Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. June 23-28, 30. July 2-5, 7-12. Construction speed limit 50km/h. Westbound right turn to 272nd Street closed. Detour at 263rd Street. Next update time Wed Jul 2 at 11:00 AM PDT. Last updated Sat Jun 28 at 11:08 AM PDT. (DBC-70968) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work planned between Madaris Rd and Rowan Rd for 2.1 km (2 to 4 km east of Mission). Starting Tue Jul 1 at 9:00 PM PDT until Thu Jul 31 at 6:00 AM PDT. From 9:00 PM to 6:00 AM PDT daily. Watch for traffic control personnel. Traffic control to not take place during a long weekend. Last updated Mon Jun 23 at 3:37 PM PDT. (DBC-78435) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Paving operations between Seabird Island Rd and Ross Rd for 26.4 km (Kent to Hope). Until Sat Jul 12 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Lane closures in both directions in effect. Access to some intersections and side roads may be restricted during work hours. Please follow posted construction signs and expect delays. Last updated Sun Jun 22 at 11:39 AM PDT. (DBC-78373) |