• Events for Highway 7
  • Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. No work August 2-4. Construction speed limit 50km/h. Expect delays. Next update time Sat Aug 30 at 3:00 PM PDT. Last updated Wed Jul 30 at 7:32 AM PDT. (DBC-70968)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Gledhill Rd for 1.0 km (2 to 3 km east of Mission). Until Sun Aug 31. From 7:00 AM to 6:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. No traffic control on long weekends. Last updated Fri Jul 25 at 7:25 AM PDT. (DBC-79707)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Road maintenance work between Taylor Rd and Harrison Bay Rd for 8.1 km (13 km east of Mission to 6 km west of Kent). Until Sun Aug 31. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays. Last updated Thu Aug 7 at 2:57 PM PDT. (DBC-79598)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Roadside brushing between Bodnar Rd and Ashton Rd for 3.8 km (Kent). Until Tue Aug 12 at 3:00 PM PDT. Vegetation clearance for BC Hydro overhead lines. Traffic may be single lane alternating when needed. Last updated Mon Jul 28 at 3:37 PM PDT. (DBC-79825)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Paving operations between Junction with Highway 9 and Ruby Creek Rd for 16.3 km (Kent). Until Fri Aug 15 at 7:00 PM PDT. From 6:30 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Pilot car controlled. Last updated Fri Jul 25 at 9:21 AM PDT. (DBC-79476)