-
Lower Mainland / Highway 7 Both Directions
-
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 272 St for 0.5 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. September 15-20, 22-27, Sept. 29, Oct. 1-4, Oct. 6-10, Oct. 14-16. Construction speed zone 50km/h. No work on Sept. 30 and Oct. 11-13. Next update time Sat Oct 18 at 5:00 PM PDT. Last updated Mon Sep 15 at 7:15 AM PDT. (DBC-70968)
-
Nearby Highway Webcams
-
Nearby Weather Station Reports
-
Forecast Today Tonight Pitt Meadows 20 14 Abbotsford 22 12 White Rock 20 14 Chilliwack 22 12 Vancouver 20 14 Agassiz 22 12 Source: Environment Canada