Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). Until Sat May 31 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. May 12 - May 16, May 20 - May 24, May 26 - May 31. No construction scheduled for May 17 - May 19. Construction speed zone 50km/hr. WB right turn to 272nd St closed. Detour at 263rd. Last updated Mon May 12 at 8:32 AM PDT. (DBC-70968) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Rowan Rd for 2.1 km (2 to 4 km east of Mission). Until Sat May 31. From 7:00 PM to 6:00 AM PDT daily. Watch for traffic control. Last updated Thu Apr 24 at 7:52 AM PDT. (DBC-75710) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Utility work between Madaris Rd and Rowan Rd for 2.0 km (4 to 2 km east of Mission). Until Sat May 31 at 3:00 PM PDT. Watch for traffic control. No work during the long weekend. Last updated Mon May 5 at 4:09 PM PDT. (DBC-76211) |