• Peace / Highway 29 Both Directions
  • Highway 29, in both directions. Bridge maintenance between Monkman Way and Bullmoose Rd for 0.6 km (Tumbler Ridge). Until Wed Oct 1. From 12:00 AM to 12:00 AM MST on weekdays and Saturday. Single lane alternating traffic will be in effect 24 hours a day. Watch out for crews and equipment. A minimum lane width of 4.6m will be maintained throughout the duration of the works. Last updated Mon Jul 7 at 8:05 AM MST. (DBC-78833)

  • Nearby Highway Webcams
  • Tumbler Ridge
    Tumbler Ridge
    Highway 29 at Highway 52 junction, looking westbound on Highway 29.
    East Pine Hill
    East Pine Hill
    Highway 97 about 27 km east of Chetwynd on East Pine Hill, looking east.
    Chetwynd - W
    Chetwynd - W
    Highway 97 about 9 km east of Chetwynd at Wabi Estates Road, looking west.
  • Nearby Weather Station Reports
  • Forecast Today Tonight
    Chetwynd
    26 17
    Dawson Creek
    26 17
    Highway 97 - Pine Pass
    - -
    Fort St. John
    25 15
    Mackenzie
    25 13
    Source: Environment Canada