• Lower Mainland / Highway 1 Both Directions
  • [Truncated] Highway 1 (TransCanada Highway), in both directions. Paving operations planned between Cassiar Tunnel and Exit 29: Willingdon Ave for 3.8 km (Vancouver to Burnaby). Starting Sun Jul 13 until Mon Sep 15. From 7:00 PM to 7:00 AM PDT on weekdays and Sunday. Traffic down to 1 lane each way. Westbound paving will be between 7 PM and 5 AM. Eastbound paving will be between 7 PM and 7 AM. Both directions will be affected. Follow construction signage and watch for crews on the road. Next upda

  • Nearby Highway Webcams
  • Cassiar Tunnel
    Cassiar Tunnel
    Highway 1 at the Cassiar Tunnel south end, looking south.
    Douglas Road - W
    Douglas Road - W
    Highway 1 at Douglas Road overpass, looking west.
    Douglas Road - E
    Douglas Road - E
    Highway 1 at Douglas Road overpass, looking east.
  • Nearby Weather Station Reports
  • Forecast Tonight Sat
    Vancouver
    15 24
    Pitt Meadows
    15 24
    White Rock
    15 24
    Gibsons
    17 24
    Squamish
    14 27
    Gulf Islands (Southern)
    15 26
    Source: Environment Canada