• All Events
  • Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Paving operations planned at Exit 29: Willingdon Ave (Burnaby). Starting Wed Sep 17 at 10:00 PM PDT until Thu Sep 18 at 6:00 AM PDT. Entrance ramp will be closed. Exit ramp will be closed. Emergency vehicle access available. Next update time Thu Sep 18 at 6:00 AM PDT. Last updated Wed Sep 17 at 10:28 AM PDT. (DBC-81696)
    Highway 1 Highway 1 (TransCanada Highway). Construction work between 248 St and Bradner Rd for 5.7 km (Langley - District). Until Tue Sep 30. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:00 AM PDT on weekdays. Lane closures in both directions in effect. Full highway closures from 11:00PM to 4:30AM as needed. Traffic diverted to Exit 73 on and off-ramps at those times. Next update time Tue Sep 30. Last updated Mon Jul 28 at 2:30 PM PDT. (DBC-79804)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work planned between 248 St and Exit 73 for 3.6 km (Langley - District). Starting Wed Oct 1 at 8:30 PM PDT until Mon Nov 30, 2026 at 5:30 AM PDT. Watch for traffic control personnel. Lane closures in both directions planned. Next update time Sun Nov 30 at 5:30 AM PDT. Last updated Mon Sep 15 at 7:52 PM PDT. (DBC-81619)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Construction work at Exit 73 (Langley - District). Until Wed Dec 31 at 7:00 PM PDT. Exit ramp is closed. Current westbound offramp loop is closed. A new offramp will open before the overpass. Exit the highway and turn left or right onto 264th Street. Next update time Wed Dec 31 at 7:00 AM PDT. Last updated Sat Aug 2 at 11:01 PM PDT. (DBC-76914)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work between Gladwin Rd and Nicomen River Rd for 1.1 km (10 to 11 km east of Lytton). Single lane alternating traffic. Work takes place from 7:00am-5:30pm daily beginning September 17. Expect up to 40 minute delays due to railway crossing / construction activities. Next update time Sun Sep 21 at 10:00 AM PDT. Last updated Tue Sep 16 at 6:03 PM PDT. (DBC-75637)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. 60km/h work zone. 80km/h outside construction hours. Watch for traffic control. Next update time Sat Sep 20 at 5:00 PM PDT. Last updated Sat Aug 16 at 12:40 PM PDT. (DBC-64961)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Bolton Rd for 4.5 km (Tappen). Until Wed Dec 31. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Speed limit 60 km/h. Single lane alternating traffic and intermittent stoppages. Expect delays up to 20 min delays. Watch for traffic control. Next update time Mon Dec 1 at 9:00 AM PDT. Last updated Sat Sep 13 at 6:42 AM PDT. (DBC-72306)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Tappen Beach Rd and 65 Ave NW for 2.6 km (Salmon Arm to 2 km east of Tappen). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Expect minor delays. Next update time Fri Sep 26 at 9:00 AM PDT. Last updated Mon Sep 15 at 9:17 AM PDT. (DBC-72305)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 8:00 PM to 6:00 AM PDT on weekdays and Saturday. Single lane alternating traffic. Hwy closed 9am-3pm M-F and Sat. Watch for traffic control. Use alternate route Hwy 97A and 97B. Next update time Wed Sep 24 at 12:00 PM PDT. Last updated Wed Sep 17 at 7:32 AM PDT. (DBC-70490)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Rock scaling at West Boundary of Mount Revelstoke National Park (1 km west of West Boundary of Mount Revelstoke National Park). Until Thu Oct 30 at 7:00 PM PDT. Work is 19km to 28km east of Revelstoke. Expect speed reductions to 50 km/h in work zone, flag persons, lane closures and delays up to 20 minutes. Next update time Thu Oct 30 at 7:00 PM PDT. Last updated Tue Sep 9 at 12:05 PM PDT. (DBC-81113)
    Highway 1 Highway 1 (TransCanada Highway). Construction work between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Expect up to 30 minute delays and single lane alternating traffic anytime. 2hr closures 3:30am - 5:30am Tues-Sat mornings, and 12:30am-2:30am Sunday and Monday mornings. Next update time Sun Sep 21 at 12:00 PM PDT. Last updated Mon Sep 15 at 12:08 PM PDT. (DBC-73974)
    Highway 101 Both Directions Highway 101, in both directions. Special event planned between Arbutus Ave and Alberni St for 4.0 km (Powell River). Starting Tue Sep 30 at 3:15 PM PDT until Tue Sep 30 at 4:30 PM PDT. Road closure planned. The National Day of Truth and Reconciliation walk. Next update time Tue Sep 30 at 4:30 PM PDT. Last updated Tue Sep 16 at 3:08 PM PDT. (DBC-81660)
    Highway 12 Both Directions Highway 12, in both directions. Construction work between 30 Mile Rd and Munson Rd (13 km south of Lillooet). Until Sat Oct 4. From 8:00 AM to 12:00 PM PDT and from 1:00 PM to 5:00 PM PDT on weekdays and Saturday. Road closed. Watch for traffic control. Big Slide Rockfall protection systems repair. Highway open 12PM-1PM to let vehicles through. Next update time Sat Oct 4 at 5:00 PM PDT. Last updated Sun Aug 31 at 2:26 PM PDT. (DBC-81064)
    Highway 13 Both Directions Highway 13, in both directions. Construction work between 28 Ave and 30A Ave for 0.5 km (Langley - District). Until Tue Sep 30. From 8:00 PM to 5:00 AM PDT and from 7:00 AM to 7:00 PM PDT on weekdays. Watch for traffic control. Singe lane alternating traffic during nighttime hours. Watch for crews during the day. Next update time Tue Sep 30. Last updated Mon Jul 28 at 9:19 AM PDT. (DBC-79798)
    Highway 16 Both Directions Highway 16 (Yellowhead Highway), in both directions. Construction work between 1st St and 3rd Ave E for 0.2 km (Prince Rupert). Until Sun Nov 30 at 5:30 PM PDT. Road closed. Detour in effect. Detour via: 3rd Ave E to 1st Ave E, 1st Ave W to 2nd St. Next update time Sun Nov 30 at 5:30 PM PDT. Last updated Tue May 27 at 4:01 PM PDT. (DBC-77182)
    Highway 20 Highway 20. There is a wildfire between Dusty Knob FSR and Nimpo Lake Rd S 25 km east of Anahim Lake. Road open to traffic. Evacuation alerts in effect. No stopping. Watch for wildfire crews. Next update time Mon Sep 22 at 11:00 AM PDT. Last updated Wed Sep 17 at 11:48 AM PDT. (DBC-81276)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Paving operations between Sunday Summit and Copper Mountain Rd for 34.2 km (Princeton). Until Sat Oct 4 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Width limit 5.00 m. Height limit 5.00 m. Project from Sunday Summit to Princeton. Expect delays up to 20 mins. Next update time Sat Oct 4 at 7:00 PM PDT. Last updated Sun Sep 7 at 6:06 AM PDT. (DBC-78739)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Vehicle incident between Taylor Way and Old Hedley Rd for 11.0 km (17 to 6 km west of Hedley). Road closed. Assessment in progress. Detour in effect. Emergency vehicles on scene. Detour Old Hedley Road. Next update time Wed Sep 17 at 7:00 PM PDT. Last updated Wed Sep 17 at 5:38 PM PDT. (DBC-81695)
    Highway 3A Both Directions Highway 3A, in both directions. Blasting between Kuskonook Rest Area and Bathie Rd for 0.3 km (4 km south of Kuskonook). Until Fri Oct 31. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Expect delays. Up to 20 min delays throughout the day, with scheduled 1 hour closures from 0930-1030 and from and from 1430-1530. Next update time Wed Oct 1 at 10:00 AM PDT. Last updated Wed Sep 3 at 7:05 AM PDT. (DBC-80874)
    Highway 4 Both Directions Highway 4, in both directions. Paving operations between Sutton Pass Summit and Taylor River Rest Area for 4.6 km (Sutton Pass Summit). Until Fri Oct 31. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. 24/7 alternating traffic may be implemented periodically. Next update time Fri Oct 31 at 5:00 PM PDT. Last updated Fri Sep 5 at 9:52 AM PDT. (DBC-81228)
    Highway 97 Highway 97 (Cariboo Connector). Vehicle incident between Lynes Creek Rd and Blue Lake Rd for 8.1 km (18 to 10 km north of Wildwood). There is a wildfire. Single lane alternating traffic. Possible delays of 20 minutes. Next update time Wed Sep 17 at 8:00 PM PDT. Last updated Wed Sep 17 at 6:36 PM PDT. (DBC-81710)
    Highway 99 Southbound Highway 99, southbound. Construction work at 80th St in Delta. Until Wed Nov 5. Exit ramp is closed. Use Exit 20 or Ladner Trunk Road. More info https://letstalk.Delta.Ca/Parkwood. Next update time Wed Nov 5. Last updated Wed Sep 17 at 12:21 PM PDT. (DBC-81701)
    Highway 99 Southbound Highway 99, southbound. Road construction work planned at Exit 32: Steveston Hwy (Richmond). Starting Wed Sep 17 at 10:00 PM PDT until Fri Sep 19 at 4:30 AM PDT. From 11:00 PM to 4:30 AM PDT on Wednesday and Thursday. Road closure planned. Detour planned. Next update time Fri Sep 19 at 5:00 AM PDT. Last updated Wed Sep 17 at 12:40 PM PDT. (DBC-81325)
    Other Roads Kersley-Dale Landing Rd. Landslide at 500 metres in from Highway 97 Intersection. Road closed. A temporary Single Lane Gravel Road for Local Traffic via Arnoldus Road. Next update time Tue Apr 14, 2026 at 9:00 AM PDT. Last updated Mon Apr 14 at 9:09 AM PDT. (DBC-23443)
    Other Roads Both Directions Durrell Road, in both directions. Landslide at 700m from Highway 97. Road closed. Detour in effect. Use Highway 97 and Dale Lake Road. Next update time Wed Oct 22 at 2:00 PM PDT. Last updated Sat Aug 2 at 11:04 PM PDT. (DBC-27390)
    Other Roads Both Directions Quesnel-Hixon Road, in both directions. Landslide at Cottonwood bridge. Road closed. Next update time Fri Apr 17, 2026 at 2:00 PM PDT. Last updated Thu Apr 17 at 3:40 PM PDT. (DBC-28386)
    Other Roads Johnston Bridge. Travel advisory in effect at Front St. In Quesnel. Johnston Bridge. Bridge is open to vehicles with gross vehicle weight rating of 10,000 kilograms or lower. Industrial traffic and heavy commercial traffic must detour via Plywood Rd and Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision. Next update time Wed Apr 8, 2026 at 9:00 AM PDT. Last updated Thu Oct 17 at 6:39 AM PDT. (DBC-47311)
    Other Roads Both Directions McKay Road, in both directions. Flooding at McKay Road. Road closed. Next update time Thu Apr 9, 2026 at 9:00 AM PDT. Last updated Thu Apr 10 at 9:28 AM PDT. (DBC-53013)
    Other Roads Both Directions Cave Road, in both directions. Landslide at Cave Road. Road closed. Landslide on Cave Road. Next update time Wed Apr 8, 2026 at 10:00 AM PDT. Last updated Wed Apr 9 at 10:42 PM PDT. (DBC-67913)
    Other Roads Both Directions Blackburn Road, in both directions. Washout between Sunrise Place and Fulford-Ganges Road near Salt Spring Island. Road closed. Detour in effect. Detour via Cranberry Road. Next update time Wed Sep 2, 2026 at 12:00 PM PDT. Last updated Tue Sep 2 at 4:21 PM PDT. (DBC-77329)
    Other Roads Northbound Tamany Dr, northbound. Construction work at Keating Cross Rd in Saanich. Until Fri Oct 31. Road closed. Watch for traffic control. Tamany Rd will be closed at Keating Cross Rd as part of the Highway 17 Keating Cross Flyover Project. Next update time Thu Oct 30 at 9:00 AM PDT. Last updated Fri Jul 25 at 9:25 PM PDT. (DBC-79749)
    Other Roads Both Directions Bamfield Rd, in both directions. Travel advisory in effect between Bamfield and Port Alberni. Road closed. Alternative route has been established from Youbou-Lake Cowichan to Bamfield. For more information, visit the Alberni-Clayoquot Regional District website. Next update time Fri Oct 31 at 12:00 PM PDT. Last updated Wed Sep 17 at 12:18 PM PDT. (DBC-80346)
    Other Roads Both Directions Renfrew Rd, in both directions. Road maintenance work between Timber Ridge Rd and W Shawnigan Lake Rd. Until Mon Dec 1. From 7:00 AM to 5:00 PM PDT on weekdays. Culvert work will be taking place in Shawnigan Lake. Watch for crews and equipment on the side of the road. Next update time Fri Nov 28 at 9:00 AM PDT. Last updated Tue Aug 26 at 3:23 PM PDT. (DBC-80899)
    Other Roads Both Directions Texas Creek Rd, in both directions. Washout at Intlpam Creek Rd. Road closed. Geotechnical investigation. Next update time Mon Sep 22 at 3:00 PM PDT. Last updated Mon Sep 15 at 5:02 PM PDT. (DBC-81323)
    Barnston Island Ferry Both Directions Barnston Island Ferry, in both directions. Possible ferry delays at Barnston Island Ferry (Surrey). Until Fri Sep 26 at 4:00 PM PDT. Ferry may carry reduced loads during periods of low water. Max 13,000kg or up to 4 cars. Last updated Fri Sep 12 at 8:31 AM PDT. (DBC-80223)
    Barnston Island Ferry Both Directions Barnston Island Ferry, in both directions. Travel advisory in effect between Barnston Island Ferry and the end of Barnston Island Ferry (1 km east of Surrey). Until Fri Sep 26 at 4:00 PM PDT. Required maintenance. Due to replacement vessel with reduced capacity. The replacement barge will have a reduced vehicle weight carrying capacity of 28,000kgs. Last updated Fri Sep 12 at 8:31 AM PDT. (DBC-80867)
    Blackwater Rd Both Directions Blackwater Rd, in both directions. Bridge maintenance between Batnuni Rd and Alexander MacKenzie Heritage Trail for 5.7 km (71 to 66 km south of Prince George). Until Fri Sep 26 at 5:00 PM PDT. From 8:00 AM to 5:00 PM PDT on weekdays. Expect delays. Expect up to one hour delays. Next update time Fri Sep 26 at 5:00 PM PDT. Last updated Fri Sep 12 at 3:13 PM PDT. (DBC-81515)
    Cecil Lake Rd Both Directions Cecil Lake Rd (Highway 103), in both directions. Maintenance between 263 Rd and 251 Rd for 0.6 km (16 km west of Cecil Lake). Until Sat Sep 20 at 5:00 PM MST. From 7:00 AM to 5:00 PM MST on weekdays and Saturday. Single lane alternating traffic. Please slow down when passing crews, equipment and going through construction zone. Last updated Sat Sep 13 at 10:19 AM MST. (DBC-79739)
    Highway 1 Highway 1. Utility work between Sackum and Venables Valley road. Until Tue Sep 30. From 7:00 AM to 6:00 PM PDT on weekdays. Single lane alternating traffic. Please watch for traffic control personnel and crews working. Expect minor delays of up to five minutes. Last updated Mon Aug 11 at 10:07 AM PDT. (DBC-80309)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Utility work between Roderick St and Culduthel Rd for 0.6 km (Saanich). Until Tue Sep 30 at 5:00 AM PDT. Right lane closed. Left lane is closed. Expect minor delays. Watch for traffic control. Last updated Wed Feb 19 at 11:59 AM PDT. (DBC-72994)
    Highway 1 Highway 1 (TransCanada Highway). Road construction work between Carey Rd and Galloping Goose Trail (Saanich). Watch for traffic control. Traffic pattern change and night closures on Carey. Plan your route accordingly and expect traffic delays. Construction zone in effect 24/7. Last updated Fri Aug 1 at 1:49 PM PDT. (DBC-79782)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Tillicum Rd and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Wed Dec 24, 2025. From 8:00 PM to 5:30 AM PST on weekdays and Sunday. Lane closures in both directions in effect. Traffic reduced to single lane both directions. Maximum width 4m. No maximum height change. Speed limit 50km/h. Last updated Fri Dec 20 at 9:03 AM PST. (DBC-71006)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Exit 6: McKenzie Ave and Exit 8: Helmcken Rd (View Royal). Until Fri Sep 19 at 5:30 AM PDT. Lane closures in both directions in effect. Nightly lane closures Mon-Fri September 15-19th. Last updated Mon Sep 15 at 6:08 AM PDT. (DBC-81326)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Utility work planned between Burnside Rd W and Old Island Hwy for 4.2 km (View Royal to Saanich). Starting Tue Sep 23 at 10:00 PM PDT until Wed Sep 24 at 6:00 AM PDT. Last updated Tue Sep 16 at 4:21 PM PDT. (DBC-81664)
    Highway 1 Highway 1 (TransCanada Highway). Road construction work between Exit 6: McKenzie Ave and Exit 10: Burnside Rd W for 3.8 km (View Royal to Saanich). Construction work at Colwood Interchange, Helmcken Interchange, and McKenzie Interchange until Fall 2027. Expect speed changes, traffic pattern changes, and overnight work. Next update time Tue Dec 16 at 10:00 AM PDT. Last updated Tue Sep 16 at 10:25 AM PDT. (DBC-73856)
    Highway 1 Southbound Highway 1 (Malahat Highway), southbound. Utility work planned between Mill Bay Rd and Whittaker Rd (2 km north of Malahat Summit). Starting Thu Sep 25 at 10:00 PM PDT until Fri Sep 26 at 5:30 AM PDT. Right lane will be blocked. Replacing electrical service panel. Work is between Mill Bay Ferry Road and Trowsee Road. Last updated Tue Sep 16 at 1:33 PM PDT. (DBC-81658)
    Highway 1 Highway 1 (Malahat Highway). Utility work planned between Whittaker Rd and Mill Bay Rd (2 km north of Malahat Summit). Starting Wed Sep 24 at 10:00 PM PDT until Thu Sep 25 at 5:30 AM PDT. Right lane will be blocked. Replacing electrical service panel between Trowsee Road and Malahat Summit. Last updated Tue Sep 16 at 1:27 PM PDT. (DBC-81657)
    Highway 1 Highway 1 (TransCanada Highway). Utility work at Drinkwater Rd (1 km north of Duncan). Until Fri Oct 10. In effect 24/7. No lanes affected. Watch for signage in area. Last updated Fri Sep 12 at 9:39 AM PDT. (DBC-81493)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Shoulder maintenance between Mt Sicker Rd and Radford Rd for 8.0 km (Chemainus). Until Fri Sep 19. From 9:00 AM to 3:00 PM PDT on Wednesday, Thursday and Friday. Right lane is closed in both directions. Watch for traffic control. Last updated Tue Sep 16 at 8:10 AM PDT. (DBC-81635)
    Highway 1 Northbound Highway 1 (TransCanada Highway), northbound. Utility work between Brenton-Page Rd and Cedar Rd for 0.7 km (4 to 5 km north of Ladysmith). Until Fri Sep 26 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Utility work - watch for speed reduction and work crews. Last updated Wed Sep 3 at 2:43 PM PDT. (DBC-81173)
    Highway 1 Northbound Highway 1 (TransCanada Highway), northbound. Construction work between Crace St and Nicol St for 0.1 km (Nanaimo). Until Tue Sep 30 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Last updated Mon Jun 30 at 8:19 AM PDT. (DBC-77623)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Paving operations planned at Exit 10: 21st St (West Vancouver). Starting Wed Sep 17 at 8:00 PM PDT until Thu Sep 18 at 5:00 AM PDT. 21st St. Off ramp closed for paving with detours to 15th St. Paving northbound on 21st St. Between Queens and Westhill Drive. Last updated Wed Sep 17 at 6:54 AM PDT. (DBC-81678)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Paving operations planned at Exit 10: 21st St (West Vancouver). Starting Thu Sep 18 at 8:00 PM PDT until Fri Sep 19 at 5:00 AM PDT. Eastbound 21st St. On ramp closed with detours to 15th St. Paving northbound on 21st St. Between Queens and Westhill Dr. Last updated Wed Sep 17 at 6:57 AM PDT. (DBC-81680)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Electrical maintenance between Exit 14: Capilano Rd and Exit 13 for 1.5 km (North Vancouver - District to West Vancouver). Until Fri Sep 26. From 9:00 PM to 6:00 AM PDT daily. Right turn lane closed. Right lane closed. Last updated Wed Sep 10 at 5:09 PM PDT. (DBC-81002)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Exit 19: Lynn Valley Rd and Exit 21: Mountain Hwy for 0.5 km (North Vancouver - City). Until Wed Nov 5. From 7:00 AM to 8:00 PM PDT daily. Work on shoulders. Watch for traffic control. Last updated Wed Aug 6 at 2:53 PM PDT. (DBC-80161)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Paving operations at Exit 33: Kensington Ave (Burnaby). Until Fri Oct 31. From 8:00 PM to 5:00 AM PDT on weekdays and Sunday. Exit ramp is closed. Last updated Tue Sep 9 at 6:49 AM PDT. (DBC-81340)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Construction work between 216th St and Exit 66: 232nd St for 3.8 km (Langley - District). Until Tue Sep 30. Watch for traffic control. Watch for intermittent lane closures. Last updated Wed Jun 4 at 2:35 PM PDT. (DBC-77541)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Construction work between Bradner Rd and 248 St for 5.3 km (Abbotsford to Langley - District). Until Tue Mar 31, 2026. Watch for traffic control. Traffic pattern change. Watch for signage. Last updated Wed Aug 20 at 3:22 PM PDT. (DBC-80694)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Construction work at Exit 73 (Langley - District). Until Wed Dec 31. Exit ramp is closed. Current off-ramp will be closed, new off-ramp will be opened before the overpass. Turn left or right to 56th south from off-ramp. Last updated Thu Jun 19 at 8:12 PM PDT. (DBC-78296)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Tue Sep 30 at 12:00 PM PDT. Last updated Mon Jul 28 at 11:06 AM PDT. (DBC-66582)
    Highway 1 Southbound Highway 1 (TransCanada Highway), southbound. Utility work planned between Anderson River Mainline and Toll Rd for 11.4 km (7 to 19 km north of Yale). Starting Mon Sep 22 at 7:00 AM PDT until Tue Sep 23 at 7:00 PM PDT. Last updated Wed Sep 10 at 2:08 PM PDT. (DBC-81420)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Line painting planned at Vicars Rd (Kamloops). Starting Wed Sep 24 at 9:00 PM PDT until Thu Sep 25 at 5:00 AM PDT. Left turn lane will be closed. Last updated Mon Sep 15 at 8:42 AM PDT. (DBC-81584)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Geotechnical investigation planned between 3 St SW and Shuswap St for 0.2 km (Salmon Arm). Starting Sun Oct 19 at 7:00 AM PDT until Mon Oct 20 at 5:00 PM PDT. Lane Closure. Centre lane will be closed. Last updated Wed Sep 3 at 11:48 AM PDT. (DBC-81160)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Paving operations planned between Silver Sands Rd and Solsqua-Sicamous Rd (Sicamous). Starting Tue Sep 23 at 4:30 AM PDT until Tue Sep 23 at 12:00 PM PDT. Paving operations planned. Lane Closure. Watch for traffic control personnel. Paving HWY 1 Westbound turn lane & Eastbound travel lane. Last updated Tue Sep 9 at 10:55 AM PDT. (DBC-81357)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Bridge maintenance between Crazy Ck. Bridge and 19 mile Rd for 8.0 km (30 km east of Sicamous to 27 km west of Revelstoke). Until Thu Sep 18. From 8:00 AM to 5:00 PM PDT on Tuesday, Wednesday and Thursday. Single lane alternating traffic. Bridge Deck Condition Assessments. Last updated Tue Sep 9 at 12:41 PM PDT. (DBC-81355)
    Highway 1 Highway 1 (TransCanada Highway). Rock scaling between Three Valley Avalanche Gate and Three Valley Frtg Rd for 2.1 km (16 to 18 km west of Revelstoke). Until Wed Sep 17. From 8:00 AM to 4:00 PM PDT on Tuesday and Wednesday. Expect delays up to 20 minutes. Last updated Mon Sep 15 at 10:03 AM PDT. (DBC-81575)
    Highway 1 Highway 1 (TransCanada Highway). Traffic signal outage planned between Highway 23 North and Glacier National Park East Boundary for 86.2 km (Revelstoke to 5 km west of East Boundary of Glacier National Park). Starting Thu Sep 18 at 8:00 AM PDT until Thu Sep 18 at 4:00 PM PDT. Utility work planned. BC Hydro planned outage. Last updated Mon Sep 15 at 11:57 AM PDT. (DBC-81600)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Bridge construction at Meadows in the Sky Pkwy (Revelstoke). Until Fri Oct 31. Watch for traffic control. Lane Closure. Expect speed reductions to 50km/hr. Lane width restricted to 4m. No work on long weekends. Last updated Thu Jun 12 at 1:18 PM PDT. (DBC-76584)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work between Hemlock Grove Boardwalk and Illecillewaet Campground for 0.6 km (8 to 9 km east of West Boundary of Glacier National Park). Until Fri Oct 31. From 7:00 AM to 7:00 PM PDT daily. Culvert replacement work. Speed limit 50km/h at all times due to narrowing/realignment requirements. Last updated Fri Jul 11 at 4:20 PM PDT. (DBC-79076)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Construction work planned at Illecillewaet Campground (4 km west of Rogers Pass Summit). Starting Tue Sep 23 at 10:30 AM PDT until Tue Sep 23 at 5:00 PM PDT. Left lane will be closed. Watch for traffic control personnel. Last updated Fri Sep 12 at 12:46 PM PDT. (DBC-81509)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Pavement patching underway between Glacier National Park East Boundary and Quartz Creek Bridge (Structure) for 13.5 km (East Boundary of Glacier National Park). Until Thu Sep 18. From 7:00 AM to 4:00 PM PDT on Tuesday, Wednesday and Thursday. Single lane alternating traffic. Last updated Mon Sep 15 at 11:14 AM PDT. (DBC-81598)
    Highway 1 Highway 1 (TransCanada Highway). Rest area closed at Redgrave (14 km east of East Boundary of Glacier National Park). Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses. Next update time Mon Dec 1. Last updated Mon Jul 21 at 12:51 PM MDT. (DBC-73964)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work between Redgrave and Wiseman Rd for 6.0 km (15 to 21 km east of East Boundary of Glacier National Park). Until Sat Nov 15. Watch for traffic control. Expect minor delays. Construction zone reduced speed limit in effect. Lane widths are 5 metres each direction. Watch for crews and expect delays. Next update time Sat Nov 15 at 10:00 AM MDT. Last updated Fri Aug 22 at 10:02 AM MDT. (DBC-75437)
    Highway 1 Highway 1 (Kicking Horse Pass). Maintenance between Golden Donald Upper Rd and Yoho Bridge for 7.8 km (Golden). Until Fri Sep 19. From 7:30 AM to 5:30 PM MDT on Wednesday, Thursday and Friday. Watch for traffic control. Reduce speed. East bound lane shift from right lane to left lane. Last updated Mon Sep 15 at 1:19 PM MDT. (DBC-81603)
    Highway 1 Highway 1 (Kicking Horse Pass). Ditching between Golden Donald Upper Rd and Glenogle Rd for 15.0 km (Golden to 9 km west of West Boundary of Yoho National Park). Until Thu Sep 25 at 4:00 PM MDT. From 7:30 AM to 4:00 PM MDT on Monday, Tuesday, Wednesday and Thursday. Eastbound lane closure. Right lane closed. Last updated Tue Sep 16 at 12:35 PM MDT. (DBC-81650)
    Highway 10 Westbound Highway 10, westbound. Maintenance between 184 St and 180 St for 0.8 km (Surrey). Until Sat Sep 20 at 3:00 PM PDT. Right lane is blocked. Removing tree that is impeding sidewalk and overhead sign board. Last updated Mon Sep 15 at 10:08 AM PDT. (DBC-81594)
    Highway 10 Westbound Highway 10, westbound. Tree pruning planned between 232 St and Glover Rd for 2.4 km (Langley - District). Starting Mon Sep 22 at 9:00 AM PDT until Fri Sep 26 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. Two way traffic will be maintained. Last updated Mon Sep 15 at 7:45 PM PDT. (DBC-81618)
    Highway 101 Highway 101. Utility work between Largo Rd and Crowe Rd for 1.8 km (6 to 4 km east of Sechelt). Until Fri Sep 19 at 5:00 PM PDT. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Last updated Thu Sep 4 at 8:00 PM PDT. (DBC-81216)
    Highway 11 Southbound Highway 11, southbound. Utility work between Delair Rd and Barrons Way for 1.1 km (Abbotsford). Until Tue Sep 23 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on weekdays. Right lane is blocked. Right turn lane closed. Centre lane blocked. Watch for traffic control. Last updated Mon Aug 25 at 4:09 PM PDT. (DBC-80866)
    Highway 11 Northbound Highway 11, northbound. Utility work planned at McCallum Rd (Abbotsford). Starting Tue Sep 23 until Tue Sep 30. From 8:00 AM to 3:00 PM PDT daily. Right lane will be closed. Last updated Thu Jul 17 at 2:22 PM PDT. (DBC-79388)
    Highway 11 Northbound Highway 11, northbound. Utility work planned at Valley Rd (Abbotsford). Starting Thu Sep 18 until Sun Oct 5. From 9:00 PM to 5:00 AM PDT daily. Right lane will be closed. Speed reduction in place. Last updated Wed Sep 17 at 12:28 PM PDT. (DBC-81702)
    Highway 13 Both Directions Highway 13, in both directions. Construction work between 48 Ave and 56 Ave for 1.6 km (Langley - District). Until Tue Sep 30. From 7:00 AM to 7:00 PM PDT daily. Lane Closure. Watch for traffic control. Lane shift in place. Speed reduction to 40km/h. Last updated Mon Jul 28 at 9:11 AM PDT. (DBC-79797)
    Highway 13 Both Directions Highway 13, in both directions. Utility work planned between 48 Ave and 56 Ave for 1.6 km (Langley - District). Starting Wed Oct 1 at 7:00 AM PDT until Sun Nov 30 at 7:00 PM PDT. Watch for traffic control personnel. Speed reduction to 40 km/h. Last updated Mon Sep 15 at 7:19 PM PDT. (DBC-81617)
    Highway 13 Both Directions Highway 13, in both directions. Construction work planned between 48 Ave and 56 Ave for 1.1 km (Langley - District). Starting Wed Oct 1 at 9:00 PM PDT until Sun Nov 30 at 5:30 AM PDT. Lane closures in both directions planned. Watch for traffic control personnel. Last updated Mon Sep 15 at 7:55 PM PDT. (DBC-81620)
    Highway 14 Highway 14. Road maintenance work between Old Switchback Road and Cormorant Way for 23.6 km (1 km west of Jordan River to 13 km east of Port Renfrew). Until Fri Sep 19 at 6:00 PM PDT. From 7:00 AM to 6:00 PM PDT on weekdays. Single lane alternating traffic. Last updated Fri Aug 22 at 1:36 PM PDT. (DBC-80780)
    Highway 14 Both Directions Highway 14, in both directions. Utility work between Church Rd and Phillips Rd for 1.1 km (Sooke). Until Wed Dec 31 at 12:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Mon May 5 at 7:43 AM PDT. (DBC-75277)
    Highway 14 Eastbound Highway 14, eastbound. Utility work between Phillips Rd and Ludlow Rd for 3.4 km (Sooke). Until Fri Oct 10 at 5:00 AM PDT. Right lane is blocked. Fibre placement on the pole relocation for BC Hydro. Last updated Mon Sep 8 at 9:36 AM PDT. (DBC-81298)
    Highway 15 Northbound Highway 15 (Pacific Highway), northbound. Utility work planned between 12 Ave and 18 Ave for 1.2 km (Surrey). Starting Fri Oct 3 at 8:00 AM PDT until Fri Oct 3 at 4:00 PM PDT. Right lane will be blocked. Last updated Mon Sep 15 at 9:53 AM PDT. (DBC-81589)
    Highway 15 Northbound Highway 15 (Pacific Highway), northbound. Utility work planned between 68A Ave and Fraser Hwy for 1.1 km (Surrey). Starting Fri Sep 19 at 6:00 AM PDT until Wed Oct 15 at 6:00 PM PDT. Construction work planned. Watch for traffic control personnel. Right lane will be blocked. Last updated Mon Sep 15 at 8:18 PM PDT. (DBC-81624)
    Highway 15 Highway 15 (Pacific Highway). Construction work at Fraser Hwy (Surrey). Until Sat Dec 20 at 10:00 PM PDT. Right turn lane closed. Shoulder closed. Last updated Mon Sep 15 at 8:44 AM PDT. (DBC-81585)
    Highway 16 Both Directions Highway 16 (on Haida Gwaii), in both directions. Ditching between Masset Cemetery Rd and E Cedar Ave for 42.2 km (Port Clements to Masset). Until Fri Sep 19. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Last updated Mon Sep 15 at 12:26 PM PDT. (DBC-81605)
    Highway 16 Both Directions Highway 16 (on Haida Gwaii), in both directions. Bridge maintenance between E Cedar Ave and Beitush Rd for 6.3 km (7 km west of Tlell to 5 km east of Port Clements). Bridge construction. Bridge repairs in effect at Woodpile Bridge. Speed reduction, reduce speed. Next update time Wed Sep 17 at 10:30 PM PDT. Last updated Mon Sep 15 at 12:18 PM PDT. (DBC-74895)
    Highway 16 Both Directions Highway 16 (on Haida Gwaii), in both directions. Maintenance planned at Brandt Rd (3 km east of Tlell). Starting Mon Sep 22 until Fri Sep 26. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Ocean erosion control, watch for crews, obey traffic signs. Last updated Mon Sep 15 at 12:29 PM PDT. (DBC-81606)
    Highway 16 Both Directions Highway 16 (on Haida Gwaii), in both directions. Road maintenance work between Lawnhill Rd and Miller Rd for 9.3 km (13 to 4 km west of Skidegate). Watch for traffic control. Culvert work, reduce speed, watch for crews, obey traffic signs. Next update time Wed Sep 17 at 10:30 PM PDT. Last updated Mon Sep 15 at 12:20 PM PDT. (DBC-80321)
    Highway 16 Both Directions Highway 16 (Yellowhead Highway), in both directions. Construction work between Port Edward Turnoff and Rainbow Avalanche Gates (16 km east of Prince Rupert). Until Thu Oct 9. From 6:00 AM to 6:00 PM PDT daily. Industrial traffic may slow or block regular traffic. Watch for traffic control. Speed reduction in place during work hours. Last updated Thu Aug 21 at 10:59 AM PDT. (DBC-80731)
    Highway 16 Both Directions Highway 16 (Yellowhead Highway), in both directions. Bridge maintenance between Rainbow Chain Up and Maintenance Boundary SA27 for 33.5 km (63 to 29 km east of Prince Rupert). Until Fri Sep 26. From 8:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Multipule bridges, Bridge maintenance. Obey traffic signs. Last updated Mon Sep 15 at 11:31 AM PDT. (DBC-81599)
    Highway 16 Highway 16 (Yellowhead Highway). Special event planned between 11th Ave E and Maintenance Boundary SA27 for 66.3 km (Prince Rupert). Starting Thu Sep 18 until Fri Sep 19. Watch for traffic control personnel. Cops for Cancer Tour de North. Last updated Tue Sep 16 at 10:26 AM PDT. (DBC-81644)
    Highway 16 Highway 16 (Yellowhead Highway). Special event planned between Maintenance Boundary SA27 and Maintenance Boundary SA26 for 126.9 km (24 km west of Cedarvale to 63 km east of Prince Rupert). Starting Thu Sep 18 until Fri Sep 19. Watch for traffic control personnel. Cops for Cancer Tour de North. Last updated Tue Sep 16 at 10:24 AM PDT. (DBC-81643)
    Highway 16 Westbound Highway 16 (Yellowhead Highway), westbound. Utility work between Savory Pit Rd and SA24/23 Maintenance Boundary for 14.1 km (6 km west of Endako to Priestly Hill). Until Tue Oct 7. From 8:00 AM to 4:00 PM PDT daily. Shoulder closed. Last updated Thu Sep 11 at 3:37 PM PDT. (DBC-81473)
    Highway 16 Both Directions Highway 16 (Yellowhead Highway), in both directions. Paving operations between Fraser Mountain Rd and Engen Townsite Rd for 22.7 km (3 km west of Fort Fraser to 14 km west of Vanderhoof). Until Sun Sep 28. From 7:00 AM to 7:00 PM PDT daily. Shoulder maintenance and milling planned. Watch for traffic control personnel. Expect delays. Last updated Fri Jul 18 at 4:55 PM PDT. (DBC-79459)
    Highway 16 Both Directions Highway 16 (Yellowhead Highway), in both directions. Bridge maintenance between Westlund Rd and Dore Overhead Bridge for 1.3 km (2 to 3 km west of McBride). Until Sat Oct 11. Single lane alternating traffic. Watch for traffic control. Last updated Fri Sep 12 at 5:58 PM PDT. (DBC-81525)
    Highway 16 Both Directions Highway 16 (Yellowhead Highway), in both directions. Road maintenance work between Horsey Creek Rd and Small Creek Bridge for 4.7 km (15 to 20 km west of Tete Jaune). Until Thu Oct 30 at 6:00 PM PDT. Lane Closure. Single lane alternating traffic. Watch for traffic control. Maximum overall width is 5m. Loads over 5m must contact rbuckham@outlook.Com with a minimum of 48-hours to see if they can be accommodated. Last updated Wed Aug 27 at 10:07 PM PDT. (DBC-79051)
    Highway 17 Southbound Highway 17, southbound. Road maintenance work between Saanich Rd and Tolmie Ave for 0.8 km (Saanich to 1 km north of Victoria). Until Tue Sep 30. From 8:00 AM to 4:00 PM PDT daily. Right lane closed. Watch for traffic control. Last updated Mon Aug 18 at 9:45 AM PDT. (DBC-80589)
    Highway 17 Highway 17. Road construction work at Ravine Way (Saanich). Watch for traffic control. Traffic pattern change and night closures on Ravine Way. Plan your route accordingly and expect traffic delays. Construction zone in effect 24/7. Last updated Fri Aug 1 at 1:47 PM PDT. (DBC-79781)
    Highway 17 Highway 17. Construction work between Exit 13 and 72 St for 3.0 km (Delta). Until Tue Sep 23. From 7:00 AM to 5:00 PM PDT daily. Last updated Mon Sep 15 at 11:07 AM PDT. (DBC-81596)
    Highway 19 Highway 19 (Island Highway). Utility work planned between SW Main Rd and E Main Rd for 2.7 km (3 to 6 km south of Port McNeill). Starting Tue Sep 23 at 8:00 AM PDT until Wed Sep 24 at 4:00 PM PDT. Watch for traffic control personnel. Single lane alternating traffic will be in effect. Last updated Wed Sep 17 at 11:30 AM PDT. (DBC-81700)
    Highway 19 Both Directions Highway 19 (Island Highway), in both directions. Road construction work between Sayward Timber and Barge Terminal Rd for 5.4 km (Campbell River). Until Fri Sep 26 at 11:45 PM PDT. Minor congestion. Please expect a speed reduction on Hwy 19 to access the detour road for Race Point Road The speed will be reduced to 60KM/H 24 hours a day 7 days a week. Last updated Fri Aug 15 at 12:15 PM PDT. (DBC-80514)
    Highway 19 Northbound Highway 19 (Inland Island Highway), northbound. Paving operations between Dove Creek Rd and Jubilee Pky for 30.4 km (10 km north of Cumberland to Campbell River). Until Fri Sep 19. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Northbound lane closure. Watch for traffic control. One lane each direction via southbound lanes. Last updated Tue Aug 19 at 9:50 AM PDT. (DBC-80638)
    Highway 19 Northbound Highway 19 (Inland Island Highway), northbound. Construction work between Hamm Rd and Duncan Bay Main for 3.8 km (12 to 8 km south of Campbell River). Until Tue Sep 30 at 5:00 PM PDT. Watch for traffic control. Shoulder closed. Last updated Wed Aug 13 at 9:26 AM PDT. (DBC-80419)
    Highway 19 Both Directions Highway 19 (Inland Island Highway), in both directions. Electrical maintenance planned at Piercy Rd (6 km north of Cumberland). Starting Wed Sep 17 at 8:00 PM PDT until Wed Sep 17 at 11:30 PM PDT. Lane closures in both directions planned. Watch for traffic control personnel. Speed Reduction will be in place. Last updated Wed Sep 17 at 2:17 PM PDT. (DBC-81707)
    Highway 19 Both Directions Highway 19 (Inland Island Highway), in both directions. Bridge maintenance between Cook Creek Rd and Parksville Exit (Highway 19A) for 35.4 km (28 km south of Cumberland to Parksville). Until Wed Sep 17. From 8:00 PM to 4:00 PM PDT daily. Right lane closed. Watch for traffic control. Last updated Thu Sep 4 at 2:40 PM PDT. (DBC-81206)
    Highway 19 Southbound Highway 19 (Inland Island Highway), southbound. Utility work planned between Summerset Rd and Hillview Rd for 2.8 km (7 km south of Parksville to 8 km north of Nanaimo). Starting Mon Sep 22 at 9:00 AM PDT until Mon Sep 22 at 3:00 PM PDT. Last updated Tue Sep 16 at 11:58 AM PDT. (DBC-81652)
    Highway 19A Both Directions Highway 19A (Island Highway), in both directions. Electrical maintenance planned at Cliffe Ave (Courtenay). Starting Thu Sep 18 until Thu Sep 18 at 4:00 AM PDT. Lane closures in both directions planned. Watch for traffic control personnel. Speed Reduction will be in place. Last updated Wed Sep 17 at 2:20 PM PDT. (DBC-81708)
    Highway 19A Highway 19A (Island Highway). Ditching between Comox Rd and Ryan Rd for 1.5 km (Courtenay). Lane Closure. Watch for traffic control. Right lane closed. Last updated Tue Jul 29 at 11:25 AM PDT. (DBC-79859)
    Highway 19A Both Directions Highway 19A (Island Highway), in both directions. Utility work planned between Hamm Rd and Catherwood Rd for 1.7 km (14 to 12 km south of Campbell River). Starting Mon Sep 22 at 9:00 AM PDT until Fri Sep 26 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Wed Sep 10 at 10:39 AM PDT. (DBC-81409)
    Highway 19A Both Directions Highway 19A (Island Highway), in both directions. Utility work between Iron River Rd and Colorado Dr for 6.8 km (Campbell River). Until Fri Oct 3 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. When work on shoulder is not available expect Single Lane Alternating Traffic on 19A 9am to 3pm. Last updated Wed Sep 17 at 11:41 AM PDT. (DBC-80147)
    Highway 19A Highway 19A (Island Highway). Construction work between Henry Rd and Heard Rd for 2.8 km (4 to 1 km south of Campbell River). Until Fri Jan 30, 2026 at 7:00 PM PDT. Multiple locations. Work at each location done within 3 hrs. Last updated Tue Apr 8 at 2:45 PM PDT. (DBC-75100)
    Highway 19A Highway 19A (Island Highway). Utility work planned between Maple St and Petersen Rd for 0.2 km (Campbell River). Starting Mon Oct 6 at 8:00 AM PDT until Wed Oct 8 at 4:00 PM PDT. Watch for traffic control personnel. Shoulder will be closed. Last updated Tue Sep 16 at 11:15 AM PDT. (DBC-81649)
    Highway 1A Highway 1A. Construction work at Pattullo Bridge (New Westminster). Activities related to Pattullo Bridge replacement project. Watch for crews. Road closures to be posted as they are confirmed. Visit https://www.Pattullobridgereplacement.Ca/ or call the 24/7 hotline at 1-844-815-6149 for more info. Next update time Wed Oct 1 at 12:00 PM PDT. Last updated Thu Aug 7 at 8:31 AM PDT. (DBC-80168)
    Highway 2 Highway 2. Construction work between 17 St and the end of Highway 2 (Dawson Creek). Until Fri Sep 19 at 5:00 PM MST. Watch for traffic control. Lane closures in both directions in effect. Island repairs to take place. Slow down and watch for traffic control. Last updated Thu Sep 11 at 7:40 AM MST. (DBC-81446)
    Highway 20 Highway 20. Limited visibility with smoke between the start of Highway 20 and Stack Valley Rd for 407.4 km (Bella Coola to 44 km west of Williams Lake). Last updated Wed Sep 17 at 2:54 PM PDT. (DBCRCON-223550)
    Highway 20 Both Directions Highway 20, in both directions. There is a wildfire between Rainbow Range Trailhead and Elsey Rd for 9.7 km (6 to 15 km west of Anahim Lake). Single lane alternating traffic. Expect minor delays. Watch for crews and equipment working. Last updated Wed Sep 17 at 3:04 PM PDT. (DBC-81551)
    Highway 20 Highway 20. Utility work between Thompson Rd and Lyle Rd for 1.6 km (19 to 18 km east of Anahim Lake). Until Tue Sep 30. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Please watch for traffic control personnel. Expect minor delays of up to five minutes. Last updated Thu Sep 4 at 8:26 AM PDT. (DBC-80852)
    Highway 20 Both Directions Highway 20, in both directions. Watch for livestock between Elsey Rd and Chipman Rd for 143.1 km (39 km east of Tatla Lake to 6 km west of Anahim Lake). Last updated Wed Sep 17 at 3:04 PM PDT. (DBC-78509)
    Highway 22A Highway 22A. Bridge maintenance planned between US Border and Beaver Creek Park Rd (1 km north of BC and WA Border, South of Trail). Starting Mon Sep 29 until Wed Oct 1. From 3:00 PM to 11:45 PM PDT on Monday, Tuesday and Wednesday. Road will be closed intermittently. Closures last 20 minutes at a time. Last updated Tue Sep 16 at 8:59 AM PDT. (DBC-81639)
    Highway 23 Southbound Highway 23, southbound. Utility work between Clough Rd and Blanket Creek Provincial Pk for 16.4 km (22 to 6 km south of Revelstoke). Until Mon Oct 20 at 4:00 PM PDT. Right lane is blocked. Last updated Mon Sep 8 at 6:35 AM PDT. (DBC-81287)
    Highway 23 Both Directions Highway 23, in both directions. Electrical maintenance planned between 5 Mile Boat Launch and St. Cyr Bridge for 5.1 km (1 to 6 km north of Revelstoke). Starting Mon Sep 29 until Fri Oct 3. From 8:00 AM to 4:00 PM PDT on weekdays. Road will be closed intermittently. Last updated Fri Aug 29 at 3:33 PM PDT. (DBC-81033)
    Highway 23 Northbound Highway 23, northbound. Utility work at 5 Mile Boat Launch (1 km north of Revelstoke). Until Sat Sep 20 at 4:00 PM PDT. Right lane is blocked. Work is between Revelstoke Hydroelectric Dam and Five Mile boat Launch Rec Site. Last updated Mon Sep 8 at 6:57 AM PDT. (DBC-81290)
    Highway 23 Southbound Highway 23, southbound. Electrical maintenance between Mica Dam Avalanche Gates and Canoe St - Mica Village (1 km south of Mica Dam). Until Thu Sep 18 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on Wednesday and Thursday. Shoulder closed. Last updated Sat Aug 30 at 5:55 PM PDT. (DBC-81058)
    Highway 24 Highway 24. Fog patches between the start of Highway 24 and Watch Lake Rd for 11.1 km (Lone Butte). Last updated Wed Sep 17 at 2:45 PM PDT. (DBCRCON-223558)
    Highway 26 Highway 26. Limited visibility with smoke between the start of Highway 26 and Norton Creek Rd for 25.0 km (Quesnel). Last updated Wed Sep 17 at 4:25 PM PDT. (DBCRCON-223567)
    Highway 26 Highway 26. Utility work between Aird Rd and Quesnel Canyon Rd for 0.8 km (2 km east of Quesnel). Until Sat Sep 20. From 5:00 AM to 6:00 PM PDT daily. Single lane alternating traffic. Please watch for traffic control. Expect minor delays of up to five minutes. Last updated Tue Sep 2 at 11:12 AM PDT. (DBC-81103)
    Highway 26 Highway 26. Utility work between Cinderella Rd and Reduction Rd for 36.8 km (Wells). Until Thu Oct 2. From 6:30 AM to 5:30 PM PDT on weekdays and Saturday. Single lane alternating traffic. Please watch for traffic control. BC Hydro conducting vegetation management. Expect minor delays of up to five minutes. Last updated Thu Sep 4 at 10:22 AM PDT. (DBC-81196)
    Highway 28 Highway 28. Utility work between Nootka Dr and Western Mine Rd for 39.8 km (Gold River to 37 km west of Campbell River). Road closed intermittently. Watch for traffic control. Random 5 minute closures for helicopter to fly materials over near Elk River Bridge. Last updated Thu Sep 11 at 2:33 PM PDT. (DBC-81465)
    Highway 29 Both Directions Highway 29, in both directions. Bridge maintenance between Monkman Way and Bullmoose Rd for 0.6 km (Tumbler Ridge). Until Wed Oct 1. From 12:00 AM to 12:00 AM MST on weekdays and Saturday. Single lane alternating traffic will be in effect 24 hours a day. Watch out for crews and equipment. A minimum lane width of 4.6m will be maintained throughout the duration of the works. Last updated Mon Jul 7 at 8:05 AM MST. (DBC-78833)
    Highway 29 Highway 29. Construction work between W Centennial Access and Lakeshore Dr (23 km north of Chetwynd). Until Tue Oct 7 at 5:00 PM MST. Single lane alternating traffic. Work around bridge taking place, slow down and watch for crew and equipment. Last updated Mon Sep 15 at 8:10 AM MST. (DBC-81582)
    Highway 29 Northbound Highway 29, northbound. Utility work between Farrell Creek Rd and Donis Rd for 49.3 km (12 to 61 km north of Hudson's Hope). Until Fri Oct 17. From 8:00 AM to 4:00 PM MST daily. Right lane is blocked. Last updated Wed Aug 13 at 9:32 AM MST. (DBC-80418)
    Highway 29 Both Directions Highway 29, in both directions. Bridge maintenance between Farrell Creek Bridge and Upper Cache Rd for 7.1 km (42 to 35 km north of Hudson's Hope). Until Sun Sep 21 at 7:00 PM MST. From 7:00 AM to 7:00 PM MST daily. Right lane is blocked. Watch for traffic control. Last updated Fri Sep 12 at 1:57 PM MST. (DBC-81510)
    Highway 3 Eastbound Highway 3 (Crowsnest Highway), eastbound. Construction work between First Avalanche Gate and Second Avalanche Gate for 4.4 km (13 to 18 km east of Hope). Until Tue Sep 30. From 7:00 AM to 7:00 PM PDT daily. Right lane is blocked. Last updated Mon Sep 8 at 1:52 PM PDT. (DBC-81317)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Construction work between Second Avalanche Gate and Allison Pass Summit for 7.9 km (33 to 40 km east of Hope). Until Mon Dec 1 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Expect delays. Lane Closure. Temporary detour at Snass Creek Bridge. Last updated Mon Apr 21 at 12:32 PM PDT. (DBC-74724)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Crack sealing is underway between Manning Park Resort and Thistle Rd for 16.4 km (64 km east of Hope to 48 km west of Princeton). Until Thu Sep 18 at 3:30 PM PDT. From 9:00 AM to 3:30 PM PDT on Tuesday, Wednesday and Thursday. Left lane is closed in both directions. Last updated Mon Sep 15 at 3:19 PM PDT. (DBC-81612)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Crack sealing is planned between Manning Park Resort and Monument 78-Monument 83 Trail for 3.4 km (64 km east of Hope to 61 km west of Princeton). Starting Thu Sep 18 at 9:00 AM PDT until Thu Sep 18 at 3:30 PM PDT. Left lane will be closed in both directions. Last updated Wed Sep 17 at 5:19 PM PDT. (DBC-81718)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Road construction work between Garret Rd and Sunday Summit for 11.3 km (43 to 32 km west of Princeton). Until Fri Oct 31. Single lane alternating traffic. Watch for traffic control. Minimum width to be maintained through project zone is 4.4 meters. Next update time Fri Oct 31. Last updated Tue Sep 9 at 3:52 PM PDT. (DBC-77799)
    Highway 3 Highway 3 (Crowsnest Highway). Watch for falling rocks between Wilgress Lake Rest Area and Granby Rd for 26.1 km (2 km west of Eholt Summit to Grand Forks). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73820)
    Highway 3 Highway 3 (Crowsnest Highway). Watch for falling rocks between East Lake Dr and Highway 3B for 39.8 km (Christina Lake to 24 km west of Castlegar). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73822)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Construction work at Porto Rico Rd (2 km east of Moyie). Until Sat Nov 1 at 5:00 PM MDT. From 7:00 AM to 5:00 PM MDT on weekdays and Saturday. Right lane closed. Shoulder closed. Grading and paving upgrades for new sign installation. Last updated Tue Sep 2 at 11:13 AM MDT. (DBC-81097)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Construction work at Peavine Bridge (9 km east of Moyie). Until Sat Nov 1 at 5:00 PM MDT. From 7:00 AM to 5:00 PM MDT on weekdays and Saturday. Right turn lane closed. Shoulder closed. Grading and paving upgrades for sign installation. Last updated Tue Sep 2 at 11:12 AM MDT. (DBC-81098)
    Highway 3 Highway 3 (Crowsnest Highway). Fog patches between Junction Rd and Michel Creek Rd for 63.4 km (1 km west of Elko to Sparwood). Last updated Wed Sep 17 at 7:07 AM MDT. (DBCRCON-223562)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Utility work planned between Fernie Ski Hill Rd and Boardman Rd for 3.0 km (1 to 4 km west of Fernie). Starting Wed Oct 1 at 8:00 AM MDT until Wed Oct 1 at 6:00 PM MDT. Right lane will be blocked. Watch for traffic control personnel. Last updated Fri Sep 12 at 4:53 PM MDT. (DBC-81517)
    Highway 33 Both Directions Highway 33, in both directions. Road maintenance work planned between Goudie Rd and Pyman Rd for 2.3 km (1 to 3 km south of Kelowna). Starting Thu Sep 18 until Fri Sep 19. From 6:00 AM to 6:00 PM PDT on Thursday and Friday. Single lane alternating traffic will be in effect. Last updated Tue Sep 16 at 1:17 PM PDT. (DBC-81655)
    Highway 35 Northbound Highway 35, northbound. Bridge maintenance between Pioneer Way and the end of Highway 35 for 0.4 km (Burns Lake). From 8:00 AM to 3:30 PM PDT on Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic. Expect minor delays. Last updated Wed Sep 17 at 4:20 PM PDT. (DBC-81554)
    Highway 37 Highway 37. Construction work at Hirsch Creek Bridge near Kitimat. Until Thu Sep 25. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Last updated Mon Sep 15 at 10:52 AM PDT. (DBC-81595)
    Highway 37 Highway 37. Construction work between Water Lily Bay Rd and Krumm Ave for 13.5 km (56 to 43 km north of Kitimat). Until Tue Sep 30. From 7:30 AM to 5:30 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Last updated Tue Sep 2 at 11:56 AM PDT. (DBC-81104)
    Highway 37 Both Directions Highway 37, in both directions. Bridge construction at Hanna North Bridge (7 km north of Meziadin). Until Fri Oct 31. Single lane alternating traffic. Width limit 4.00 m. EOL approvals up to 85 tonnes with no centre line crossing restriction. Expect minor delays. Next update time Tue Sep 30 at 8:00 AM PDT. Last updated Fri Aug 29 at 7:59 AM PDT. (DBC-76204)
    Highway 37 Both Directions Highway 37, in both directions. Construction work between Bell 2 Bridge and Ogilvie Cr Bridge for 4.2 km (13 to 17 km north of Bell II). Until Fri Sep 19. From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. Both directions will be closed in 10 minute increments as needed. Last updated Sat Sep 13 at 1:06 PM PDT. (DBC-81541)
    Highway 37A Both Directions Highway 37A, in both directions. Bridge maintenance at Bear River Bridge #1 (Stewart). Until Thu Sep 18 at 4:30 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect minor delays. Bridge maintenance on September 16 to September 18 daily from 7:00am to 4:30pm. Expect up to 15 minute delays. Last updated Mon Sep 15 at 11:13 AM PDT. (DBC-81593)
    Highway 37A Both Directions Highway 37A, in both directions. Watch for falling rocks between Bitter Cr. Bridge and Surprise Pullout/Windy Chain Up for 34.6 km (13 km west of Meziadin to 11 km east of Stewart). Last updated Wed Sep 17 at 3:04 PM PDT. (DBC-74957)
    Highway 3A Both Directions Highway 3A, in both directions. Bridge maintenance planned at Kokanee Ave (Nelson). Starting Mon Sep 22 until Thu Sep 25. From 9:00 AM to 3:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic will be in effect. Survey work. Last updated Wed Sep 17 at 1:47 PM PDT. (DBC-81706)
    Highway 3A Both Directions Highway 3A, in both directions. Utility work between Maia Lane and Lockhart Rd for 8.6 km (18 km south of Kootenay Bay Ferry Landing to 26 km north of Kuskonook). Until Fri Sep 19 at 3:00 PM PDT. Shoulder closed. Removal of old poles. Last updated Mon Sep 8 at 12:22 PM PDT. (DBC-81313)
    Highway 4 Eastbound Highway 4, eastbound. Maintenance planned between Maltby Rd and Tofino-Ucluelet Hwy for 25.1 km (Tofino to 1 km east of Southern Boundary of Pacific Rim National Park). Starting Thu Sep 18 at 8:00 AM PDT until Thu Sep 18 at 4:00 PM PDT. There will be ditching. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Beaver dam removal and ditching in various locations. Last updated Wed Sep 17 at 2:28 PM PDT. (DBC-81709)
    Highway 4 Both Directions Highway 4, in both directions. Road construction work between Maltby Rd and Radar Hill for 0.7 km (1 km east of Tofino to 1 km east of North Boundary of Pacific Rim National Park in Tofino). Until Tue Sep 30. Single lane alternating traffic. Expect delays. Watch for traffic control. Hwy 4 Base Repair - 24/7 Single Lane alternating traffic - Up to 20 min delays. Slow down and watch for work crews. Last updated Thu Aug 7 at 12:08 PM PDT. (DBC-79852)
    Highway 4 Both Directions Highway 4, in both directions. Construction work between Hydro Hill West Creek and Kennedy River Rest Area for 2.3 km (25 km west of Sutton Pass Summit to 23 km east of Southern Boundary of Pacific Rim National Park). Until Fri Oct 31. Single lane alternating traffic. Watch for speed reduction and Trucks turning. Next update time Fri Oct 31 at 9:00 AM PDT. Last updated Wed Aug 20 at 9:36 AM PDT. (DBC-78891)
    Highway 4 Highway 4. Fog patches between Sutton Pass Summit and the end of Highway 4 for 85.5 km (2 km west of Sutton Pass Summit to Qualicum Beach). Last updated Wed Sep 17 at 7:42 AM PDT. (DBCRCON-223564)
    Highway 4 Both Directions Highway 4, in both directions. Utility work between Wattys Rd and Saiyatchapis Rd for 0.3 km (1 km west of Port Alberni). Until Fri Sep 19 at 4:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Utility work - slow down and watch for work crews. Last updated Wed Sep 3 at 9:45 AM PDT. (DBC-81158)
    Highway 4 Eastbound Highway 4, eastbound. Utility work between Margaret St and Adelaide St for 0.2 km (Port Alberni). Until Fri Sep 19 at 4:00 PM PDT. Watch for traffic control. TELUS Pole work - PARKING LANE CLOSURE. Slow down and watch for work crews. Last updated Fri Aug 8 at 2:56 PM PDT. (DBC-80251)
    Highway 4 Highway 4. Electrical maintenance planned at Adelaide St (Port Alberni). Starting Thu Sep 18 at 7:30 AM PDT until Thu Sep 18 at 4:00 PM PDT. Watch for traffic control personnel. Last updated Mon Sep 15 at 1:29 PM PDT. (DBC-81608)
    Highway 4 Both Directions Highway 4, in both directions. Maintenance between Port Alberni Summit and Chalet Rd for 9.5 km (Cathedral Grove). Vehicles/loads over 3.2m in width must contact Permit Centre for instructions at 1-800-559-9688. Daytime travel restriction, must travel between 9pm-5am. Next update time Fri Nov 14 at 10:00 AM PDT. Last updated Fri Aug 1 at 10:04 AM PDT. (DBC-52953)
    Highway 5 Southbound Highway 5 (Coquihalla South), southbound. Utility work planned between Exit 183: Othello Rd and the start of Highway 5 (Coquihalla South) (3 km north of Hope). Starting Mon Sep 29 until Fri Oct 3. From 7:00 AM to 7:00 PM PDT on weekdays. Right lane will be blocked. Last updated Wed Sep 17 at 8:57 AM PDT. (DBC-81689)
    Highway 5 Northbound Highway 5 (Coquihalla South), northbound. Bridge maintenance at Exit 183: Othello Rd (6 km north of Hope). From 5:00 AM to 7:30 PM PDT on Tuesday, Wednesday and Thursday. Right lane closed. Last updated Mon Jul 28 at 10:39 AM PDT. (DBC-79808)
    Highway 5 Both Directions Highway 5 (Coquihalla South), in both directions. Paving operations between Exit 221: Falls Lake Rd and Exit 231: Mine Creek Rd for 6.3 km (3 to 10 km north of Coquihalla Summit). Until Tue Sep 30 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Lane closures in both directions in effect. Watch for traffic control. Dry Gulch Bridge to Henning Bridge. Delays up to 15 minutes for paving. Last updated Mon Jul 21 at 9:19 AM PDT. (DBC-79513)
    Highway 5 Both Directions Highway 5 (Coquihalla South), in both directions. Paving operations between Exit 221: Falls Lake Rd and Exit 228: Coquihalla Lakes Rd (6 km north of Coquihalla Summit). Coquihalla Lakes washrooms closed. Use Exit 228 - Britton Creek Rest Area. Next update time Fri Sep 19 at 10:00 AM PDT. Last updated Wed Sep 17 at 2:55 PM PDT. (DBC-81713)
    Highway 5 Highway 5 (Coquihalla South). There is a wildfire between Exit 231: Mine Creek Rd and Exit 250: Larson Hill for 18.6 km (12 to 31 km north of Coquihalla Summit). Wildfire activity. Limited visibility with smoke (Hope-Merritt). No stopping. Speed reduction in place, slow down and watch for wildlife. Next update time Fri Sep 19 at 10:00 AM PDT. Last updated Mon Sep 15 at 10:03 AM PDT. (DBC-81233)
    Highway 5 Northbound Highway 5 (Coquihalla South), northbound. Construction work between Exit 250: Larson Hill and Exit 256: Coldwater Rd for 6.8 km (29 km south of Merritt to 31 km north of Coquihalla Summit). Until Fri Sep 19 at 6:00 PM PDT. Roadway reduced to one lane. Please obey signage, slow down and watch for roadside workers. Last updated Mon Sep 15 at 9:02 AM PDT. (DBC-81586)
    Highway 5 Highway 5 (Coquihalla North). Construction work between Exit 286: Merritt - 97C and Exit 315: Helmer Rd for 12.8 km (Merritt). Until Tue Sep 30 at 6:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Wed Jun 25 at 9:23 AM PDT. (DBC-78512)
    Highway 5 Highway 5 (Coquihalla North). Construction work between Exit 315: Helmer Rd and Exit 336: Walloper Interchange for 20.7 km (Surrey Lake Summit). Until Tue Sep 30 at 6:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Wed Jun 25 at 9:28 AM PDT. (DBC-78513)
    Highway 5 Southbound Highway 5, southbound. Maintenance between Pinegrove Rd and McLure Ferry Rd for 3.8 km (15 to 11 km south of Barriere). Until Thu Sep 18 at 5:00 PM PDT. From 9:00 AM to 5:00 PM PDT on Wednesday. Shoulder closed. Environmental remediation excavation and soil sampling program. Last updated Tue Sep 16 at 1:06 PM PDT. (DBC-81653)
    Highway 5 Southbound Highway 5, southbound. Maintenance planned between Pinegrove Rd and McLure Ferry Rd for 3.8 km (15 to 11 km south of Barriere). Starting Tue Sep 23 at 9:00 AM PDT until Fri Sep 26 at 5:00 PM PDT. From 8:00 AM to 5:00 PM PDT on Tuesday, Wednesday, Thursday and Friday. Shoulder will be closed. Environmental remediation. Last updated Tue Sep 16 at 1:05 PM PDT. (DBC-81654)
    Highway 5 Southbound Highway 5, southbound. Construction work between Mount Olie St and Webb Rd for 1.9 km (Little Fort). Until Fri Oct 10 at 5:30 PM PDT. Integrity dig completion and demobilization. Single lane alternating traffic during demobilization. Last updated Tue Sep 16 at 8:44 AM PDT. (DBC-81638)
    Highway 5 Both Directions Highway 5, in both directions. Utility work between Avola East Frontage Rd S Access and Diamond Dr for 1.1 km (Avola). Single lane alternating traffic. Poleline maintenance. Telecom cable installation. Last updated Wed Sep 10 at 9:20 AM PDT. (DBC-81405)
    Highway 5 Northbound Highway 5, northbound. Ditching between Albreda Pit Rd and Camp Creek Rest Area for 14.3 km (23 to 9 km south of Valemount). Southbound lane closure. Watch for traffic control. Truck speed limit 70 km/h. Ditching work, North Bound lane reduced to 70 kilometers per hour. Next update time Tue Sep 30 at 8:30 AM PDT. Last updated Mon Jul 21 at 5:47 PM PDT. (DBC-79542)
    Highway 5 Both Directions Highway 5, in both directions. Road construction work between Whiskeyfill Rd and Tete Jaune Access Rd for 24.1 km (5 km south of Valemount to 1 km south of Tete Jaune). Until Mon Oct 20. From 12:00 AM to 12:00 AM PDT daily. Paving operations. Single lane alternating traffic. Pilot car controlled. Last updated Tue Sep 2 at 7:50 AM PDT. (DBC-81092)
    Highway 5 Northbound Highway 5, northbound. Paving operations between Cedarside Rd; Cranberry Lake Rd and Tete Jaune Access Rd for 22.3 km (2 km south of Valemount to 1 km south of Tete Jaune). Until Sat Sep 27 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Pilot car controlled. Roadside barriers removed. Watch for crews on highway. Last updated Sun Jul 13 at 8:26 PM PDT. (DBC-79166)
    Highway 6 EW Highway 6 EW. Shoulder maintenance planned between Hollingsworth Rd and Monashee Summit for 0.2 km (7 km east of Cherryville). Starting Wed Oct 1 until Mon Oct 20. From 7:00 AM to 5:00 PM PDT daily. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Expect minor delays. Single lane alternating traffic will be in effect for 24 hours a day, 7 days a week. Last updated Tue Sep 16 at 1:27 PM PDT. (DBC-81656)
    Highway 6 EW Both Directions Highway 6 EW, in both directions. Tree pruning between Monashee Summit and Ferrie Rd for 7.3 km (18 to 10 km west of Needles). Until Fri Oct 31. From 7:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. No work on Statutory Holidays. Last updated Mon Aug 18 at 9:50 AM PDT. (DBC-80590)
    Highway 6 NS Both Directions Highway 6 NS, in both directions. Maintenance between Lebhado Rd and Passmore Upper Rd for 7.0 km (Passmore). Until Fri Sep 19 at 6:00 PM PDT. From 8:00 AM to 6:00 PM PDT on Wednesday, Thursday and Friday. Single lane alternating traffic. Culvert replacement. Last updated Wed Sep 17 at 8:24 AM PDT. (DBC-81686)
    Highway 6 NS Both Directions Highway 6 NS, in both directions. Construction work between Storbo Rd and Pass Creek Rd for 6.9 km (5 km south of Passmore to 2 km west of Playmor Junction). Until Sat Oct 25. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Last updated Fri Aug 22 at 3:16 PM PDT. (DBC-80787)
    Highway 7 Westbound Highway 7 (Lougheed Highway), westbound. Utility work planned between Spilsbury St and River Rd for 0.6 km (Maple Ridge). Starting Mon Sep 22 until Fri Sep 26. From 8:00 AM to 4:00 PM PDT on weekdays. Right lane will be closed. Shoulder will be closed. Last updated Fri Sep 12 at 12:13 PM PDT. (DBC-81507)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 272 St for 0.5 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. September 15-20, 22-27, Sept. 29, Oct. 1-4, Oct. 6-10, Oct. 14-16. Construction speed zone 50km/h. No work on Sept. 30 and Oct. 11-13. Next update time Sat Oct 18 at 5:00 PM PDT. Last updated Mon Sep 15 at 7:15 AM PDT. (DBC-70968)
    Highway 7 Eastbound Highway 7 (Lougheed Highway), eastbound. Electrical maintenance planned between Dyke Rd and Shook St for 1.1 km (Mission). Starting Mon Sep 22 until Fri Sep 26. From 9:00 AM to 3:00 PM PDT daily. Right lane will be closed. Last updated Thu Sep 11 at 3:17 PM PDT. (DBC-81471)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Paving operations between Hawkins Pickle Rd and Gledhill Rd for 0.7 km (3 km east of Mission). Until Sat Oct 11. From 7:00 AM to 6:00 AM PDT daily. Lane Closure. Watch for traffic control. No traffic control on long weekends. Last updated Thu Sep 11 at 9:33 AM PDT. (DBC-81447)
    Highway 7 Westbound Highway 7 (Lougheed Highway), westbound. Utility work planned between Skweahm Pl and Waring Rd for 3.3 km (10 to 7 km east of Mission). Starting Mon Sep 22 at 9:00 AM PDT until Fri Sep 26 at 3:00 PM PDT. Right lane will be closed. BC Hydro maintenance and pole replacement. Last updated Thu Sep 11 at 3:44 PM PDT. (DBC-81460)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Road maintenance work between Taylor Rd and Harrison Bay Rd for 8.1 km (13 km east of Mission to 6 km west of Kent). Until Tue Sep 30. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays. Last updated Sat Aug 30 at 11:48 PM PDT. (DBC-79598)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Utility work between Beach Camp Rd and Harrison Mills Bridge for 1.3 km (Kent). Until Fri Sep 19. From 9:00 AM to 3:00 PM PDT daily. Lane Closure. Watch for traffic control. Expect delays. Last updated Wed Sep 3 at 6:07 AM PDT. (DBC-80938)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Utility work planned between Junction with Highway 9 and Seabird Island Rd for 0.8 km (Kent). Starting Mon Sep 22 until Fri Oct 3. From 8:00 AM to 4:30 PM PDT daily. Single lane alternating traffic will be in effect. Last updated Wed Sep 17 at 2:49 PM PDT. (DBC-81712)
    Highway 7B Westbound Highway 7B (Mary Hill Bypass), westbound. Construction work between Coast Meridian Rd and Broadway St for 0.6 km (Port Coquitlam). Until Fri Oct 31. From 9:00 AM to 3:00 PM PDT daily. Lane Closure. Bus Stop Improvement project. Last updated Wed Jun 18 at 1:02 PM PDT. (DBC-78197)
    Highway 7B Westbound Highway 7B (Mary Hill Bypass), westbound. Construction work between Kingsway Ave and Coast Meridian Rd for 0.5 km (Port Coquitlam). Until Wed Dec 31 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on weekdays. Right lane closed. Bus Stop Improvement project. Next update time Mon Dec 15 at 10:00 AM PDT. Last updated Wed Jul 16 at 10:00 AM PDT. (DBC-78829)
    Highway 8 Both Directions Highway 8, in both directions. Construction work between Start of Highway 8 and Porcupine Ridge Rd 6 km east of Spences Bridge. Until Sat Nov 15. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 16, 17, 18, 19. Last updated Tue Aug 26 at 5:25 PM PDT. (DBC-80660)
    Highway 8 Highway 8. Watch for falling rocks between the start of Highway 8 and Dot Ranch Cut-Off Rd West for 34.8 km (Spences Bridge to 29 km west of Merritt). There is debris on the road. Last updated Wed Sep 17 at 3:28 AM PDT. (DBC-72877)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 2.6 km (Spences Bridge). Until Fri Sep 19 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect minor delays. Site 20/21. Last updated Wed Sep 17 at 3:37 PM PDT. (DBC-79173)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 0.3 km (Spences Bridge). Until Mon Sep 22 at 5:00 PM PDT. Site 22. Wed Sep 17, single lane alternating traffic will be in effect 24 hrs. Watch for traffic control personnel and obey traffic signals. Expect delays of 45-min closures between 10AM to 2PM. Last updated Tue Sep 16 at 8:38 PM PDT. (DBC-80709)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 3.3 km (5 to 8 km east of Spences Bridge). Until Sat Sep 20 at 4:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Site 12 to 15. Last updated Fri Sep 12 at 10:24 AM PDT. (DBC-80708)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and 14 Mile Ranch Rd for 2.7 km (9 to 12 km east of Spences Bridge). Until Fri Nov 28. Single lane alternating traffic. SITE 9/10. 30-min closures between 10am and 2pm daily. Traffic flushed between closures. Emergency vehicles accommodated. Next update time Fri Nov 28 at 9:00 AM PDT. Last updated Mon Sep 8 at 8:00 AM PDT. (DBC-74796)
    Highway 9 Southbound Highway 9, southbound. Maintenance between Cheam Ave and McDonald Rd for 1.1 km (Kent). Until Fri Sep 19. From 9:00 AM to 3:00 PM PDT on Tuesday, Wednesday, Thursday and Friday. Right lane closed. Last updated Fri Sep 5 at 1:35 PM PDT. (DBC-81234)
    Highway 9 Both Directions Highway 9, in both directions. Paving operations between McPherson Rd and Lillooet Ave for 2.6 km (Kent to Harrison Hot Springs). Until Sun Nov 30. From 8:00 AM to 9:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Last updated Tue Sep 16 at 10:34 AM PDT. (DBC-81645)
    Highway 9 Both Directions Highway 9, in both directions. Road construction work between Emerald Ave and Miami River Dr for 1.4 km (Harrison Hot Springs). Until Fri Nov 14. From 8:00 AM to 9:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Reduced speed zone. Watch for traffic control equipment and personnel. Last updated Tue Sep 9 at 7:11 PM PDT. (DBC-81376)
    Highway 91 Both Directions Highway 91, in both directions. Bridge maintenance planned at Alex Fraser Bridge (Delta). Starting Sun Sep 21 at 6:30 AM PDT until Sun Sep 21 at 10:30 AM PDT. Watch for traffic control personnel. Last updated Mon Sep 15 at 5:22 AM PDT. (DBC-81569)
    Highway 93 Highway 93. Limited visibility dense fog between Back Rd and Wasa Junction for 31.5 km (7 km south of Fort Steele to 3 km north of Wasa). Limited visibility with fog. Fog patches. Last updated Wed Sep 17 at 8:51 AM MDT. (DBCRCON-223565)
    Highway 93 Both Directions Highway 93, in both directions. Construction work between Radium Hill Rd and Stanley St for 3.1 km (Radium Hot Springs). Until Tue Sep 30. From 6:00 AM to 4:00 PM MDT on weekdays. Southbound lane closure Sept 15th - Sept 18th from 6am to 5pm, Sept 19th from 6am to 12pm. Shoulder closed. Traffic reduced from 70 km/hr to 50 km/hr Mon-Fri during lane closure. No speed reduction on Saturdays. Last updated Fri Sep 12 at 10:42 AM MDT. (DBC-73931)
    Highway 93 Both Directions Highway 93, in both directions. Utility work between West Boundary of Kootenay National Park and McKay Creek Maint for 1.4 km (4 to 3 km north of Radium Hot Springs). Until Fri Oct 10. From 7:00 AM to 7:00 PM MDT daily. Periodic single lane traffic and intermittent closures. Lane diversions onto gravel. Lane width and speed limit reductions. Expect delays up to 15 mins. Wide loads report to Parks Canada for approval. Last updated Tue Sep 9 at 5:04 PM MDT. (DBC-81235)
    Highway 95A Highway 95A. Limited visibility dense fog between the start of Highway 95A and Wasa Junction for 55.5 km (Cranbrook to 27 km north of Kimberley). Limited visibility with fog. Fog patches. Last updated Wed Sep 17 at 8:51 AM MDT. (DBCRCON-223566)
    Highway 97 Highway 97. Utility work between Soda Creek Substation and Pinnel Road. Until Wed Sep 3. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Please watch for traffic control signage and personnel. Expect minor delays of up to five minutes. Last updated Wed Aug 13 at 2:28 PM PDT. (DBC-80435)
    Highway 97 Highway 97. Bridge construction at Tetsa River #1 Bridge. Until Tue Sep 30. From 7:00 AM to 7:00 PM MST daily. Single lane alternating traffic. Tetsa River #1 Substructure Rehabilitation. Width restriction of 3.8m OAW. Last updated Tue Sep 16 at 3:38 PM MST. (DBC-80654)
    Highway 97 Northbound Highway 97, northbound. Utility work at 100 Mile House. Until Sun Sep 21. From 7:00 AM to 5:00 PM PDT daily. Lane Closure. Slow down and obey all traffic control personnel and signage. Delays of 5 minutes. Last updated Thu Sep 4 at 8:35 AM PDT. (DBC-80883)
    Highway 97 Northbound Highway 97, northbound. Utility work between Maple Drive and Balsam Ave 7 km south of Quesnel. Until Fri Sep 19. From 7:30 AM to 6:30 PM PDT on weekdays. Shoulder closed. Please watch for traffic control signage and personnel. Last updated Thu Sep 4 at 10:37 AM PDT. (DBC-81198)
    Highway 97 Southbound Highway 97, southbound. Utility work between Airport Road and Stevens Road 6 km north of Quesnel. Until Fri Sep 19. From 7:00 AM to 5:00 PM PDT on weekdays. Shoulder closed. Please watch for traffic control. Expect minor delays of up to five minutes. Last updated Thu Sep 4 at 4:01 PM PDT. (DBC-81211)
    Highway 97 Both Directions Highway 97, in both directions. Shoulder maintenance between 100th Ave and 13th Ave for 40.1 km (Okanagan Falls to 1 km north of Osoyoos). Until Wed Oct 1 at 5:00 PM PDT. Mowing. Watch for slow moving vehicles. There will also be gravel, as they are adding gravel to the shoulders. Last updated Wed Sep 3 at 1:21 PM PDT. (DBC-81088)
    Highway 97 Northbound Highway 97, northbound. Road construction work between Pineview Dr and Sandhill Rd (1 km south of Penticton). Until Wed Oct 29. From 7:00 AM to 5:00 PM PDT on weekdays. Lane Closure. Shoulder closed. Highway extension work. Constructing new intersection and installing new traffic lights. Last updated Mon Aug 11 at 4:45 PM PDT. (DBC-71783)
    Highway 97 Southbound Highway 97, southbound. Road maintenance work between Sage Mesa Dr and Green Lake Rd for 22.0 km (Okanagan Falls to 2 km north of Penticton). From 7:30 AM to 4:30 PM PDT on Wednesday and Thursday. Right lane will be closed. Watch for crew & equipment. Use caution & reduce speed when passing. Last updated Mon Aug 25 at 11:14 AM PDT. (DBC-80142)
    Highway 97 Highway 97. Bridge maintenance planned between Wetaskiwin Rd and Pinaus Lake Rd (3 km west of Falkland). Starting Tue Sep 23 until Mon Sep 29. From 6:00 AM to 6:00 PM PDT daily. Single lane alternating traffic will be in effect. Single Lane Alternating Traffic in effect 24 hours a day. Last updated Wed Sep 17 at 1:26 PM PDT. (DBC-81705)
    Highway 97 Eastbound Highway 97, eastbound. Tree pruning planned between Monte Creek and Duck Range Rd for 4.4 km (5 to 1 km east of Monte Creek). Starting Tue Sep 23 at 8:00 AM PDT until Sat Sep 27 at 4:00 PM PDT. Right lane will be closed. Last updated Wed Sep 10 at 2:49 PM PDT. (DBC-81422)
    Highway 97 Southbound Highway 97 (Cariboo Connector), southbound. Vehicle incident between Meadow Lake Rd and Chasm Rd for 1.4 km (13 km north of Clinton to 14 km south of 70 Mile House). Single lane alternating traffic. Last updated Wed Sep 17 at 3:04 PM PDT. (DBC-81066)
    Highway 97 Highway 97 (Cariboo Connector). Fog patches between Elefson Rd and Butler Rd for 52.0 km (6 km south of 100 Mile House to 32 km south of 150 Mile House). Last updated Wed Sep 17 at 2:45 PM PDT. (DBCRCON-223559)
    Highway 97 Northbound Highway 97 (Cariboo Connector), northbound. Paving operations planned between Taylor Ave and First St for 0.3 km (100 Mile House). Starting Wed Sep 24 until Thu Sep 25. From 8:00 AM to 4:00 PM PDT on Wednesday and Thursday. Lane Closure. Last updated Wed Sep 10 at 9:02 AM PDT. (DBC-81401)
    Highway 97 Highway 97 (Cariboo Connector). Utility work between Clear Rd N and Kragbak Rd for 7.7 km (Wildwood). Until Thu Oct 9. From 8:00 AM to 4:00 PM PDT on weekdays. Please watch for traffic control signage and personnel. Expect minor delays of up to five minutes. Shoulder lane will be closed. Last updated Tue Sep 2 at 11:06 AM PDT. (DBC-81102)
    Highway 97 Both Directions Highway 97 (Cariboo Connector), in both directions. Ditching between Kragbak Rd and Pinnell Rd (8 km north of Wildwood). Until Thu Sep 18 at 4:00 PM PDT. Single lane alternating traffic. Work from Mountain House Rd. To Mackenzie Ave. Last updated Mon Sep 15 at 9:59 AM PDT. (DBC-81591)
    Highway 97 Highway 97 (Cariboo Connector). Limited visibility with smoke between Lavally Rd and Olson Rd for 87.6 km (47 km south of Quesnel to 24 km south of Hixon). Last updated Wed Sep 17 at 4:25 PM PDT. (DBCRCON-223568)
    Highway 97 Southbound Highway 97 (Cariboo Connector), southbound. Construction work planned between Stevens Rd and Finning Rd for 5.0 km (Quesnel). Starting Mon Sep 22 until Fri Sep 26. From 7:00 AM to 5:00 PM PDT on weekdays. Lane Closure. Expect delays. Last updated Wed Sep 10 at 9:04 AM PDT. (DBC-81402)
    Highway 97 Highway 97 (Cariboo Connector). Rest area closed between Charles Rd and Anderson Rd (15 km south of Pineview). Next update time Tue Sep 30 at 10:00 AM PDT. Last updated Mon Jun 30 at 10:04 AM PDT. (DBC-71474)
    Highway 97 Highway 97. Utility work between Noranda Rd and Collins Rd for 0.6 km (Prince George). Until Sat Sep 20 at 6:00 PM PDT. Right lane closed. Last updated Tue Aug 5 at 8:12 AM PDT. (DBC-80093)
    Highway 97 Both Directions Highway 97, in both directions. Bridge construction between Wright Creek Rd and Kinney Rd for 0.5 km (8 to 7 km north of Prince George). Until Sat Nov 15. Single lane alternating traffic. Last updated Tue Apr 15 at 3:44 PM PDT. (DBC-75426)
    Highway 97 Highway 97. Utility work between Powder King Rd and Old Hasler Rd for 26.5 km (Pine Pass Summit). Until Tue Sep 30. From 7:00 AM to 7:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Last updated Fri Aug 22 at 10:38 AM PDT. (DBC-80768)
    Highway 97 Southbound Highway 97, southbound. Ditching between Hasler Rd and Powder King Rd for 47.1 km (33 km north of Pine Pass Summit to 23 km south of Chetwynd). Until Fri Sep 19 at 4:30 PM MST. From 6:30 AM to 4:30 PM MST on Tuesday, Wednesday, Thursday and Friday. Single lane alternating traffic. Slow down. Watch for crew and equipment in the area. Last updated Tue Sep 16 at 8:57 AM MST. (DBC-81347)
    Highway 97 Highway 97 (Alaska Highway). Road construction work between 221 Rd and Historic Milepost 3 for 0.2 km (1 km north of Dawson Creek). Until Wed Sep 24 at 5:00 PM MST. Watch for traffic control, Hwy 2 North access to Trading Post Rd near Swamp Donkey will be closed for duration of works. Last updated Mon Sep 15 at 8:00 AM MST. (DBC-81410)
    Highway 97 Both Directions [Truncated] Highway 97 (Alaska Highway), in both directions. Bridge maintenance planned between Big Bam Rd and Taylor Bridge for 0.1 km (Taylor). Starting Mon Sep 22 at 7:00 PM MST until Fri Oct 10 at 3:30 AM MST. From 7:00 PM to 3:30 AM MST on weekdays. Single lane alternating traffic will be in effect. Expect delays. Welding on Taylor Bridge. Drive posted speed limits, watch for crews and equipment. Contact DRM 250-262-2600 if load is overweight or wider than 12.6'. Last updated Sat Sep 13 at
    Highway 97 Southbound Highway 97 (Alaska Highway), southbound. Road maintenance work between Cherry Ave and Pine Ave for 1.0 km (Taylor). Until Thu Sep 18 at 4:00 PM MST. From 7:00 AM to 4:00 PM MST on Wednesday and Thursday. Southbound lane closure. Detour in effect. Detour southbound 100th St and to Pine Ave. Last updated Wed Sep 17 at 2:28 PM MST. (DBC-81675)
    Highway 97 Southbound Highway 97 (Alaska Highway), southbound. Utility work between 269 Rd and Hemlock Rd (1 km north of Fort St John). Until Fri Sep 19 at 5:00 PM MST. Shoulder closed. Telecom conduit and cable installation. Last updated Mon Sep 8 at 10:47 AM MST. (DBC-81303)
    Highway 97 Southbound Highway 97 (Alaska Highway), southbound. Utility work between Charlie Lake Cres and Bens Rd for 1.0 km (8 to 7 km north of Fort St John). Until Fri Sep 19 at 5:00 PM MST. Shoulder closed. Telecom conduit and cable installation. Last updated Mon Sep 8 at 10:53 AM MST. (DBC-81306)
    Highway 97A Southbound Highway 97A, southbound. Road maintenance work between Hubert Ave and King Ave for 0.2 km (Enderby). Until Fri Oct 10 at 3:00 PM PDT. Possible delays. Last updated Thu Sep 11 at 3:05 PM PDT. (DBC-81470)
    Highway 97A Both Directions Highway 97A, in both directions. Maintenance between Cliff Ave and Stanley Ave for 0.2 km (Enderby). Until Fri Sep 26 at 6:00 PM PDT. From 8:00 AM to 6:00 PM PDT on weekdays. Left turn lane closed. Watch for traffic control. Groundwater monitoring. No work on weekends. Last updated Fri Sep 12 at 8:46 AM PDT. (DBC-81490)
    Highway 97C Both Directions Highway 97C (Okanagan Connector), in both directions. Maintenance between Brenda Mine Rd and Pennask Summit (2 km east of Pennask Summit). Until Tue Sep 23. From 7:00 AM to 5:00 PM PDT on weekdays. Centre lane is closed in both directions. Watch for traffic control. Last updated Tue Sep 2 at 12:58 PM PDT. (DBC-81106)
    Highway 97C Both Directions Highway 97C, in both directions. Electrical maintenance between North Rd and Empter Frontage Rd for 28.2 km (Ashcroft). Until Fri Sep 19. From 8:00 AM to 6:00 PM PDT on weekdays. Last updated Wed Sep 10 at 9:10 AM PDT. (DBC-81403)
    Highway 99 Northbound Highway 99, northbound. Utility work planned between River Rd and 64 St. Starting Mon Oct 6 until Wed Oct 8. From 10:00 PM to 4:30 AM PDT daily. Right lane will be closed. Last updated Wed Sep 10 at 4:35 PM PDT. (DBC-81429)
    Highway 99 Southbound Highway 99, southbound. Bridge maintenance at Exit 16 (Delta). Until Fri Sep 19 at 5:00 AM PDT. From 10:00 PM to 5:00 AM PDT on Tuesday, Wednesday and Thursday. Exit ramp is closed. Detour in effect. Watch for traffic control. Detour in place to Exit 10. Last updated Fri Sep 12 at 2:47 PM PDT. (DBC-81514)
    Highway 99 Northbound Highway 99, northbound. Road maintenance work between 112 St and Exit 26 for 5.1 km (Delta). Until Fri Oct 3. From 12:00 AM to 12:00 PM PDT on weekdays. Watch for traffic control. Last updated Wed Aug 27 at 2:34 PM PDT. (DBC-80945)
    Highway 99 Southbound Highway 99, southbound. Utility work between Exit 26 and Exit 20 for 4.7 km (Delta). Until Sat Nov 7, 2026 at 11:45 PM PDT. Last updated Fri Sep 12 at 8:13 PM PDT. (DBC-81533)
    Highway 99 Southbound Highway 99, southbound. Electrical maintenance between Exit 26 and Exit 20 for 4.7 km (Delta). Until Thu Oct 23. From 12:15 AM to 12:00 PM PDT daily. Construction work. Right turn lane closed. Last updated Mon Sep 15 at 11:09 AM PDT. (DBC-81597)
    Highway 99 Highway 99. Utility work planned between 72 St and Exit 28 for 1.8 km (Delta). Starting Mon Sep 22 until Wed Oct 8. From 7:00 AM to 5:00 PM PDT daily. Shoulder maintenance planned. Survey works. Last updated Wed Sep 17 at 12:52 PM PDT. (DBC-81704)
    Highway 99 Southbound Highway 99, southbound. Utility work planned between Exit 28 and Exit 26 for 2.5 km (Delta). Starting Mon Sep 22 until Wed Sep 24. From 10:00 PM to 5:30 AM PDT daily. Shoulder will be closed. Last updated Wed Sep 10 at 4:36 PM PDT. (DBC-81430)
    Highway 99 Both Directions Highway 99, in both directions. Road construction work between Rice Mill Rd and Deas Thruway for 0.3 km (Richmond). Until Fri Sep 19. From 10:00 PM to 4:30 AM PDT on Wednesday and Thursday. Last updated Wed Sep 10 at 1:46 PM PDT. (DBC-81418)
    Highway 99 Southbound Highway 99, southbound. Construction work planned between Exit 36: Westminster Hwy and Exit 32: Steveston Hwy for 4.1 km (Richmond). Starting Wed Sep 17 until Sat Sep 20. From 10:00 PM to 5:30 AM PDT on Wednesday, Thursday and Friday. HOV lane will be closed. Shoulder will be closed. Last updated Wed Sep 10 at 1:42 PM PDT. (DBC-81417)
    Highway 99 Southbound Highway 99, southbound. Construction work at Exit 32: Steveston Hwy (Richmond). Until Fri Sep 19. From 10:00 PM to 11:00 PM PDT on Wednesday and Thursday. Right lane closed. Last updated Wed Sep 17 at 12:41 PM PDT. (DBC-81703)
    Highway 99 Southbound Highway 99, southbound. Bridge maintenance planned between No 5 Rd and Exit 36: Westminster Hwy (Richmond). Starting Thu Sep 18 at 11:00 PM PDT until Fri Sep 19 at 4:00 AM PDT. Lane Closure. Watch for traffic control personnel. BUS LANE CLOSED FOR 350M FOR SLOPE REPAIR. Last updated Tue Sep 16 at 5:55 AM PDT. (DBC-81610)
    Highway 99 Southbound Highway 99, southbound. Utility work between Lost Lagoon Rd and Denman St for 0.5 km (Vancouver). Until Fri Sep 19. From 10:00 PM to 5:00 AM PDT on weekdays. Right lane is blocked. Last updated Wed Sep 3 at 12:00 PM PDT. (DBC-81165)
    Highway 99 Both Directions Highway 99, in both directions. Utility work at Scott Cres (Squamish). Until Tue Sep 30 at 4:00 PM PDT. Right turn lane closed. Last updated Mon Aug 18 at 2:47 PM PDT. (DBC-80603)
    Highway 99 Southbound Highway 99, southbound. Stalled vehicle between Daisy Lake Rd and Alice Lake Rd (Squamish). Right lane is blocked. Next update time Wed Sep 17 at 7:45 PM PDT. Last updated Wed Sep 17 at 6:48 PM PDT. (DBC-81719)
    Highway 99 Both Directions Highway 99, in both directions. Bridge maintenance between Callaghan Valley Rd and Alpha Lake Rd (Whistler). Until Wed Sep 17 at 11:45 PM PDT. Watch for traffic control. Callaghan Creek Bridge - Counterflow: Southbound traffic in northbound left lane with Northbound traffic in northbound right lane. Last updated Fri Sep 12 at 4:18 PM PDT. (DBC-81518)
    Highway 99 Southbound Highway 99, southbound. Utility work planned between Harrow Rd and Portage Rd for 0.4 km (Pemberton). Starting Mon Sep 29 at 8:00 AM PDT until Fri Oct 3 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT on weekdays. Right lane will be blocked. Watch for traffic control personnel. No work on September 30th (Stat Holiday.). Last updated Fri Sep 12 at 12:13 PM PDT. (DBC-81506)
    Highway 99 Highway 99. Utility work between Pavilion-Clinton Rd and Hat Creek Rd for 21.1 km (29 to 50 km north of Lillooet). Until Tue Sep 30. From 7:00 AM to 6:00 PM PDT on weekdays. Single lane alternating traffic. Please watch for traffic control. Expect minor delays of up to five minutes. Last updated Thu Sep 4 at 8:42 AM PDT. (DBC-81192)
    Highway 99 Highway 99. Utility work between Hat Creek Rd and Old Cariboo Rd for 19.7 km (70 to 50 km north of Lillooet). Until Tue Sep 30. From 7:00 AM to 6:00 PM PDT on weekdays. Single lane alternating traffic. Please watch for traffic control personnel and crews working. Expect minor delays of up to five minutes. Last updated Mon Aug 11 at 9:59 AM PDT. (DBC-80308)
    Horsefly-Likely Rd Horsefly-Likely Rd. Limited visibility with smoke between the start of Horsefly-Likely Rd and the end of Horsefly-Likely Rd for 4.5 km (150 Mile House). Last updated Wed Sep 17 at 2:54 PM PDT. (DBCRCON-223532)
    Nazko Rd Nazko Rd. Limited visibility with smoke between the start of Nazko Rd and Yetta Rd for 19.6 km (95 to 75 km east of Nazko). Last updated Wed Sep 17 at 4:25 PM PDT. (DBCRCON-223569)
    Nisga'a Hwy Both Directions Nisga'a Hwy (Highway 113), in both directions. Mowing between Nass Rd and Big Cedar Bridge for 45.1 km (Gitlaxt'aamiks (New Aiyanish)). For the next two months. Last updated Wed Sep 10 at 4:52 PM PDT. (DBC-81431)
    Other Roads Old Alaska Highway. Geotechnical investigation at Kiskatinaw Curved Bridge 30 km north of Dawson Creek. Bridge is closed. Slide impacting bridge structure, assessment underway. Next update time Fri Jan 2, 2026 at 10:00 AM MST. Last updated Wed Jul 2 at 10:05 AM MST. (DBC-30093)
    Other Roads Both Directions Colleymount Rd, in both directions. Washout at 53.5km near Burns Lake. Single lane alternating traffic. Partial road washout, obey signage. Next update time Fri Sep 26 at 10:00 AM PDT. Last updated Fri Aug 29 at 9:47 AM PDT. (DBC-71008)
    Other Roads Both Directions Kitsuksis Rd., in both directions. Utility work between Short st. And Spruce St. Until Fri Oct 31 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Watermain installation. Last updated Mon Jun 30 at 8:23 AM PDT. (DBC-73760)
    Other Roads Both Directions Boys Rd, in both directions. Utility work between Highway 1 and Mission Rd. Until Fri Oct 31. From 7:00 AM to 7:00 PM PDT daily. Shoulder closed. Last updated Thu Jun 12 at 12:11 PM PDT. (DBC-77927)
    Other Roads Eastbound Marine Dr, eastbound. Road construction work between Highway 99 and Capilano Rd in North Vancouver - District. Until Wed Oct 15 at 8:00 PM PDT. From 9:00 AM to 5:00 PM PDT on Saturday and from 7:00 AM to 8:00 PM PDT on weekdays. Right lane closed. Shoulder closed. Lane closure to remain overnight. No work on Sundays or holidays. Last updated Fri Aug 29 at 4:17 PM PDT. (DBC-78434)
    Other Roads Both Directions Shuswap Road, in both directions. Construction work between Sun Rivers Drive and Harper Ranch Pinantan near Kamloops. Until Tue Sep 30 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Last updated Mon Jul 28 at 3:37 PM PDT. (DBC-79824)
    Other Roads Southbound Erickson Rd, southbound. Utility work between 11 Ave S and 16 Ave S in Creston. Until Sat Sep 20. From 7:00 AM to 5:00 PM PDT on weekdays. Watch for traffic control. Expect delays. Last updated Wed Jul 30 at 12:46 PM PDT. (DBC-79911)
    Other Roads Both Directions Holden Corso Rd, in both directions. Utility work between Rugg Rd and Barnes Rd. Until Fri Oct 31 at 5:00 PM PDT. Single lane alternating traffic. Expect delays. Watch for traffic control. Watermain and Road works. Watch for work crews. Last updated Wed Jul 30 at 2:59 PM PDT. (DBC-79923)
    Other Roads Both Directions Fraser Hwy, in both directions. Construction work at Hwy 10 in Langley - City. Until Fri Jan 30, 2026 at 8:00 PM PDT. Fraser Highway left turn lane to Highway 10 closed. Last updated Mon Sep 8 at 9:56 AM PDT. (DBC-80099)
    Other Roads Both Directions Lochside Dr, in both directions. Utility work between Captains Walk and Ocean Avenue. Until Fri Nov 21. From 6:00 AM to 6:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Last updated Thu Aug 7 at 4:21 PM PDT. (DBC-80205)
    Other Roads Iron Mtn Road. Road construction work between Start and 3K. Until Thu Sep 10, 2026. From 7:00 AM to 3:30 PM PDT on Monday, Tuesday, Wednesday and Thursday. Expect minor delays. Last updated Wed Sep 3 at 6:07 AM PDT. (DBC-80398)
    Other Roads Both Directions Fulford Ganges Road, in both directions. Bridge construction between Blackburn Rd and Horel Rd. Until Sun Nov 30. From 7:00 AM to 5:00 PM PDT on weekdays. Detour in effect. Single lane alternating traffic. Watch for traffic control. Construction speed zone in effect. Next update time Sun Nov 30 at 3:00 PM PDT. Last updated Mon Sep 8 at 3:50 PM PDT. (DBC-80598)
    Other Roads Both Directions Mission Mtn Rd, in both directions. Maintenance between Road 40 and Shalath 48 km west of Lillooet. Until Fri Sep 26 at 4:00 PM PDT. From 7:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Expect 20 Minute Delays between Gabiens and surge road entrance. Watch for equipment and crews working. Last updated Fri Aug 22 at 10:26 AM PDT. (DBC-80766)
    Other Roads Laidlaw Road. Utility work between Francher Road and Dent Road near Hope. Until Fri Sep 19. From 9:00 AM to 4:00 PM PDT on weekdays. Lane Closure. Last updated Mon Aug 25 at 11:09 AM PDT. (DBC-80849)
    Other Roads Both Directions Rey Lake Road, in both directions. Utility work between Highway 97C and End of Road. Until Fri Oct 31 at 7:00 AM PDT. Road closed. Full closure for powerline upgrades to Highland Valley Mine. Last updated Fri Sep 5 at 10:24 AM PDT. (DBC-81166)
    Other Roads Both Directions Binnacle Road, in both directions. Construction work at Whistlebuoy Rd. Until Tue Oct 7 at 4:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Watch for work crews and turning trucks. Last updated Mon Sep 8 at 10:07 AM PDT. (DBC-81301)
    Other Roads Pighin Rd. Limited visibility with smoke between 9039 Pighin Rd and 8892 Pighin Rd. Until Fri Sep 26 at 7:00 PM MDT. Prescribed burn. Last updated Tue Sep 9 at 10:48 AM MDT. (DBC-81354)
    Other Roads Both Directions Highway 3/5A, in both directions. Road construction work planned between Vermillion Ave and Old Headly Rd. Starting Thu Sep 18 at 6:00 PM PDT until Fri Sep 19 at 6:00 AM PDT. Single lane alternating traffic will be in effect. Bridge St will be closed between Hwy 3 and Tapton Ave. Last updated Wed Sep 10 at 2:35 PM PDT. (DBC-81421)
    Other Roads Both Directions Hawkins Pickle Rd, in both directions. Construction work planned at the Railway Crossing. Starting Tue Sep 23 until Fri Sep 26. Road closure planned. Railway crossing replacement. No access Sept 22nd & 23rd, 10pm-6am, Sept 24th, 9am-4pm. Last updated Thu Sep 11 at 2:53 PM PDT. (DBC-81468)
    Other Roads Northbound Germansen Landing Road, northbound. Geotechnical investigation between 1.5KM and 2.5KM near Fort St James. Road closed ahead. Detour in effect. Germansen Landing Road is closed at KM 1.7. Detour in Effect using the Takla Road - Teardrop FSR road. Next update time Fri Sep 26 at 8:00 AM PDT. Last updated Fri Sep 12 at 4:31 PM PDT. (DBC-81520)
    Other Roads Northbound Germansen Landing Road, northbound. Bridge construction between 18 and 20 25 km north of Fort St James. Single lane alternating traffic. Roadway reduced to one lane. Estimated time of re-opening Fri Oct 31 at 5:00 PM PDT. Last updated Sun Sep 14 at 8:34 AM PDT. (DBC-81552)
    Other Roads Schooner Way. Utility work planned between Ketch Rd and Bedwell Harbour Rd. Starting Mon Sep 22 until Tue Nov 4. From 7:00 AM to 7:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Last updated Mon Sep 15 at 9:26 AM PDT. (DBC-81587)
    Other Roads Corner of Highway 19 & 19A near Climbing Gym. Electrical maintenance planned at Tamarac 1 km north of Campbell River. Starting Fri Sep 19 at 8:00 AM PDT until Fri Sep 19 at 12:00 PM PDT. Watch for traffic control personnel. Last updated Mon Sep 15 at 1:07 PM PDT. (DBC-81607)
    Other Roads Both Directions 56th Avenue, in both directions. Construction work planned between 256th Street and Gloucester Way. Starting Wed Oct 1 at 9:00 PM PDT until Sun Nov 30 at 5:30 AM PDT. Lane closures in both directions planned. Watch for traffic control personnel. Last updated Mon Sep 15 at 7:58 PM PDT. (DBC-81621)
    Other Roads Both Directions 52nd Avenue, in both directions. Construction work planned between 264th Street and 2872nd Street. Starting Wed Oct 1 at 9:00 PM PDT until Sun Nov 30 at 5:30 AM PDT. Utility work planned. Watch for traffic control personnel. Last updated Mon Sep 15 at 8:02 PM PDT. (DBC-81622)
    Other Roads Eastbound Golden Ears Way, eastbound. There will be ditching between 179 Street and Golden Ears Way. Starting Mon Oct 6 at 7:00 PM PDT until Sat Oct 11 at 5:00 AM PDT. Right lane will be blocked. Single lane alternating traffic will be in effect. Watch for traffic control personnel. No work on October 10th. Last updated Mon Sep 15 at 8:14 PM PDT. (DBC-81623)
    Other Roads Milligan Creek Rd. Road maintenance work between 257 Rd and Kings Valley Christian Camp. Until Thu Sep 25 at 5:00 PM MST. From 7:00 AM to 5:00 PM MST on weekdays. Single lane alternating traffic. Note: Maintenance may be completed before 25th depending on multiple factors. Please slow down when passing crews and equipment. Last updated Tue Sep 16 at 8:37 AM MST. (DBC-81637)
    Other Roads East Sooke Road. Utility work planned between Silver Spray Dr and Pike Rd. Starting Mon Oct 6 until Sun Oct 12. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic will be in effect. Last updated Tue Sep 16 at 11:45 AM PDT. (DBC-81651)
    Other Roads Tzouhalem Rd. Utility work planned between Maple Bay Rd and Church Rd in Duncan. Starting Mon Sep 22 until Fri Oct 3. From 7:00 AM to 7:00 PM PDT daily. Lane Closure. Last updated Wed Sep 17 at 8:15 AM PDT. (DBC-81685)
    Other Roads Golden Ears Bridge. Bridge maintenance planned at Golden Ears Way. Starting Wed Sep 24 until Sat Sep 27. From 9:00 PM to 6:00 AM PDT daily. Roadway will be reduced to one lane. Watch for traffic control personnel. Last updated Wed Sep 17 at 11:13 AM PDT. (DBC-81699)
    Upper Arrow Lake Ferry Upper Arrow Lake Ferry. Departure delayed between Shelter Bay and Galena Bay. From 8:45 AM to 11:00 AM PST on Wednesday. Departure delayed every Wednesday for fueling purposes. Next update time Wed Dec 31 at 10:00 AM PST. Last updated Tue Jan 7 at 12:16 PM PST. (DBC-71712)
    Usk Ferry Usk Ferry. Ferry is currently out of service between Usk Ferry and the end of Usk Ferry (Usk). Due to low river level. Cable car in service. Last updated Thu Aug 28 at 5:18 PM PDT. (DBC-80996)