-
Lower Mainland / Highway 9 Both Directions
-
Highway 9, in both directions. Road construction work between Pioneer Ave and McCallum Rd for 1.3 km (Kent). Until Thu Dec 19 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Lane closure from Else Rd to McCallum Rd. No lane closures November 9th to 11th. Last updated Tue Oct 8 at 2:22 PM PDT. (DBC-69039)
- Nearby Highway Webcams
- Nearby Weather Station Reports
-
Forecast Tonight Fri Agassiz 4 8 Chilliwack 4 8 Hope 4 8 Hope Slide 0 4 Abbotsford 5 10 Pitt Meadows 5 10 Source: Environment Canada