Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 272 St for 0.5 km (Maple Ridge). From 7:00 AM to 5:00 PM PST on weekdays and Saturday. Watch for traffic control. Intermittent delays and lane closures. No work scheduled from Feb 15 - Feb 17. Next update time Tue Feb 18 at 10:00 AM PST. Last updated Fri Jan 17 at 10:39 AM PST. (DBC-70968) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Construction work between Horne St and James St for 0.2 km (Mission). Until Fri Feb 28 at 3:00 PM PST. From 9:00 AM to 3:00 PM PST on weekdays. Right lane closed. Last updated Tue Jan 7 at 11:39 AM PST. (DBC-71707) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road maintenance work between Hawkins Pickle Rd and Gledhill Rd for 1.1 km (4 to 3 km east of Mission). Until Fri Jan 31 at 3:00 PM PST. From 9:00 AM to 3:00 PM PST daily. Watch for traffic control. Last updated Mon Jan 6 at 10:31 AM PST. (DBC-71283) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Utility work between Holachten Dr and Cooper Rd for 2.8 km (10 to 13 km west of Kent). Until Fri Jan 24. From 10:00 AM to 3:00 PM PST on weekdays. Right lane closed. Watch for traffic control. Speed reduction to 60 km/h. Last updated Tue Jan 7 at 11:05 AM PST. (DBC-71708) |
Highway 7 Eastbound |
Highway 7 (Lougheed Highway), eastbound. Utility work planned at Junction with Highway 9 (Kent). Starting Tue Jan 21 at 9:00 AM PST until Tue Jan 21 at 3:00 PM PST. Left lane will be blocked. Posted road speed 50 km/h. Last updated Tue Jan 7 at 11:53 AM PST. (DBC-71710) |
Highway 7 |
Highway 7 (Lougheed Highway). Black ice between Junction with Highway 9 and the end of Highway 7 (Lougheed Highway) for 30.5 km (Kent to 1 km east of Hope). Last updated Fri Jan 17 at 4:19 PM PST. (DBCRCON-210722) |