (DBC-79598)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Utility work between Beach Camp Rd and Harrison Mills Bridge for 1.3 km (Kent). Until Fri Sep 19. From 9:00 AM to 3:00 PM PDT daily. Lane Closure. Watch for traffic control. Expect delays. Last updated Wed Sep 3 at 6:07 AM PDT. (DBC-80938)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Utility work planned between Junction with Highway 9 and Seabird Island Rd for 0.8 km (Kent). Starting Mon Sep 22 until Fri Oct 3. From 8:00 AM to 4:30 PM PDT daily. Single lane alternating traffic will be in effect. Last updated Wed Sep 17 at 2:49 PM PDT. (DBC-81712)