Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Paving operations planned between Exit 14 and Exit 16: Leigh Rd (Langford). Starting Thu Aug 1 at 4:00 PM PDT until Fri Aug 2. Exit ramp will be closed. Watch for traffic control personnel. Next update time Fri Aug 2. Last updated Fri Jul 26 at 11:03 AM PDT. (DBC-66601) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Mon Jul 29 at 9:00 AM PDT. Last updated Fri Jul 26 at 10:09 AM PDT. (DBC-66582) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge construction at Nicomen River Rd (14 km east of Lytton). Until Sat Nov 30. Single lane alternating traffic. Watch for traffic control. Expect delays. Speed reduced to 30km/hr. Highway stoppages with expected delays of 15 minutes. Project completion: Nov 30, 2024. Next update time Mon Jul 29 at 10:00 AM PDT. Last updated Mon Jul 15 at 11:10 AM PDT. (DBC-56391) |
Highway 1 Both Directions |
Highway 1 (Kicking Horse Pass), in both directions. Construction work between Golden Donald Upper Rd and Yoho Bridge for 5.3 km (2 to 7 km east of Golden). Until Wed Jul 31 at 5:30 PM MDT. Westbound direction is reduced to one lane and 50km/hr speed limit in effect thru site. Travelers may experience minor traffic interruptions and delays. Watch for workers and Traffic Control Personnel on site. Next update time Mon Jul 29 at 9:00 AM MDT. Last updated Thu Jul 25 at 3:56 PM MDT. (DBC-62137) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Limited visibility with smoke between Robson River Bridge and BC AB Border for 61.5 km (15 km east of Tete Jaune to British Columbia and Alberta Border). Road closed. Jasper Park is closed due to significant wildfire. See #511 Alberta for more information Hwy 16 east from Mount Robson Visitor Centre to Alberta border is closed. Next update time Mon Jul 29 at 9:00 AM PDT. Last updated Thu Jul 25 at 2:43 PM PDT. (DBC-66452) |
Highway 17 Both Directions |
Highway 17 (Patricia Bay Highway), in both directions. Construction work at Exit 18: Keating Cross Rd (Central Saanich). Until Tue Jul 1, 2025. Nighttime lane closures both directions. Access to Barbara Drive from Keating Cross Road permanently closed. Access to East Saanich, Martindale and Danica from Hwy 17 permanently closed. Keating Cross Road southbound onramp to Hwy 17 closed until June 2025. Next update time Thu Sep 26 at 12:00 PM PDT. Last updated Fri Jul 26 at 12:11 PM PDT. (DBC-54341) |
Highway 17 Eastbound |
Highway 17, eastbound. Construction work between Tannery Rd and Bridgeview Dr for 2.0 km (Surrey). Until Sun Jul 28 at 5:00 AM PDT. From 9:00 PM to 5:00 AM PDT on Tuesday, Wednesday, Thursday, Friday and Saturday. Road closed. Watch for traffic control. Detour in effect. Next update time Sun Jul 28 at 5:00 AM PDT. Last updated Mon Jul 22 at 2:15 PM PDT. (DBC-65663) |
Highway 17 Eastbound |
Highway 17, eastbound. Construction work between Tannery Rd and Bridgeview Dr for 3.3 km (Surrey). Until Mon Jul 29 at 5:00 AM PDT. Road closed. Next update time Mon Jul 29 at 5:00 AM PDT. Last updated Thu Jul 18 at 6:42 PM PDT. (DBC-66335) |
Highway 17 Westbound |
Highway 17, westbound. Construction work planned between Bridgeview Dr and Tannery Rd for 3.3 km (Surrey). Starting Tue Jul 30 at 9:00 PM PDT until Thu Aug 1 at 5:00 AM PDT. From 9:00 PM to 5:00 AM PDT on Tuesday, Wednesday and Thursday. Road closure planned. Watch for traffic control personnel. Next update time Thu Aug 1 at 5:00 AM PDT. Last updated Thu Jul 25 at 12:53 PM PDT. (DBC-66566) |
Highway 6 NS Both Directions |
Highway 6 NS, in both directions. There is a wildfire between Harris Rd and Springer Creek Rd for 28.8 km (1 km south of New Denver to 1 km south of Slocan). Road closed. No estimated time of opening. Detour via Hwy 31A, Hwy 31, Hwy 3A. Next update time Sat Jul 27 at 8:00 AM PDT. Last updated Fri Jul 26 at 8:06 PM PDT. (DBC-66364) |
Highway 77 Both Directions |
Highway 77, in both directions. There is a wildfire between the start of Highway 77 and the end of Highway 77 for 137.6 km (138 km south of British Columbia and Northwest Territory Border to British Columbia and Northwest Territory Border). Road open to traffic. Limited visibility with smoke. No stopping due to wildfire activity in the area, visibility may be limited. Drive with caution. Next update time Tue Oct 15 at 12:00 PM MST. Last updated Wed Jul 17 at 10:09 PM MST. (DBC-66069) |
Highway 97 Both Directions |
Highway 97, in both directions. Landslide between Callan Rd and N Beach Rd for 1.5 km (2 to 1 km north of Summerland). Landslide between Callan Rd and N Beach Rd. Road open to two-way traffic. Expect intermittent closures of 15 minutes. Next update time Mon Oct 7 at 12:30 PM PDT. Last updated Wed Jul 24 at 12:40 PM PDT. (DBC-55794) |
Highway 97 Both Directions |
Highway 97 (Alaska Highway), in both directions. Flooding between 115 Creek Campground and Callison Rd (167 km north of Fort Nelson). Single lane alternating traffic. Obey signs and traffic control personnel. Next update time Mon Jul 29 at 8:00 AM MST. Last updated Fri Jul 26 at 2:30 PM MST. (DBC-66472) |
Kootenay Lake Ferry Eastbound |
Kootenay Lake Ferry, eastbound. There is a mechanical issue at Kootenay Lake Ferry (Kootenay Lake). Last sailing time from Balfour is cancelled. Next update time Sat Jul 27 at 5:30 AM PDT. Last updated Fri Jul 26 at 5:10 PM PDT. (DBC-66619) |
Other Roads Both Directions |
Soda-Creek Macalister Road, in both directions. Landslide at 10 kms from the Junction of Highway 97. Road closed. Geotech assessment underway. Next update time Mon Aug 26 at 2:00 PM PDT. Last updated Fri Jul 26 at 2:29 PM PDT. (DBC-16911) |
Other Roads |
Kersley-Dale Landing Rd. Landslide at 500 metres in from Highway 97 Intersection. Road closed. A temporary Single Lane Gravel Road for Local Traffic via Arnoldus Road. Next update time Thu Aug 8 at 9:00 AM PDT. Last updated Mon Apr 8 at 7:57 AM PDT. (DBC-23443) |
Other Roads Both Directions |
Durrell Road, in both directions. Landslide at 700m from Highway 97. Road closed. Detour in effect. Detour available via Highway 97 and Dale Lake Road. Next update time Wed Oct 23 at 12:00 PM PDT. Last updated Mon Apr 22 at 1:30 PM PDT. (DBC-27390) |
Other Roads Both Directions |
Quesnel-Hixon Road, in both directions. Landslide at Cottonwood bridge. Road closed. Next update time Wed Oct 23 at 2:00 PM PDT. Last updated Wed Apr 17 at 2:22 PM PDT. (DBC-28386) |
Other Roads |
Allenby Road. Mudslide between Miller Road and Boys Road. Road closed. Assessment in progress. Alternate routes available. Next update time Fri Aug 30 at 3:00 PM PDT. Last updated Thu Jul 4 at 3:33 PM PDT. (DBC-35173) |
Other Roads |
Johnston Bridge. Travel advisory in effect at Front St. In Quesnel. Bridge is open to vehicles with gross vehicle weight rating of 10,000 kilograms or lower. Industrial traffic and heavy commercial traffic must detour via Plywood Rd and Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision. Next update time Fri Apr 11, 2025 at 2:00 PM PDT. Last updated Thu Apr 11 at 10:28 AM PDT. (DBC-47311) |
Other Roads Both Directions |
McKay Road, in both directions. Flooding at McKay Road. Road closed. Next update time Thu Aug 8 at 9:00 AM PDT. Last updated Mon Apr 8 at 7:57 AM PDT. (DBC-53013) |
Other Roads Both Directions |
Canal Rd, in both directions. Construction work at Mt Norman Access Rd. From 10:00 AM to 2:00 PM PDT on weekdays and Saturday. Road closed. Watch for traffic control. Expect delays. Next update time Fri Aug 2 at 12:00 PM PDT. Last updated Tue Jul 2 at 12:14 PM PDT. (DBC-61149) |
Other Roads Both Directions |
Venables Valley Rd, in both directions. There is a wildfire between Highway 1 and Rathayatra Way. Road closed. Next update time Sat Jul 27 at 11:00 AM PDT. Last updated Fri Jul 26 at 11:58 AM PDT. (DBC-66321) |
Other Roads Both Directions |
Rannie Pit Rd, in both directions. There is a wildfire between Highway 1 and Friesen Rd. Road closed. Next update time Sat Jul 27 at 11:00 AM PDT. Last updated Fri Jul 26 at 11:05 AM PDT. (DBC-66322) |
Other Roads Both Directions |
Dunn Lake Road, in both directions. There is a wildfire between Clearwater and Barriere. Road closed. Closed from 22 km south of Clearwater to 28 km north of Barriere. Detour not available. Next update time Sat Jul 27 at 10:00 AM PDT. Last updated Fri Jul 26 at 8:04 PM PDT. (DBC-66579) |
Highway 1 Both Directions |
Highway 1, in both directions. Utility work at Highway 18. Until Sat Aug 31. From 7:00 AM to 5:00 PM PDT on weekdays. Left turn lane closed. Right turn lane closed. Expect minor delays. Water main, storm sewer maintenance and road resurfacing. Lane closures in effect until project end. Watch for workers/vehicles on the shoulder. Last updated Mon Jun 3 at 9:51 AM PDT. (DBC-63012) |
Highway 1 Northbound |
Highway 1, northbound. Construction work between Old Cariboo Rd and Todd Rd. Until Fri Aug 9. From 7:00 AM to 6:00 PM PDT on weekdays. Lane Closure. Sidewalk replacement. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Thu Jul 18 at 11:38 AM PDT. (DBC-66319) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Galloping Goose Trail and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Sat Dec 14 at 5:30 AM PDT. From 8:00 PM to 5:30 AM PDT on weekdays. Left lane is closed in both directions. Expect delays. Traffic reduced to single lane both directions, with a minimum width of 4m and no change to the minimum height. Speed limit reduced to 50km/h. Last updated Thu Jun 20 at 4:49 PM PDT. (DBC-65197) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Bridge construction at Burnside Rd W (Saanich). Until Sat Dec 14 at 5:30 AM PDT. From 8:00 PM to 5:30 AM PDT on weekdays and Sunday. Right lane closed. Lane closure Sun to Thurs night for widening of the Eastbound Colquitz Bridge. Maximum width 4.0m. Speed limit reduced to 50 km/h. Left lane and offramp to Burnside Drive will remain open. Last updated Thu Jun 20 at 4:49 PM PDT. (DBC-64542) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance between Mt Sicker Rd and Fuller Lake Rd for 3.7 km (Chemainus). Until Sat Nov 30 at 7:00 PM PDT. Lane closures in both directions. Construction speed zone. One bridge will be closed for repairs with traffic diverted onto adjacent bridge. For restrictions for oversize trucks with widths greater than 3.2m, consult CVSE Notice # 01-2024. Last updated Wed Jun 5 at 12:12 PM PDT. (DBC-53483) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Rosehill St and Cypress St for 0.1 km (Nanaimo). Starting Mon Aug 12 at 7:00 AM PDT until Thu Aug 15 at 7:00 PM PDT. Possible delays. Upgrade of watermain. Watch for traffic control personnel and work crews. Road reduced to one lane in both directions. Last updated Fri Jul 19 at 2:36 PM PDT. (DBC-66359) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work between Exit 13 and Keith Rd for 0.8 km (West Vancouver). Until Fri Oct 11 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT daily. Possible delays. Shoulder maintenance. Sign placement
Work is from Exit 13 to Hadden Drive. Last updated Tue Jul 9 at 5:49 PM PDT. (DBC-66044) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work between Exit 37: Gaglardi Way and King Edward St for 3.2 km (Burnaby to Coquitlam). Until Fri Feb 28, 2025 at 7:00 AM PDT. From 9:30 PM to 7:00 AM PDT daily. Lane Closure. Expect delays. Lane closures are needed to move materials & equipment for the construction of TransLink's North Rd maintenance facility. Lane closures will be intermittent, implemented as necessary. Last updated Mon Apr 22 at 11:21 AM PDT. (DBC-60503) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Line painting between Exit 37: Gaglardi Way and Port Mann Bridge for 8.5 km (Burnaby to Surrey). Until Thu Aug 1 at 7:00 AM PDT. Lane Closure. Watch for slow moving vehicles. Last updated Wed Jul 24 at 6:33 PM PDT. (DBC-66543) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance planned at Exit 40: Brunette Ave (Coquitlam). Starting Sun Jul 28 at 10:00 PM PDT until Fri Aug 2 at 4:00 AM PDT. From 10:00 PM to 4:00 AM PDT on weekdays and Sunday. Lane closures in both directions planned. Watch for traffic control personnel. Highway 1 EB HOV lane closed, Highway 1 WB HOV and fast lanes closed, NB slow lane closed on the Brunette overpass. Last updated Wed Jul 24 at 10:38 PM PDT. (DBC-66546) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between 208 St and Exit 73 for 9.3 km (Langley - District). Until Sat Nov 30 at 5:00 AM PDT. Lane Closure. Expect minor delays. Last updated Tue Jun 25 at 9:00 AM PDT. (DBC-65554) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Exit 83: Mt Lehman Rd and Exit 87: Clearbrook Rd for 2.3 km (Abbotsford). Until Wed Jul 31. From 8:30 PM to 5:30 AM PDT on weekdays. Left lane is closed in both directions. Expect delays. Last updated Tue Jun 25 at 8:34 AM PDT. (DBC-65551) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Shoulder maintenance planned between Bradner Rd and Exit 90: McCallum Rd for 7.5 km (Abbotsford). Starting Thu Aug 1 at 8:30 PM PDT until Sat Aug 31 at 5:30 AM PDT. From 8:30 PM to 5:30 AM PDT on weekdays. Left lane will be closed in both directions. Watch for traffic control personnel. Last updated Mon Jul 22 at 12:21 PM PDT. (DBC-66426) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Maintenance between Peardonville Rd and Exit 90: McCallum Rd for 5.0 km (Abbotsford). Until Wed Jul 31 at 5:30 AM PDT. From 8:30 PM to 5:30 AM PDT on weekdays. Left lane is closed. Night time construction work. Expect delays. Left lane closed in both directions. Last updated Tue Jul 16 at 12:09 PM PDT. (DBC-66241) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work planned between Exit 138: Bridal Falls Rd and Exit 146 for 8.1 km (5 to 14 km east of Chilliwack). Starting Mon Aug 19 at 8:00 AM PDT until Mon Aug 26 at 5:00 PM PDT. From 8:00 AM to 5:00 PM PDT daily. Right lane will be closed. BC Hydro pole replacement. Speed reduction to 80 km/h. Last updated Thu Jul 18 at 10:15 AM PDT. (DBC-66308) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work planned between Exit 138: Bridal Falls Rd and Exit 146 for 4.4 km (12 to 7 km east of Chilliwack). Starting Mon Jul 29 at 8:00 AM PDT until Fri Aug 9 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Shoulder will be closed. Right lane will be closed. Expect delays. No lane closures from 12pm-4pm August 1-6th. Last updated Thu Jul 18 at 10:55 AM PDT. (DBC-66312) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work planned between Doolan Rd and Dogwood Valley Rd for 3.6 km (7 to 3 km north of Hope). Starting Mon Jul 29 at 8:00 AM PDT until Fri Aug 2 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT on weekdays. Right lane will be blocked. Work is between Stack Frontage Rd. And Reynolds Rd. For pole access. Last updated Wed Jul 24 at 4:36 PM PDT. (DBC-66541) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Emory Creek Rd and Whiskey Fill Rd for 6.7 km (Yale). Starting Mon Aug 12 at 8:00 AM PDT until Fri Aug 23 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Mon Jul 15 at 10:21 AM PDT. (DBC-66186) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Paving operations between Pacific Way and Grand Blvd for 11.2 km (Kamloops). Until Sat Jul 27 at 6:00 AM PDT. From 7:00 PM to 6:00 AM PDT on weekdays and Sunday. Lane Closure. Watch for traffic control. Expect up to 15 minute delays. Last updated Thu Jul 25 at 3:50 PM PDT. (DBC-64552) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Blasting planned between Planter Rd and Coburn St for 2.8 km (Chase). Starting Mon Jul 29 at 5:00 AM PDT until Fri Sep 27 at 4:00 PM PDT. From 5:00 AM to 4:00 PM PDT on weekdays and Saturday. Lane Closure. Construction in both directions. Random stoppages of 5 minutes. Blasting closures most days between 9:00 AM to 1:00 PM for 20 minutes. Last updated Tue Jul 23 at 1:31 PM PDT. (DBC-66492) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 6:00 AM to 5:00 PM PDT on weekdays. Blasting. Road closed intermittently. Watch for traffic control. Next update time Fri Aug 30 at 10:00 AM PDT. Last updated Fri Jul 26 at 10:19 AM PDT. (DBC-64961) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Tappen Valley Rd for 3.2 km (Tappen). Until Tue Dec 31. From 7:00 AM to 12:00 AM PDT on weekdays and Saturday. Expect delays. Reduced speed through work zone at 80 km/hr during inactive work, 60 km/hr during active work. Intermittent minor stoppages. Last updated Tue May 28 at 2:20 PM PDT. (DBC-57219) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Ditching between Bolton Rd and Schneider Pl (1 km east of Tappen). Until Sat Aug 31. From 7:00 PM to 10:30 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays up to 20 minutes. Last updated Tue May 28 at 2:21 PM PDT. (DBC-64006) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW (1 km west of Salmon Arm). Until Thu Oct 31. From 5:30 PM to 3:00 AM PDT and from 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Up to one 20 minute closure daily. Additional 5 minute closures may be required intermittently. Watch for traffic control. Last updated Tue May 28 at 2:20 PM PDT. (DBC-57687) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Watch for falling rocks between Eagle River at Kay Falls Bridge and Clanwilliam OH Bridge for 23.1 km (32 to 9 km west of Revelstoke). Watch for possible falling rocks. Last updated Fri Jul 26 at 11:08 PM PDT. (DBC-61839) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Columbia River Bridge and West Boundary of Mount Revelstoke National Park for 17.4 km (Revelstoke to 1 km west of West Boundary of Mount Revelstoke National Park). Until Sat Aug 17. From 7:00 PM to 7:00 AM PDT on weekdays and Sunday. Single lane alternating traffic. Up to 15 min delays. Obey traffic control personnel. Last updated Thu Jul 25 at 5:14 PM PDT. (DBC-65189) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Watch for falling rocks between West Boundary of Mount Revelstoke National Park and Jumping Creek Rd for 25.3 km (1 km west of West Boundary of Mount Revelstoke National Park to 5 km west of West Boundary of Glacier National Park). Watch for possible falling rocks. Last updated Fri Jul 26 at 11:08 PM PDT. (DBC-61841) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge construction between Albert Canyon West Bridge and Albert Canyon Rd (3 km east of East Boundary of Mount Revelstoke National Park). Until Sun Sep 15. From 7:00 AM to 5:30 PM PDT daily. Eastbound lane closure. Detour in effect. Speed reduction from 100 km/h to 60 km/h in effect. Watch for traffic control. No delays expected. Last updated Wed Jun 26 at 1:11 PM PDT. (DBC-65605) |
Highway 1 Both Directions |
Highway 1 (Kicking Horse Pass), in both directions. Watch for falling rocks between Golden Donald Upper Rd and Yoho Bridge (5 km east of Golden). Last updated Sat Jul 27 at 12:08 AM MDT. (DBC-44269) |
Highway 10 Westbound |
Highway 10, westbound. Construction work between 168 St and 160 St for 1.6 km (Surrey). Until Fri Aug 9. From 9:30 AM to 2:30 PM PDT daily. Watch for trucks turning in and out of property. Speed reduction to 60km/h. Last updated Thu Jun 20 at 8:44 AM PDT. (DBC-65376) |
Highway 10 Eastbound |
Highway 10, eastbound. Utility work planned between 168 St and 172 St for 0.8 km (Surrey). Starting Tue Aug 6 until Fri Aug 9. From 9:00 AM to 2:30 PM PDT daily. Right lane will be closed. Watch for traffic control personnel. Expect delays. Last updated Tue Jul 23 at 8:41 AM PDT. (DBC-66481) |
Highway 101 Both Directions |
Highway 101, in both directions. Paving operations between Larson Rd and Wilde Rd for 11.1 km (5 to 16 km west of Powell River). Until Fri Sep 20. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Expect delays. Last updated Mon Jul 8 at 10:20 AM PDT. (DBC-65971) |
Highway 11 Both Directions |
Highway 11, in both directions. Utility work planned between Barrons Way and McClary Ave for 0.3 km (Abbotsford). Starting Mon Jul 29 until Tue Jul 30. From 8:00 AM to 4:00 PM PDT daily. Right lane will be closed. Watch for traffic control personnel. Expect delays. Last updated Thu Jul 18 at 10:09 AM PDT. (DBC-66310) |
Highway 11 Both Directions |
Highway 11, in both directions. Road construction work at Valley Rd (Abbotsford). Until Sat Aug 17 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Expect minor intermittent delays. Speed reduced to 50km/hr. No traffic disruptions on BC Day long weekend, August 3 to August 5. Last updated Mon Jul 22 at 9:33 AM PDT. (DBC-65477) |
Highway 11 Both Directions |
Highway 11, in both directions. Road maintenance work planned between Valley Rd and Bateman Rd for 0.6 km (Abbotsford). Starting Mon Jul 29 at 7:00 PM PDT until Mon Jul 29 at 10:00 PM PDT. Left lane will be closed. Watch for traffic control personnel. Expect delays. Last updated Fri Jul 26 at 1:12 PM PDT. (DBC-66605) |
Highway 118 Both Directions |
Highway 118, in both directions. Bridge construction between Marina Way and Mill Bay Rd (1 km north of Topley Landing). Detour in effect. Last updated Mon Jul 15 at 8:56 AM PDT. (DBC-66182) |
Highway 14 Both Directions |
Highway 14, in both directions. Roadside brushing between Cedar Coast Dr and Kirby Creek Rd for 3.1 km (8 to 11 km east of Jordan River). Until Thu Aug 8. From 8:00 AM to 4:00 PM PDT on weekdays. Right lane closed. Watch for traffic control. Last updated Wed Jul 17 at 1:54 PM PDT. (DBC-66281) |
Highway 14 Eastbound |
Highway 14, eastbound. Utility work planned between Jacklin Rd and Cecil Blogg Dr for 0.5 km (Colwood). Starting Mon Jul 29 at 8:00 PM PDT until Tue Jul 30 at 4:00 AM PDT. Expect delays. Single lane alternating traffic will be in effect. Last updated Fri Jul 19 at 1:41 PM PDT. (DBC-66356) |
Highway 16 Westbound |
Highway 16 (Yellowhead Highway), westbound. Construction work between 6th St and 7th St (Prince Rupert). Until Fri Aug 30. From 8:00 AM to 6:00 PM PDT on weekdays. Last updated Wed Jul 10 at 9:29 AM PDT. (DBC-66060) |
Highway 16 |
Highway 16 (Yellowhead Highway). Electrical maintenance at Level Crossing (38 km west of Terrace). Until Wed Jul 31 at 4:00 PM PDT. Mile 26 Chevrons in West Bound Direction are Sporadically Active. Working Urgently to Remedy the Situation. Please Travel with Care. Last updated Wed Jul 10 at 2:04 PM PDT. (DBC-66073) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Utility work between Galiano Rd and Chowsunket St for 6.3 km (Fraser Lake to 3 km east of Endako). Until Fri Aug 2 at 4:00 PM PDT. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Mon Jul 22 at 8:30 AM PDT. (DBC-66419) |
Highway 16 Westbound |
Highway 16 (Yellowhead Highway), westbound. Bridge maintenance between George St and Page Rd for 0.8 km (Fort Fraser). Until Wed Aug 7 at 7:00 PM PDT. Right lane closed. Expect delays. Nechako Bridge rehabilitation/construction; vehicle width is restricted to 4m maximum. Last updated Tue Jul 23 at 3:56 PM PDT. (DBC-59853) |
Highway 16 Westbound |
Highway 16 (Yellowhead Highway), westbound. Utility work between Pine Ave and Thackery Rd for 1.1 km (Vanderhoof). Until Thu Jan 16, 2025 at 4:00 PM PST. Lane Closure. Watch for traffic control. Last updated Thu Dec 21, 2023 at 8:15 AM PST. (DBC-59181) |
Highway 16 Westbound |
Highway 16 (Yellowhead Highway), westbound. Utility work between Bunce Rd and Buckingham Rd for 0.6 km (Prince George). Until Wed Jul 31 at 5:30 PM PDT. Shoulder closed. Last updated Tue Jun 25 at 8:23 AM PDT. (DBC-65548) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Maintenance between Goat River West Pit Rd and Goat River East Pit Rd for 6.3 km (37 to 43 km west of McBride). Until Fri Aug 2 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Expect minor delays. Last updated Tue Jul 16 at 8:22 AM PDT. (DBC-66226) |
Highway 19 Both Directions |
Highway 19 (Inland Island Highway), in both directions. Road maintenance work between Dove Creek Rd and Buckley Bay Rd for 29.7 km (Cumberland). Until Mon Sep 30. From 6:00 AM to 8:00 PM PDT on weekdays and Saturday. Lane closures in both directions in effect 24/7. Watch for traffic control. Last updated Thu May 23 at 7:57 AM PDT. (DBC-63557) |
Highway 19A Southbound |
Highway 19A (Island Highway), southbound. Utility work between Northdowne Rd and Bowser Rd for 0.9 km (18 km south of Buckley Bay Ferry Terminal to 18 km north of Qualicum Beach). Until Thu Oct 31 at 5:00 PM PDT. Shoulder closed. Single lane alternating traffic. Expect minor delays. Watermain replacement. Watch for traffic control and speed reduction to 50 km/h in work zone. Last updated Wed Jul 24 at 8:36 AM PDT. (DBC-62321) |
Highway 20 |
Highway 20. Construction work at Polywog Rest Area 10 km east of Tatla Lake. Until Mon Jul 29. From 7:00 AM to 5:00 PM PDT daily. Road open to traffic. Limited access to Rest Area. Please watch for signage and personnel. Last updated Wed Jul 24 at 4:06 PM PDT. (DBC-66540) |
Highway 20 |
Highway 20. Muddy sections between Olsen Dr and Rainbow Range Trailhead for 77.7 km (16 km east of Bella Coola to 39 km west of Anahim Lake). Last updated Fri Jul 26 at 11:09 PM PDT. (DBCRCON-187249) |
Highway 20 Both Directions |
Highway 20, in both directions. Road maintenance work between Fisheries Pool Campground Access Rd and Rainbow Range Trailhead for 36.3 km (17 km east of Firvale to 39 km west of Anahim Lake). Until Wed May 7, 2025. From 7:00 AM to 3:30 PM PDT on weekdays. Single lane alternating traffic. Last updated Tue May 28 at 6:06 PM PDT. (DBC-64459) |
Highway 23 Both Directions |
Highway 23, in both directions. Watch for falling rocks between Revelstoke Dam Avalanche Gates and Downie St - Mica Village for 133.3 km (Revelstoke to 8 km south of Mica Dam). Watch for possible falling rock along the roadway. Last updated Fri Jul 26 at 11:08 PM PDT. (DBC-61914) |
Highway 23 Northbound |
Highway 23, northbound. Utility work planned between Goldstream Rd and Downie St - Mica Village for 48.4 km (5 to 54 km south of Mica Dam). Starting Tue Aug 6 until Fri Aug 16. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. For BC Hydro pole replacement. Speed reduction to 60 km/h. Last updated Tue May 28 at 2:54 PM PDT. (DBC-64321) |
Highway 26 Both Directions |
Highway 26, in both directions. Paving operations at 500 Nyland Lake Rd (16 km east of Quesnel). Until Wed Sep 11 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Lane Closure. Pilot car controlled. Last updated Tue Jul 9 at 7:26 PM PDT. (DBC-66046) |
Highway 28 Both Directions |
Highway 28, in both directions. Construction work planned between Gold River Hwy and Western Mine Rd for 2.5 km (12 to 9 km east of Gold River). Starting Mon Jul 29 at 9:00 AM PDT until Thu Aug 1 at 6:00 PM PDT. Random 5 minute closures to allow Helicopter fly over highway with materials. Last updated Mon Jun 24 at 11:55 AM PDT. (DBC-65355) |
Highway 28 Both Directions |
Highway 28, in both directions. Bridge construction between Gold River Hwy and Western Mine Rd (23 km east of Gold River). Until Wed Jul 31 at 6:00 PM PDT. From 7:00 AM to 6:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Cervus Creek Bridge Replacement: Speed reduction to 30 km/hr through detour, always. Expect 15 min delays. Last updated Mon Jul 22 at 11:31 AM PDT. (DBC-56925) |
Highway 29 Both Directions |
Highway 29, in both directions. Paving operations between 46th St NE and Johnson Creek Rd for 45.3 km (Chetwynd to 14 km south of Hudson's Hope). Until Mon Aug 19. From 6:00 AM to 7:00 PM MST daily. Single lane alternating traffic. Watch for traffic control. Single lane alternating traffic around parked equipment overnight. Last updated Wed Jun 26 at 10:34 AM MST. (DBC-64541) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Road construction work planned at Exit 173: Old Hope Princeton Way (Hope). Starting Thu Aug 1 at 8:00 AM PDT until Thu Aug 1 at 3:00 PM PDT. Possible delays. Traffic Control will be on Old Hope Princeton between 6th Ave and Forest Crescent. Last updated Tue Jul 9 at 3:17 PM PDT. (DBC-66033) |
Highway 3 |
Highway 3 (Crowsnest Highway). Blasting between Exit 177 and First Avalanche Gate for 4.7 km (3 to 8 km east of Hope). Until Fri Aug 2 at 3:00 PM PDT. Road closed intermittently. Last updated Thu Jun 13 at 2:51 PM PDT. (DBC-65173) |
Highway 3 |
Highway 3 (Crowsnest Highway). Utility work planned between Second Avalanche Gate and Allison Pass Summit for 5.4 km (34 to 40 km east of Hope). Starting Mon Jul 29 at 9:00 AM PDT until Sat Aug 3 at 4:00 PM PDT. From 9:00 AM to 4:00 PM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Expect delays. BC Hydro utility work. Last updated Thu Jul 18 at 9:36 AM PDT. (DBC-66306) |
Highway 3 |
Highway 3 (Crowsnest Highway). Special event planned between Allison Pass Summit and Monument 78-Monument 83 Trail for 3.0 km (63 km east of Hope to 62 km west of Princeton). Starting Fri Aug 9 at 4:00 PM PDT until Sat Aug 10 at 4:00 AM PDT. Use caution, watch for runners. Last updated Mon Jun 3 at 12:00 PM PDT. (DBC-64746) |
Highway 3 |
Highway 3 (Crowsnest Highway). Special event between Mertin Rd and Junction Hwy 6NS for 7.0 km (7 to 14 km east of Salmo). Until Tue Jul 30 at 6:00 PM PDT. Watch for traffic control. Expect minor delays. Minor congestion. Last updated Mon Jul 22 at 2:09 PM PDT. (DBC-66429) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Bridge construction at Jaffray Overhead Bridge (5 km east of Jaffray). Until Sat Aug 31. Expect delays. Watch for flagging to allow for trucks to enter and exit site. Watch for speed reductions and crews working in the area. Last updated Sat Jul 13 at 2:32 PM MDT. (DBC-60199) |
Highway 31 |
Highway 31. Watch for falling rocks between Balfour and Block Rd for 73.7 km (1 km south of Meadow Creek to Balfour). Last updated Fri Mar 29 at 8:59 PM PDT. (DBC-61482) |
Highway 33 Both Directions |
Highway 33, in both directions. Crack sealing is underway between Beaverdell Station Rd and Big White Rd for 39.4 km (6 km north of Beaverdell to 24 km south of Kelowna). Until Mon Jul 29 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Single Lane Alternating Traffic and Pilot Car. Reduced speed and traffic control in effect. Expect 20 minutes delays. MOTORCYCLISTS: loose gravel, ride with caution. Last updated Sun Jul 21 at 9:38 AM PDT. (DBC-66392) |
Highway 37 |
Highway 37. Paving operations between Onion Lake and Terrace for 28.4 km (58 to 29 km north of Kitimat). Until Wed Jul 31. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays. Last updated Mon Jun 17 at 11:42 AM PDT. (DBC-65020) |
Highway 37 |
Highway 37. Roadside brushing between Burrage River Bridge and Willow Cr Bridge for 20.9 km (36 km south of Tatogga to 35 km north of Bob Quinn). Until Wed Jul 31 at 5:00 PM PDT. Last updated Tue Jul 2 at 10:46 AM PDT. (DBC-64780) |
Highway 37 Both Directions |
Highway 37, in both directions. Maintenance between Stikine Bridge and Stikine Health Ctr for 51.5 km (30 km north of Iskut to Dease Lake). Until Sat Sep 14. From 7:00 AM to 7:00 PM PDT daily. Lane Closure. Watch for traffic control. Crack Sealing and Sealcoat From 2 Km south of Stikine River bridge to 4 kms past North Stikine Brake check. Last updated Mon Jun 24 at 8:01 AM PDT. (DBC-65485) |
Highway 37 Both Directions |
Highway 37, in both directions. Maintenance between Dease River Bridge and Good Hope Lk Rd for 69.6 km (46 km south of Jade City to 1 km south of Good Hope Lake). Until Mon Oct 14. From 7:00 AM to 7:00 PM PDT daily. Lane Closure. Watch for traffic control. Crack Sealing and Sealcoat From Dease River Bridge to Good Hope Lake. Last updated Mon Jun 24 at 7:44 AM PDT. (DBC-65484) |
Highway 39 Southbound |
Highway 39, southbound. Utility work between Cicada Rd and the start of Highway 39 for 27.0 km (Mackenzie to Mackenzie Junction). Until Mon Jul 29 at 7:00 PM PDT. Shoulder closed. Last updated Tue Jul 16 at 8:38 AM PDT. (DBC-66228) |
Highway 39 Northbound |
Highway 39, northbound. Utility work between Centennial Dr and McIntyre Dr for 0.9 km (Mackenzie). Until Mon Jul 29 at 7:00 PM PDT. Shoulder closed. Last updated Tue Jul 16 at 8:43 AM PDT. (DBC-66229) |
Highway 3A Both Directions |
Highway 3A, in both directions. Utility work between Upper Bench Rd and Liddicoat Rd for 0.9 km (Keremeos to 1 km east of Keremeos). Until Fri Aug 9. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Expect delays. Last updated Tue Jul 23 at 8:27 AM PDT. (DBC-66476) |
Highway 3A |
Highway 3A. Watch for falling rocks between Fraser Subdivision Rd and Junction Hwy 3 for 77.6 km (1 km south of Kootenay Bay Ferry Landing to Creston). Last updated Fri Mar 29 at 8:58 PM PDT. (DBC-61894) |
Highway 4 Eastbound |
Highway 4, eastbound. Utility work between Ehlers St and Industrial Way for 0.4 km (Tofino). Until Sun Sep 1 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watermain tie-in, pump station installation, decommissioning of existing pump station, Sanitary manhole installations, Sanitary pipe installations. Watch for Traffic control personnel. Last updated Tue Apr 2 at 9:32 AM PDT. (DBC-61568) |
Highway 4 Both Directions |
Highway 4, in both directions. Maintenance between Port Alberni Summit and Chalet Rd for 9.5 km (Cathedral Grove). Vehicles/loads over 3.2m in width must contact Permit Centre for instructions at 1-800-559-9688. Next update time Wed Jul 31 at 10:00 AM PDT. Last updated Fri Jun 28 at 9:23 AM PDT. (DBC-52953) |
Highway 5 |
Highway 5 (Coquihalla South). Bridge maintenance between the start of Highway 5 (Coquihalla South) and Exit 183: Othello Rd (2 km north of Hope). Until Fri Aug 2 at 7:00 PM PDT. Right lane closed. Crews are doing bridge deck maintenance on Nicolum Bridge on Highway 5, Monday thru Friday. The closure will be in the Southbound Slow lane. Last updated Sat Jul 20 at 1:41 AM PDT. (DBC-66365) |
Highway 5 Southbound |
Highway 5 (Coquihalla South), southbound. Construction work planned between Exit 183: Othello Rd and the start of Highway 5 (Coquihalla South) for 6.2 km (6 km north of Hope to Hope). Starting Tue Jul 30 at 6:00 AM PDT until Mon Sep 30 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT daily. Right lane will be closed. Expect delays. Right lane closed for work site access. Last updated Fri Jul 26 at 3:03 PM PDT. (DBC-66612) |
Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Road maintenance work between Exit 183: Othello Rd and Exit 192 (15 km north of Hope). Until Fri Sep 13. From 9:00 AM to 5:00 PM PDT daily. Right lane closed. Watch for traffic control. Last updated Tue Jun 4 at 11:21 AM PDT. (DBC-64797) |
Highway 5 Northbound |
Highway 5 (Coquihalla North), northbound. Vehicle recovery planned between Exit 336: Walloper and Chuwhels Mountain Rd (16 km south of Kamloops). Starting Sat Jul 27 at 7:00 AM PDT until Sat Jul 27 at 4:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. Expect delays. Per Connor Roesnik. Last updated Fri Jul 26 at 2:53 PM PDT. (DBC-66611) |
Highway 5 Both Directions |
Highway 5, in both directions. Construction work between Carilla Rd and Clough Rd for 3.7 km (11 to 7 km south of Barriere). Shoulder closed. Watch for traffic control. Next update time Sat Sep 28 at 9:00 AM PDT. Last updated Mon Jul 22 at 4:35 PM PDT. (DBC-66432) |
Highway 5 Northbound |
Highway 5, northbound. Utility work planned between Webb Rd and Mount Olie St for 1.9 km (Little Fort). Starting Tue Aug 6 until Fri Aug 9. From 8:00 AM to 4:00 PM PDT daily. Lane Closure. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Fri Jul 19 at 11:21 AM PDT. (DBC-66286) |
Highway 5 Southbound |
Highway 5, southbound. Utility work between Bain Rd and Clearwater Village Rd for 1.4 km (Clearwater). Until Wed Jul 31. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Last updated Tue Jun 25 at 3:27 PM PDT. (DBC-65568) |
Highway 5A Both Directions |
Highway 5A, in both directions. Construction work at Airport Rd (Princeton). Until Wed Jul 31 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on Tuesday, Wednesday and Thursday. Single lane alternating traffic. Work is between Airport Road and Coyote Valley Rd. Please obey all construction signs and watch for crews and equipment. Last updated Mon Jul 15 at 3:11 PM PDT. (DBC-66203) |
Highway 5A |
Highway 5A. Watch for falling rocks between the start of Highway 5A and Gulliford Lake Rest Area for 37.5 km (2 km south of Gulliford Lake Rest Area to Princeton). Last updated Fri Jul 26 at 11:07 PM PDT. (DBC-58676) |
Highway 6 EW |
Highway 6 EW. Wildlife advisory in effect between Chouinard Rd and Monashee Summit for 42.0 km (Cherryville to 1 km west of Monashee Summit). Until Mon Sep 2 at 12:00 PM PDT. Last updated Thu Jul 25 at 2:36 PM PDT. (DBC-55876) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Construction work planned between United Blvd and Schoolhouse St for 1.3 km (Coquitlam). Starting Sat Jul 27 at 10:00 AM PDT until Fri Aug 2 at 1:00 PM PDT. From 10:00 AM to 1:00 PM PDT daily. Right lane will be closed. Last updated Fri Jul 26 at 3:58 PM PDT. (DBC-66616) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Utility work between 240 St and River Rd for 3.9 km (Maple Ridge). Until Mon Aug 26. From 8:00 AM to 4:00 PM PDT daily. Right lane closed. Watch for traffic control. Expect delays. Last updated Tue Jul 23 at 1:17 PM PDT. (DBC-66491) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between 263 St and 280 St for 2.2 km (Maple Ridge). Until Sat Aug 17. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Lane Closure. Expect delays. Street Widening Project. BC Day Long Weekend Holiday August 3 -5 No Traffic Disruptions. Last updated Mon Jul 22 at 9:33 AM PDT. (DBC-65952) |
Highway 7 Eastbound |
Highway 7 (Lougheed Highway), eastbound. Tree pruning planned between 287 St and St. Anthony's Way for 1.8 km (Mission to Maple Ridge). Starting Tue Jul 30 at 7:00 AM PDT until Thu Aug 8 at 3:00 PM PDT. From 7:00 AM to 3:00 PM PDT daily. Right lane will be closed. Shoulder will be closed. Watch for traffic control personnel. Expect minor delays. No lane closure between noon Aug 2nd and noon Aug 6th for BC Day long weekend. Last updated Mon Jul 15 at 1:44 PM PDT. (DBC-66193) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Tree pruning between Wren St and 287 St for 6.2 km (Mission). Until Mon Jul 29 at 3:00 PM PDT. From 7:00 AM to 3:00 PM PDT daily. Shoulder closed. Right lane is blocked. Expect delays. Last updated Thu Jul 11 at 3:31 PM PDT. (DBC-66105) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Utility work planned at Taylor Rd (13 km east of Mission). Starting Mon Jul 29 at 7:00 AM PDT until Thu Aug 1 at 5:00 PM PDT. Right lane will be blocked. Last updated Mon Jul 22 at 4:24 PM PDT. (DBC-66439) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Geotechnical investigation planned between Scowlitz Access Rd and Beach Camp Rd for 0.7 km (5 to 4 km west of Kent). Starting Thu Aug 22 at 7:00 AM PDT until Thu Aug 22 at 7:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Fri Jul 26 at 11:50 AM PDT. (DBC-66602) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Utility work planned between Highlands Blvd and Bodnar Rd for 5.8 km (Kent). Starting Tue Jul 30 at 8:00 AM PDT until Fri Aug 30 at 4:00 PM PDT. Right lane will be closed in both directions. BC Hydro Utility work; pole replacements along Lougheed Highway. Speed reduction to 60 km/hr. Last updated Mon Jul 22 at 4:06 PM PDT. (DBC-66436) |
Highway 7 Southbound |
Highway 7 (Lougheed Highway), southbound. Utility work planned between McCaffrey Rd and McRae Rd for 0.7 km (Kent). Starting Tue Aug 6 until Fri Aug 9. From 10:00 AM to 2:00 PM PDT daily. Right lane will be closed. Watch for traffic control personnel. Last updated Wed Jul 24 at 12:37 PM PDT. (DBC-66525) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Utility work planned between Chief Hali Rd and Seabird Island Rd for 3.2 km (Kent). Starting Tue Aug 6 until Fri Aug 9. From 10:00 AM to 2:00 PM PDT daily. Right lane will be closed. Speed reduction to 50 km/h. Watch for traffic control. Last updated Wed Jul 24 at 12:41 PM PDT. (DBC-66526) |
Highway 9 Northbound |
Highway 9, northbound. Utility work planned at McPherson Rd (Kent). Starting Thu Aug 8 at 10:00 AM PDT until Fri Aug 9 at 3:00 PM PDT. From 10:00 AM to 3:00 PM PDT on Thursday and Friday. Right lane will be closed. Watch for traffic control personnel. Speed reduced to 60 km/h. Last updated Wed Jul 24 at 12:45 PM PDT. (DBC-66527) |
Highway 91 Southbound |
Highway 91, southbound. Bridge maintenance at Alex Fraser Bridge (Delta). Until Mon Sep 30 at 11:00 PM PDT. Watch for traffic control. Southbound sidewalk closed. Entire Length of Structure, West Side Downstream side. Northbound Sidewalk will remain open - East Side. Last updated Mon May 20 at 11:45 AM PDT. (DBC-64177) |
Highway 91 Southbound |
Highway 91, southbound. Bridge maintenance at Alex Fraser Bridge (Delta). Until Sat Sep 28 at 11:00 AM PDT. From 7:00 AM to 11:00 AM PDT on Saturday. Right lane closed. Watch for traffic control. Saturday's only. Last updated Tue Jul 9 at 6:18 AM PDT. (DBC-65988) |
Highway 91 Both Directions |
Highway 91, in both directions. Bridge maintenance planned between Annacis Channel Bridge and Alex Fraser Bridge for 1.9 km (Delta to New Westminster). Starting Sun Jul 28 at 10:00 PM PDT until Mon Jul 29 at 4:00 AM PDT. Right lane will be closed in both directions. Watch for traffic control personnel. Last updated Wed Jul 24 at 4:01 PM PDT. (DBC-66539) |
Highway 91 Northbound |
Highway 91, northbound. Bridge maintenance planned at Alex Fraser Bridge (Delta). Starting Mon Jul 29 at 9:00 PM PDT until Wed Jul 31 at 4:00 AM PDT. From 9:00 PM to 4:00 AM PDT on Monday, Tuesday and Wednesday. Lane Closure. Watch for traffic control personnel. Travel direction will be down to 2 lanes.
Follow direction of traffic control equipment and devices, please drive with caution for road conditions. Last updated Fri Jul 26 at 7:48 AM PDT. (DBC-66576) |
Highway 91 Southbound |
Highway 91, southbound. Bridge maintenance planned at Alex Fraser Bridge (Delta). Starting Wed Jul 31 at 9:00 PM PDT until Fri Aug 2 at 4:00 AM PDT. Lane Closure. Watch for traffic control personnel. Last updated Fri Jul 26 at 8:44 AM PDT. (DBC-66593) |
Highway 93 Both Directions |
Highway 93, in both directions. Construction work between Radium Hill Rd and Stanley St (1 km south of Radium Hot Springs). Until Thu Oct 31. From 7:00 AM to 6:00 PM MDT on weekdays and Saturday. Roadway reduced to one lane. Expect minor delays. The traffic will be reduced to 50km/hr. Last updated Mon Jun 17 at 9:11 AM MDT. (DBC-65247) |
Highway 97 |
Highway 97. Utility work planned between Willow Springs Trail and 4 Mile Lake. Starting Mon Jul 29 until Wed Jul 31. From 9:00 AM to 4:00 PM PDT on Monday, Tuesday and Wednesday. Southbound lane will be closed. Expect minor delays. Please watch for signage and personnel. Expect minor delays of up to five minutes. Last updated Fri Jul 26 at 8:46 AM PDT. (DBC-66594) |
Highway 97 Both Directions |
Highway 97, in both directions. Paving operations between Okanagan Game Farm Rd and W Duncan Ave for 10.9 km (Penticton). Until Tue Aug 20 at 7:00 AM PDT. Lane Closure. Delays up to 15 minute. Please watch for and obey the instructions of Traffic Control Personnel. Last updated Thu Jul 18 at 2:29 PM PDT. (DBC-66292) |
Highway 97 Both Directions |
Highway 97, in both directions. Maintenance between Abbott St and Old Vernon Rd for 10.0 km (Kelowna). Until Thu Oct 31 at 6:00 AM PDT. Centre lane is closed in both directions. Median Landscaping - Intermittently moving work between 10 pm and 6 am Monday, Tuesday, Wednesday from July 24 to October 31. Centre lane closed in both directions. Delay length of 5 minutes in all directions. Last updated Thu Jul 25 at 1:24 PM PDT. (DBC-66569) |
Highway 97 Both Directions |
Highway 97 (Cariboo Connector), in both directions. Bridge construction between Stephenson Rd and Stage Rd for 0.1 km (Cache Creek). Until Mon Sep 30 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays. Expect minor delays. Last updated Thu Jul 18 at 12:47 PM PDT. (DBC-65990) |
Highway 97 |
Highway 97 (Cariboo Connector). Utility work planned between First St and Exeter Station Rd (100 Mile House). Starting Tue Jul 30 at 9:00 AM PDT until Tue Jul 30 at 1:00 PM PDT. Roadway will be reduced to two lanes. Expect minor delays. Please watch for personnel and signage. Expect minor delays of up to five minutes. Last updated Fri Jul 26 at 8:58 AM PDT. (DBC-66595) |
Highway 97 |
Highway 97 (Cariboo Connector). Utility work between Canim-Hendrix Lake Rd and Dawson Rd for 5.3 km (100 Mile House). Until Fri Aug 30. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Pole installations on 103 Mile Hill. Speed reduction to 50 km/h. Different closures required for different sections within the work span. Intermittent stoppages to occur for 3 mins max (ITC) when cable is crossing the Highway as needed. Last updated Fri Jun 7 at 3:46 PM PDT. (DBC-64956) |
Highway 97 Northbound |
Highway 97 (Cariboo Connector), northbound. Paving operations between Lynes Creek Rd and Robertson Rd for 10.5 km (21 to 10 km north of Wildwood). Until Sat Oct 5. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Expect delays. Next update time Sat Aug 10 at 10:00 AM PDT. Last updated Wed Jul 17 at 7:42 PM PDT. (DBC-66273) |
Highway 97 |
Highway 97 (Cariboo Connector). Utility work between Racing Rd and Nelson St for 2.1 km (Quesnel). Until Fri Aug 9 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT on weekdays. Centre lane closed. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Mon Jul 22 at 4:12 PM PDT. (DBC-66360) |
Highway 97 Northbound |
Highway 97 (Cariboo Connector), northbound. Utility work planned between Ten Mile Lake Rd and Bjornson Rd for 1.4 km (8 to 7 km north of Quesnel). Starting Sat Jul 27 at 6:00 AM PDT until Sat Jul 27 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Expect 5 minute delays. Please watch for signs and personnel. Last updated Wed Jul 24 at 2:58 PM PDT. (DBC-66536) |
Highway 97 |
Highway 97 (Cariboo Connector). Road construction work between Pollard Rd and Umiti Pit Rd for 3.8 km (15 to 11 km north of Quesnel). Until Fri Oct 25. From 7:00 AM to 7:00 PM PDT daily. Northbound lane closure. Expect minor delays. Please watch for signage and personnel. Expect speed reductions as well as minor delays of up to 20 minutes. Last updated Fri Jul 26 at 1:48 PM PDT. (DBC-66606) |
Highway 97 Northbound |
Highway 97 (Cariboo Connector), northbound. Utility work planned between Wade Rd and Plett No 1 Rd for 0.5 km (8 to 7 km south of Hixon). Starting Wed Jul 31 at 9:00 AM PDT until Wed Jul 31 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Expect delays of 5 minutes. Please watch for signs and personnel. Last updated Thu Jul 25 at 2:06 PM PDT. (DBC-66571) |
Highway 97 |
Highway 97. Road construction work between 22nd Ave and 18th Ave (Prince George). From 7:00 AM to 5:00 PM PDT on Monday and Tuesday. Southbound lane closure. Last updated Mon Jul 22 at 6:39 AM PDT. (DBC-66407) |
Highway 97 |
Highway 97. Construction work between Burgess Rd and Jorgenson Rd (Prince George). Until Fri Aug 2 at 5:00 PM PDT. Single lane alternating traffic. Expect delays. Watch for traffic control. Last updated Fri Jul 26 at 8:23 AM PDT. (DBC-66592) |
Highway 97 Both Directions |
Highway 97, in both directions. Bridge construction between Powder King Rd and Old Hasler Rd (49 km south of Chetwynd). Single lane alternating traffic and detour at Fisher Creek Bridge. Estimated time of re-opening Thu Oct 31 at 7:00 AM MST. Next update time Mon Sep 16 at 7:00 AM MST. Last updated Tue Jul 16 at 10:46 AM MST. (DBC-66238) |
Highway 97 |
Highway 97. Utility work between Hillview Access Rd and Access Rd for 1.9 km (Chetwynd). Until Mon Jul 29. From 7:00 AM to 7:00 PM MST on weekdays. Shoulder closed. Watch for traffic control. Last updated Tue Jul 2 at 10:04 AM MST. (DBC-65741) |
Highway 97 |
Highway 97. Shoulder maintenance between Weiland Rd and Wabi Estates for 4.2 km (Chetwynd). From 7:00 AM to 7:00 PM MST on Tuesday and Wednesday. Single lane alternating traffic. Watch for traffic control. Last updated Tue Jul 23 at 5:53 AM MST. (DBC-66462) |
Highway 97 Both Directions |
Highway 97 (Alaska Highway), in both directions. Bridge construction between Macdonald Campground Access Rd and Liard River Hotsprings Access Rd (301 km north of Fort Nelson). Until Mon Sep 30. Single lane alternating traffic. Watch for traffic control. Work on the Liard River Bridge. Maximum width of 3.5m for all traffic crossing the bridge. Last updated Wed Jul 10 at 8:24 AM MST. (DBC-66045) |
Highway 97A |
Highway 97A. Construction work between Fortune Rd and King Ave for 0.3 km (Enderby). Until Sat Aug 10. Watch for traffic control. Intermittent minor stoppages. Last updated Fri Jul 19 at 4:14 PM PDT. (DBC-66367) |
Highway 99 Southbound |
Highway 99, southbound. Road maintenance work at Exit 20 (Delta). Until Fri Aug 23 at 3:00 PM PDT. From 7:00 AM to 3:00 PM PDT on weekdays. Lane Closure. Watch for traffic control. Highway 99 South Bound Bus lane approximately 1000m before Exit 20 - Ladner Trunk Rd. Last updated Thu Jul 25 at 10:00 AM PDT. (DBC-66562) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work between Exit 20 and Exit 26 for 4.7 km (Delta). Until Thu Oct 31. Right turn lane closed. Right lane closed. For ground densification and improvement. Last updated Fri Jul 26 at 3:16 PM PDT. (DBC-66614) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work between Exit 20 and Exit 26 for 4.7 km (Delta). Until Thu Aug 1 at 11:45 PM PDT. Bus lane closed. For ground densification and improvement. Last updated Wed Jun 5 at 2:15 PM PDT. (DBC-64815) |
Highway 99 Northbound |
Highway 99, northbound. Utility work planned between Exit 26 and Exit 28 for 2.5 km (Delta). Starting Sat Jul 27 at 9:00 AM PDT until Sat Jul 27 at 3:00 PM PDT. Lane will be blocked. Last updated Fri Jul 19 at 5:10 PM PDT. (DBC-66371) |
Highway 99 Both Directions |
Highway 99, in both directions. Road maintenance work planned between Exit 3: Horseshoe Bay Junction and Alpha Lake Rd for 94.3 km (West Vancouver to Whistler). Starting Mon Jul 29 at 7:30 AM PDT until Thu Aug 1 at 5:30 PM PDT. Watch for a slow moving vehicle. Last updated Fri Jul 26 at 2:10 PM PDT. (DBC-66609) |
Highway 99 Northbound |
Highway 99, northbound. Utility work planned at Lions Bay Ave (Lions Bay). Starting Mon Jul 29 at 7:30 AM PDT until Thu Aug 1 at 5:30 PM PDT. Left lane will be blocked. Last updated Fri Jul 26 at 2:05 PM PDT. (DBC-66607) |
Highway 99 Northbound |
Highway 99, northbound. Utility work between Scott Cres and Cleveland Ave (Squamish). Until Sun Aug 4. Right turn lane closed. Shoulder closed. Watch for traffic control. Last updated Mon Jul 1 at 6:30 AM PDT. (DBC-61357) |
Highway 99 Southbound |
Highway 99, southbound. Utility work planned at Alpha Lake Rd (Whistler). Starting Tue Jul 30 at 7:30 AM PDT until Tue Jul 30 at 5:30 PM PDT. Right lane will be closed. Tree removal, up to 10 min stoppages possible. Last updated Fri Jul 26 at 2:08 PM PDT. (DBC-66608) |
Highway 99 |
Highway 99. Utility work planned between Lorimer Rd and Nancy Greene Dr for 0.6 km (Whistler). Starting Thu Aug 8 at 7:00 AM PDT until Thu Aug 8 at 5:00 PM PDT. Shoulder will be closed. Last updated Fri Jul 19 at 6:42 PM PDT. (DBC-66373) |
Highway 99 Southbound |
Highway 99, southbound. Utility work planned between Blackcomb Way and Nancy Greene Dr for 0.7 km (Whistler). Starting Thu Aug 8 at 7:00 AM PDT until Thu Aug 8 at 5:00 PM PDT. Shoulder will be closed. Last updated Fri Jul 19 at 6:41 PM PDT. (DBC-66372) |
Highway 99 Southbound |
Highway 99, southbound. Utility work planned between Blackcomb Way and Nancy Greene Dr for 0.6 km (Whistler). Starting Tue Aug 13 at 7:00 AM PDT until Wed Aug 14 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on Tuesday and Wednesday. Shoulder will be closed. Watch for traffic control personnel. Last updated Thu Jul 11 at 10:39 AM PDT. (DBC-66096) |
Highway 99 Both Directions |
Highway 99, in both directions. Line painting planned between Emerald Dr and Riverside Dr for 5.8 km (Whistler). Starting Tue Aug 6 at 9:00 PM PDT until Thu Aug 8 at 6:00 AM PDT. Single lane alternating traffic will be in effect. Last updated Wed Jul 24 at 8:23 PM PDT. (DBC-66545) |
Highway 99 Northbound |
Highway 99, northbound. Construction work planned between Park St and Portage Rd (Pemberton). Starting Thu Aug 15 at 8:00 AM PDT until Sun Sep 29 at 6:00 PM PDT. Shoulder will be closed. Work is for the drilling of new watermain at junction of Pemberton Meadows Road and Collins Road. Last updated Wed Jun 26 at 4:07 PM PDT. (DBC-65613) |
Other Roads |
Old Alaska Highway. Geotechnical investigation at Kiskatinaw Curved Bridge 30 km north of Dawson Creek. Bridge closed. Slide impacting bridge structure, assessment underway. Next update time Wed Oct 2 at 10:00 AM MST. Last updated Tue Jul 2 at 10:23 AM MST. (DBC-30093) |
Other Roads Both Directions |
Youngsberg Road, in both directions. Bridge construction at Youngsberg Bridge near Princeton. Road closed. Estimated time of opening not available. No vehicle or pedestrian crossing available. Next update time Mon Sep 9 at 3:00 PM PDT. Last updated Mon Jul 8 at 3:46 PM PDT. (DBC-35978) |
Other Roads Both Directions |
Halston Avenue Connector, in both directions. Bridge construction between Kingston Avenue and Salish Road in Kamloops. Lane closures in both directions in effect. Watch for traffic control. Possible delays. Next update time Mon Sep 30 at 9:00 AM PDT. Last updated Thu Jun 6 at 3:09 PM PDT. (DBC-61191) |
Other Roads Both Directions |
Cedar Road, in both directions. Utility work between Duke Point Highway and MacMillan Road near Nanaimo. Until Wed Jul 31 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Watermain and water service replacement for North Cedar Improvement District, please proceed with caution. Last updated Thu Mar 14 at 2:43 PM PDT. (DBC-61661) |
Other Roads Both Directions |
Rockwell Dr, in both directions. Road construction work at 6.3km north of Harrison Hot Springs. Until Fri Sep 13. Single lane alternating traffic. 24/7. Last updated Mon Apr 15 at 10:18 AM PDT. (DBC-62705) |
Other Roads Both Directions |
Mt Seymour Parkway, in both directions. Road maintenance work between Seymour Blvd and Seymour River Place. Until Thu Aug 1 at 7:00 PM PDT. Line painting. Lane Closure. Watch for traffic control. Last updated Mon Jun 3 at 2:19 PM PDT. (DBC-64751) |
Other Roads Both Directions |
E Porpoise Bay Rd, in both directions. Construction work between Wharf Ave and Schetxwen Rd. Until Thu Oct 31 at 6:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Expect minor delays. Next update time Thu Oct 31 at 10:00 AM PDT. Last updated Wed Jun 5 at 3:41 PM PDT. (DBC-64787) |
Other Roads Both Directions |
Othello Road, in both directions. Road construction work planned between Highway 5 and Tunnel Road. Starting Tue Jul 30 at 6:00 AM PDT until Tue Dec 31 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Expect delays. Last updated Fri Jul 26 at 2:59 PM PDT. (DBC-64917) |
Other Roads Both Directions |
Tzouhalem Road, in both directions. Road construction work between Cowichan Bay Road and Samuel Road. Until Mon Mar 24, 2025 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Shoulder closed. Last updated Mon Jun 17 at 7:52 AM PDT. (DBC-65244) |
Other Roads |
Ashnola Rd. Bridge maintenance between River Rd and Highway 3. Until Fri Aug 2. From 8:30 AM to 3:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Road closed. Bridge will re-open after 3:00pm daily. Last updated Thu Jun 20 at 11:13 AM PDT. (DBC-65385) |
Other Roads Westbound |
University Blvd, westbound. Geotechnical investigation between Westbrook Mall and Blanca St. Until Sat Jul 27. From 7:30 AM to 7:00 PM PDT on weekdays. Road closed. Utility work. Last updated Wed Jul 3 at 11:59 AM PDT. (DBC-65805) |
Other Roads Southbound |
Ford Road, southbound. Special event planned between Highway 4A and Burgoyne Road. Starting Sat Aug 10 at 9:00 AM PDT until Sun Aug 11 at 5:00 PM PDT. Southbound lane will be closed. Detour planned. Coombs Fair. Ford Road closed to southbound traffic 200M South of Hwy 4A. Access to Coombs Fair from Burgoyne Road. Detour to Station Road then Burgoyne Road then Ford Road. Last updated Wed Jul 17 at 8:58 AM PDT. (DBC-66267) |
Other Roads |
Resort Drive. Construction work planned between Rathtrevor Road and Highway 19A near Parksville. Starting Tue Jul 30 at 10:00 AM PDT until Thu Aug 1 at 5:00 PM PDT. Shoulder will be closed. Watch for traffic control personnel. Borehole drilling. Expect minor delays. Last updated Thu Jul 18 at 3:01 PM PDT. (DBC-66327) |
Other Roads |
Upper Halfway Road. Bridge damaged at Forestry Bridge. Due to vehicle incident. Assessment in progress. Bridge railing damaged and missing, proceed with caution. Last updated Fri Jul 26 at 11:07 PM MST. (DBC-66333) |
Other Roads |
Knight St.. Construction work planned between Bridgeport Rd. And Highway 91. Starting Mon Jul 29 at 10:00 PM PDT until Tue Jul 30 at 6:00 AM PDT. Centre lane will be blocked. Right lane will be blocked. Repair of Cambie Overpass. Last updated Mon Jul 22 at 3:35 PM PDT. (DBC-66435) |
Other Roads |
Lower Cache. Bridge maintenance planned at km 3.5. Starting Sun Jul 28 at 6:00 AM MST until Mon Jul 29 at 6:00 PM MST. Road will be closed for repairs. Detour will not be available. Last updated Mon Jul 22 at 5:06 PM MST. (DBC-66440) |
Other Roads |
254 Road. Bridge maintenance planned at km 6.5. Starting Mon Jul 29 at 6:00 AM MST until Tue Jul 30 at 6:00 AM MST. Road will be closed for repairs. Detour planned. The 254 Road will be closed at the bridge site for up to 24 hours, with a detour available via the 285 Road żżż Becker Road (285M) to the 256 Road żżż Becker Hill Road (256B). Last updated Mon Jul 22 at 5:23 PM MST. (DBC-66443) |
Other Roads |
256 Road. Bridge maintenance planned at km 7.5. Starting Tue Jul 30 at 6:00 AM MST until Wed Jul 31 at 6:00 AM MST. Road will be closed for repairs. The 256 Road will be closed at km 7.5 at the bridge site for up to 24 hours. A detour is available via the Prespatou Road (193), 258 Road żżż Jeffrey Road (258) and the 271 Road żżż Montney North Road (271N). Last updated Mon Jul 22 at 5:45 PM MST. (DBC-66444) |
Other Roads Northbound |
Puntzi Lake rd, northbound. Utility work between Southwood Rd and 5KM N of Southwood Rd. Until Fri Aug 9. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Wed Jul 24 at 1:42 PM PDT. (DBC-66530) |
Other Roads Both Directions |
East and West, in both directions. Utility work planned between Bryden Rd and Barber Rd near Kelowna. Starting Tue Sep 24 at 9:00 AM PDT until Tue Sep 24 at 3:00 PM PDT. Lane Closure. Fibre Optic removal and placement. Single lane closure between Bryden Rd and Barber Rd. Approx. Delay of 5 minutes east and west bound. Last updated Thu Jul 25 at 1:35 PM PDT. (DBC-66570) |
Other Roads Eastbound |
Chancellor Boulevard, eastbound. Utility work planned at Acadia. Starting Thu Aug 1 at 9:00 AM PDT until Thu Aug 15 at 5:00 PM PDT. Right lane will be closed. Last updated Thu Jul 25 at 3:35 PM PDT. (DBC-66573) |
Other Roads Both Directions |
NW Marine Drive, in both directions. Utility work at Acadia Rd. Until Tue Dec 31 at 7:00 PM PDT. Lane Closure. NW Marine Dr. And Acadia Rd sewer separation and watermain work. Last updated Thu Jul 25 at 4:32 PM PDT. (DBC-66577) |
Other Roads Both Directions |
Upper Highway 7 , in both directions. Maintenance between Murrey St. And Catherwood. Until Sun Aug 25. Single lane alternating traffic. Watch for traffic control. Night work only. Last updated Fri Jul 26 at 12:18 PM PDT. (DBC-66603) |
Other Roads Westbound |
Highway 7 (Lougheed Highway), westbound. Paving operations planned between Horne St and Welton St. Starting Thu Aug 1 at 8:00 AM PDT until Thu Aug 1 at 4:00 PM PDT. Right lane will be closed. Expect delays. Last updated Fri Jul 26 at 12:31 PM PDT. (DBC-66604) |
Other Roads |
Hwy 97. Utility work planned between Williams Lake Visitors Center and Mackenzie Ave S. Starting Tue Jul 30 until Thu Aug 15. From 8:00 AM to 4:00 PM PDT on weekdays. Northbound lane will be closed. Please watch for personnel and signage. Expect minor delays of up to five minutes. Last updated Fri Jul 26 at 2:38 PM PDT. (DBC-66610) |
Other Roads Eastbound |
Chancellor Blvd, eastbound. Road construction work planned at Hamber Rd. Starting Mon Jul 29 at 9:00 AM PDT until Mon Jul 29 at 4:00 PM PDT. Right lane will be blocked. Bus Shelter installation. Last updated Fri Jul 26 at 3:07 PM PDT. (DBC-66613) |
Road 40 |
Road 40 (Lillooet-Pioneer Rd). Utility work between Gun Creek Pit Rd and Mission Mountain Rd for 48.0 km (91 to 43 km west of Lillooet). Until Mon Sep 23. From 8:00 AM to 8:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 20 minutes. Please watch for signage and personnel. Last updated Fri Jun 7 at 3:58 PM PDT. (DBC-64947) |
Road 40 |
Road 40 (Lillooet-Pioneer Rd). Bridge maintenance planned at Gun Creek Pit Rd (91 km west of Lillooet). Starting Tue Jul 30 at 7:00 AM PDT until Wed Jul 31 at 4:00 PM PDT. From 7:00 AM to 4:00 PM PDT on Tuesday and Wednesday. Single lane alternating traffic will be in effect. Please slow down and watch for flaggers. Expect 20 minute delays. Last updated Fri Jul 26 at 7:55 AM PDT. (DBC-66590) |
Upper Arrow Lake Ferry Both Directions |
Upper Arrow Lake Ferry, in both directions. Departure delayed at Upper Arrow Lake Ferry (Upper Arrow Lake). From 8:45 AM to 11:00 AM PDT on Wednesday. Departure delayed every Wednesday for fueling purposes. Next update time Fri Aug 2 at 12:00 PM PDT. Last updated Fri Jul 26 at 2:12 PM PDT. (DBC-61297) |