-
Lower Mainland / Highway 7 Both Directions
-
Highway 7 (Lougheed Highway), in both directions. Paving operations between Junction with Highway 9 and Ruby Creek Rd for 16.3 km (Kent). Until Fri Aug 15 at 7:00 PM PDT. From 6:30 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Pilot car controlled. Last updated Fri Jul 25 at 9:21 AM PDT. (DBC-79476)
-
Nearby Highway Webcams
-
Nearby Weather Station Reports
-
Forecast Today Tonight Agassiz 33 17 Hope 36 22 Chilliwack 33 17 Hope Slide 32 14 Abbotsford 33 17 Coquihalla Highway - Hope to Merritt - - Source: Environment Canada