• Events for Highway 7
  • Highway 7 Eastbound Highway 7 (Lougheed Highway), eastbound. Paving operations between Taylor Rd and Harrison Bay Rd for 8.1 km (13 km east of Mission to 6 km west of Kent). Until Sat Nov 15. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Watch for traffic control. Expect delays. Expect closures of up to 15 minutes. Next update time Fri Nov 14 at 3:00 PM PDT. Last updated Fri Oct 3 at 4:57 PM PDT. (DBC-82277)
    Highway 7 Highway 7 (Lougheed Highway). Utility work at 216 St (Maple Ridge). Until Tue Oct 7. From 9:00 AM to 2:00 PM PDT on Monday and Tuesday. Lane closures in both directions in effect. Watch for traffic control. Last updated Fri Oct 3 at 4:45 PM PDT. (DBC-82274)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 272 St for 0.5 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. Oct. 1-4, 6-10, 14-16. Construction speed zone 50km/h. No work on Sept. 30 and Oct. 11-13. Next update time Sat Oct 18 at 5:00 PM PDT. Last updated Tue Sep 30 at 2:46 PM PDT. (DBC-70968)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Paving operations between Hawkins Pickle Rd and Gledhill Rd for 0.7 km (3 km east of Mission). Until Sat Oct 11. From 7:00 AM to 6:00 AM PDT daily. Lane Closure. Watch for traffic control. No traffic control on long weekends. Last updated Thu Sep 11 at 9:33 AM PDT. (DBC-81447)