Big Bar Reaction Ferry |
Big Bar Reaction Ferry. Travel advisory in effect at Big Bar Reaction Ferry (Big Bar Reaction Ferry). Road closed for the season. The Aerial Car is in operation for foot traffic only. Next update time Fri May 30, 2025. Last updated Tue Nov 19 at 9:13 AM PST. (DBC-70341) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance between Mt Sicker Rd and Fuller Lake Rd for 3.7 km (Chemainus). Lane closures in both directions. Construction speed zone in effect. Southbound bridge closed for repairs. All Traffic diverted onto the adjacent bridge. No overwidth protocols in effect up to 4.4m. Next update time Mon Jan 20, 2025 at 7:00 AM PST. Last updated Fri Nov 29 at 9:22 PM PST. (DBC-70685) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PST on weekdays and Saturday. Blasting. Road closed intermittently. Watch for traffic control. Speed reduction to 60km/hr. Next update time Sun Dec 15 at 10:00 AM PST. Last updated Mon Nov 25 at 10:06 AM PST. (DBC-64961) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between 65 Ave NW and Sandy Point Rd for 1.7 km (Salmon Arm). Until Tue Dec 3 at 1:00 PM PST. Single lane alternating traffic. Watch for traffic control. Next update time Tue Dec 3 at 1:00 PM PST. Last updated Mon Dec 2 at 5:29 PM PST. (DBC-70754) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 9:00 AM to 3:00 PM PST on weekdays and Saturday. Bridge closed. Full closure 9AM-3PM Daily + Saturdays. Alternate route via Hwy 97A (Sicamous) / 97B (Salmon Arm) Single lane alternating traffic from 8PM-6AM PST, expect 20 minute delays. Next update time Fri Dec 6 at 3:00 PM PST. Last updated Fri Nov 29 at 3:03 PM PST. (DBC-70490) |
Highway 17 Both Directions |
Highway 17 (Patricia Bay Highway), in both directions. Construction work at Exit 18: Keating Cross Rd (Central Saanich). Until Tue Jul 1, 2025. Nighttime lane closures both directions. Access to Barbara Drive from Keating Cross Road and access to East Saanich, Martindale and Danica from Highway 17 permanently closed. Keating Cross Road southbound onramp to Highway 17 closed. Next update time Sat May 10, 2025 at 12:00 PM PDT. Last updated Thu Sep 26 at 12:08 PM PDT. (DBC-54341) |
Highway 17 Westbound |
Highway 17, westbound. Bridge construction between Bridgeview Dr and Old Yale Rd for 2.5 km (Surrey). Until Wed Dec 4 at 5:00 AM PST. From 9:00 PM to 5:00 AM PST on Monday and Tuesday. Road closed. Watch for traffic control. Detour via Bridgeview Dr to 120th St. Next update time Wed Dec 4 at 5:00 AM PST. Last updated Mon Dec 2 at 1:00 PM PST. (DBC-70359) |
Highway 37 Both Directions |
Highway 37, in both directions. Travel advisory in effect between Deltaic Cr Bridge and Kluachon Center Access for 185.1 km (26 km south of Bell II to Iskut). Because of rain on compact snow. Travellers are advised to use caution, and should consider alternate plans. Next update time Tue Dec 3 at 12:00 PM PST. Last updated Tue Dec 3 at 9:07 AM PST. (DBC-70765) |
Highway 37A Both Directions |
Highway 37A, in both directions. Travel advisory in effect between Pearly Gates and Surprise Pullout/Windy Chain Up for 33.9 km (12 km east of Stewart to 13 km west of Meziadin). Until Wed Dec 4 at 8:00 AM PST. Highway is currently open, may close for Avalanche Control or High Avalanche Hazard. If closed, hwy may remain closed for extended period of time. Next update time Wed Dec 4 at 8:00 AM PST. Last updated Tue Dec 3 at 5:50 AM PST. (DBC-70703) |
Highway 99 Southbound |
Highway 99, southbound. Vehicle incident at Exit 32: Steveston Hwy (Richmond). Exit ramp is closed. Expect delays. Next update time Tue Dec 3 at 9:30 AM PST. Last updated Tue Dec 3 at 8:16 AM PST. (DBC-70762) |
Kootenay Lake Ferry Both Directions |
Kootenay Lake Ferry, in both directions. Ferry is out of service between Balfour and Kootenay Bay. Schedule modification. Mon-Fri essential service Balfour sailings: 6:30AM, 8:10AM, 4:30PM, Kootenay Bay: 7:10AM, 9AM, 5:20PM. Sat-Sun Balfour sailings: 6:30AM & 9:40PM, Kootenay Bay: 7:10AM & 10:20PM. Essential service travelers board 1st, then general public. Emergency services accommodated. Next update time Wed Dec 4 at 9:00 AM PST. Last updated Mon Dec 2 at 8:08 AM PST. (DBC-69872) |
Nisga'a Hwy Both Directions |
Nisga'a Hwy (Highway 113), in both directions. Flooding between Broad St and Spruce Dr for 28.4 km (Gingolx to Laxgalts'ap). Road closed. Next update time Tue Dec 3 at 12:00 PM PST. Last updated Mon Dec 2 at 10:15 PM PST. (DBC-70757) |
Other Roads |
Kersley-Dale Landing Rd. Landslide at 500 metres in from Highway 97 Intersection. Road closed. A temporary Single Lane Gravel Road for Local Traffic via Arnoldus Road. Next update time Mon Dec 9 at 9:00 AM PDT. Last updated Thu Aug 8 at 9:26 AM PDT. (DBC-23443) |
Other Roads Both Directions |
Durrell Road, in both directions. Landslide at 700m from Highway 97. Road closed. Detour in effect. Detour available via Highway 97 and Dale Lake Road. Next update time Wed Apr 23, 2025 at 2:00 PM PDT. Last updated Wed Oct 23 at 1:06 PM PDT. (DBC-27390) |
Other Roads Both Directions |
Quesnel-Hixon Road, in both directions. Landslide at Cottonwood bridge. Road closed. Next update time Thu Apr 17, 2025 at 2:00 PM PDT. Last updated Wed Oct 23 at 2:46 PM PDT. (DBC-28386) |
Other Roads |
Johnston Bridge. Travel advisory in effect at Front St. In Quesnel. Johnston Bridge. Bridge is open to vehicles with gross vehicle weight rating of 10,000 kilograms or lower. Industrial traffic and heavy commercial traffic must detour via Plywood Rd and Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision. Next update time Wed Apr 8, 2026 at 9:00 AM PDT. Last updated Thu Oct 17 at 6:39 AM PDT. (DBC-47311) |
Other Roads Both Directions |
McKay Road, in both directions. Flooding at McKay Road. Road closed. Next update time Mon Dec 9 at 9:00 AM PDT. Last updated Thu Aug 8 at 9:26 AM PDT. (DBC-53013) |
Other Roads Both Directions |
Canal Rd, in both directions. Construction work at Mt Norman Access Rd. From 10:00 AM to 2:00 PM PST daily. Watch for traffic control. Expect delays. Road closed. Night work will begin on November 13th. Next update time Fri Dec 13 at 10:00 AM PST. Last updated Fri Nov 29 at 11:37 AM PST. (DBC-61149) |
Other Roads Both Directions |
Cave Road, in both directions. Landslide at Quesnel-Hixon Road. Road closed. Landslide on Cave Road. Next update time Tue Apr 1, 2025 at 10:00 AM PDT. Last updated Wed Oct 9 at 10:17 AM PDT. (DBC-67913) |
Other Roads |
Red Bridge. Bridge closed between Athabasca Street and Lorne Street 1 km north of Kamloops. Bridge damaged. Detour in effect. Detour via Highway 5. Next update time Tue Dec 31 at 12:00 PM PDT. Last updated Fri Oct 25 at 7:55 AM PDT. (DBC-68412) |
Other Roads Both Directions |
Pavilion Clinton Rd, in both directions. Travel advisory in effect between Clinton and Lillooet 60 km south of Lillooet. Road closed for the season. Pavilion-Clinton Rd is closed for the Winter. Next update time Fri May 16, 2025 at 10:00 AM PST. Last updated Tue Nov 12 at 9:23 AM PST. (DBC-70161) |
Upper Arrow Lake Ferry Both Directions |
Upper Arrow Lake Ferry, in both directions. There will be required maintenance between Shelter Bay and Galena Bay. Starting Sat Dec 7 at 10:00 PM PST until Sun Dec 8 at 6:00 AM PST. Ferry will be out of service. Last sailing from Shelter Bay will be 9pm. Last sailing from Galena Bay will be 9:30pm. Next update time Sun Dec 8 at 6:00 AM PST. Last updated Mon Nov 25 at 11:18 AM PST. (DBC-70516) |
Atlin Hwy |
Atlin Hwy. Watch for slippery sections between Discovery Ave and Yukon Border for 50.8 km (Atlin to British Columbia and Yukon Border). Compact snow. Last updated Tue Dec 3 at 7:03 AM PST. (DBCRCON-195327) |
Cecil Lake Rd |
Cecil Lake Rd (Highway 103). Compact snow between Rose Prairie Rd and the end of Cecil Lake Rd (Highway 103) for 61.2 km (22 km west of Cecil Lake to British Columbia and Alberta Border). Last updated Tue Dec 3 at 6:51 AM MST. (DBCRCON-195932) |
Hemlock Valley Rd |
Hemlock Valley Rd. Slushy sections between the start of Hemlock Valley Rd and End of Route for 13.8 km (13 km south of Sasquatch Mountain Resort to Sasquatch Mountain Resort). Last updated Mon Dec 2 at 4:13 PM PST. (DBCRCON-195329) |
Highway 1 Both Directions |
Highway 1, in both directions. Utility work at Highway 18. Until Mon Dec 16 at 5:00 PM PST. Left turn lane closed. Right turn lane closed. Expect minor delays. Water main, storm sewer maintenance and road resurfacing. Lane closures in effect until project end. Watch for workers/vehicles on the shoulder. Last updated Sat Nov 30 at 6:07 PM PST. (DBC-68453) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Galloping Goose Trail and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Sat Dec 14 at 5:30 AM PST. From 8:00 PM to 5:30 AM PST on weekdays. Left lane is closed in both directions. Expect delays. Traffic reduced to single lane both directions, with a maximum width of 4m and no change to the maximum height. Speed limit reduced to 50km/h. Last updated Mon Nov 25 at 12:12 PM PST. (DBC-65197) |
Highway 1 Southbound |
Highway 1 (Malahat Highway), southbound. Utility work planned between Mill Bay Rd and Whittaker Rd for 1.7 km (2 to 3 km north of Malahat Summit). Starting Wed Dec 11 at 9:00 AM PST until Wed Dec 11 at 3:00 PM PST. Right lane will be blocked. Work is between Bamberton Rd. And Roth Rd. For BC Hydro Pole replacement. Last updated Fri Nov 22 at 4:01 PM PST. (DBC-70475) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work between Mill Bay Rd and Butterfield Rd for 2.1 km (Mill Bay to 4 km north of Malahat Summit). Until Tue Dec 3 at 2:00 PM PST. Right lane closed. Last updated Fri Nov 22 at 1:47 PM PST. (DBC-70464) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Bridge maintenance between Mt Sicker Rd and Fuller Lake Rd for 3.7 km (Chemainus). Until Sun Dec 15 at 5:00 PM PST. Width limit 4.40 m. Chemainus River Bridge right lane closure. Construction speed zone in effect. Last updated Tue Nov 5 at 4:54 PM PST. (DBC-70003) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between MacMillan Bloedel Haul Rd and Panorama Ridge Rd for 1.0 km (Chemainus). Starting Tue Dec 3 at 10:30 AM PST until Tue Dec 3 at 1:00 PM PST. Right lane will be closed in both directions. Expect minor delays. Watch for traffic control personnel. North and southbound outside lanes affected Highway 1 between Panorama Ridge rd. And River Rd. Watch for work crews. Last updated Sat Nov 30 at 2:52 PM PST. (DBC-70646) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work between Exit 37: Gaglardi Way and King Edward St for 3.2 km (Burnaby to Coquitlam). Until Fri Feb 28, 2025 at 7:00 AM PDT. From 9:30 PM to 7:00 AM PDT daily. Lane Closure. Expect delays. Lane closures are needed to move materials & equipment for the construction of TransLink's North Rd maintenance facility. Last updated Fri Sep 13 at 10:04 PM PDT. (DBC-60503) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Geotechnical investigation between 248 St and Bradner Rd for 7.2 km (Langley - District to Abbotsford). Until Fri Jan 31, 2025 at 5:30 AM PST. From 9:00 PM to 7:30 AM PST on weekends and from 9:00 PM to 5:30 AM PST on weekdays. Centre lane blocked. Right lane is blocked. No closures December 21-January 5. Last updated Thu Nov 28 at 3:27 PM PST. (DBC-69860) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Road maintenance work between 248 St and Bradner Rd for 4.1 km (Langley - District to Abbotsford). Until Fri Jan 31, 2025. From 9:00 PM to 7:30 AM PST on weekends and from 9:00 PM to 5:30 AM PST on weekdays. Left lane is blocked. No work December 21-January 5. Last updated Thu Nov 28 at 3:24 PM PST. (DBC-70620) |
Highway 1 |
Highway 1 (TransCanada Highway). Limited visibility with fog between 248 St and Dyke Crest Rd for 35.4 km (Langley - District to Abbotsford). Fog patches. Last updated Tue Dec 3 at 3:08 AM PST. (DBCRCON-196027) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Exit 73 and Bradner Rd for 1.4 km (Langley - District). Until Fri Dec 20 at 5:00 PM PST. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. Expect delays. Watch for traffic control. Last updated Tue Nov 26 at 10:08 AM PST. (DBC-70551) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Road maintenance work at Exit 73 (Langley - District). Until Fri Jan 31, 2025. From 9:00 PM to 7:00 AM PST on Saturday and from 9:00 PM to 5:00 AM PST on weekdays. No closures December 21-January 5. Last updated Thu Nov 28 at 3:23 PM PST. (DBC-70621) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Exit 83: Mt Lehman Rd and Exit 90: McCallum Rd for 7.2 km (Abbotsford). Until Tue Dec 31. From 8:30 PM to 5:30 AM PST on weekdays. Left lane is closed in both directions. Industrial traffic may slow or block regular traffic. Work ongoing Monday to Friday nights, ending Saturday mornings. Last updated Fri Nov 22 at 4:14 PM PST. (DBC-70355) |
Highway 1 |
Highway 1 (TransCanada Highway). Fog patches between Exit 160: Hunter Creek Rd and Regent St for 35.3 km (1 km west of Hope to Yale). Last updated Sun Dec 1 at 4:47 AM PST. (DBCRCON-195735) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work planned between Exit 160: Hunter Creek Rd and Exit 165: Flood Rd for 4.7 km (Hope). Starting Mon Dec 16 at 8:00 AM PST until Thu Dec 19 at 4:00 PM PST. Right lane will be closed. Speed reduced to 80km/hr. Last updated Mon Dec 2 at 11:18 AM PST. (DBC-70741) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Electrical maintenance between Anderson River Mainline and Thomas Rd for 2.8 km (21 to 24 km north of Yale). Until Fri Dec 6. From 8:00 AM to 4:00 PM PST daily. Lane Closure. Last updated Thu Nov 28 at 12:25 PM PST. (DBC-70240) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Electrical maintenance planned between Anderson River Mainline and Thomas Rd for 1.9 km (22 to 24 km north of Yale). Starting Wed Dec 4 at 9:30 PM PST until Thu Dec 5 at 4:30 AM PST. Right lane will be closed. Watch for traffic control personnel. Last updated Wed Nov 27 at 2:27 PM PST. (DBC-70588) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Gladwin Rd and Nicomen River Rd for 0.1 km (10 km east of Lytton). Until Sun Dec 22 at 7:00 PM PST. Single lane alternating traffic. Expect delays up to 20 minutes. Next update time Fri Dec 6 at 7:00 PM PST. Last updated Fri Nov 29 at 7:06 PM PST. (DBC-69330) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Electrical maintenance between West Kamloops and East Kamloops for 10.6 km (Kamloops). Until Fri Dec 20. From 9:00 AM to 4:00 PM PST on weekdays. Lane Closure. Shoulder closed. Left lane is closed. Centre lane closed. Watch for traffic control and workers on the shoulder. Speed reduced in work zone. Last updated Fri Nov 1 at 2:40 PM PST. (DBC-69739) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work at Notch Hill Rd (18 km west of Tappen). Until Fri Dec 6. From 6:30 AM to 6:30 PM PST on weekdays. Shoulder closed. Single lane alternating traffic. Last updated Thu Nov 14 at 6:08 PM PST. (DBC-70254) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Tappen Valley Rd for 3.2 km (Tappen). Until Tue Dec 31. From 7:00 AM to 4:00 AM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays. Expect up to 30 min delays. Reduced speed through work zone at 80 km/hr during inactive work, 60 km/hr during active work. Intermittent minor stoppages. Last updated Fri Sep 20 at 3:51 PM PDT. (DBC-57219) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW (1 km west of Salmon Arm). Until Tue Dec 31. Single lane alternating traffic. Watch for traffic control. Up to one 20 minute closure and one 30 minute closure daily. 5 minute closures may be required intermittently. 2 blasts between 7:00am and 4:00am. Last updated Thu Nov 28 at 6:56 PM PST. (DBC-57687) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work between Camp Creek Rd and Three Valley Siding Rd for 4.8 km (25 to 20 km west of Revelstoke). Until Fri Dec 6. From 10:00 AM to 3:00 PM PST on weekdays. Right lane closed. Speed reduced to 60 km/h in work zone. Last updated Mon Nov 18 at 11:45 AM PST. (DBC-70327) |
Highway 1 |
Highway 1 (TransCanada Highway). Road maintenance work between Summit Lake OH Bridge and Clanwilliam OH Bridge for 1.9 km (10 to 9 km west of Revelstoke). Until Tue Dec 3 at 2:00 PM PST. Single lane alternating traffic. Watch for traffic control. Last updated Mon Dec 2 at 12:42 PM PST. (DBC-70746) |
Highway 1 |
Highway 1 (TransCanada Highway). Limited visibility with fog between Victoria Rd W and Glacier National Park West Boundary for 48.1 km (Revelstoke to 1 km east of West Boundary of Glacier National Park). Watch for slippery sections. Last updated Tue Dec 3 at 7:47 AM PST. (DBCRCON-195881) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work planned at Oak Dr (Revelstoke). Starting Wed Dec 4 until Thu Dec 5. From 7:00 AM to 5:00 PM PST on Wednesday and Thursday. Single lane alternating traffic will be in effect. Speed reduction to 70 km/h. Last updated Fri Nov 29 at 1:32 PM PST. (DBC-70661) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road maintenance work planned between Albert Canyon Chain Up Area and Albert Canyon Rd for 0.5 km (3 km east of East Boundary of Mount Revelstoke National Park). Starting Tue Dec 3 at 11:00 AM PST until Tue Dec 3 at 4:00 PM PST. Single lane alternating traffic will be in effect. Environmental assessment and clean up. Speed limit reduced from 100km/hr to 70km/hr. Last updated Fri Nov 29 at 3:07 PM PST. (DBC-70663) |
Highway 1 |
Highway 1 (TransCanada Highway). Watch for slippery sections between Glacier National Park West Boundary and Quartz Creek Bridge (Structure) for 57.1 km (1 km east of West Boundary of Glacier National Park to 14 km east of East Boundary of Glacier National Park). Last updated Tue Dec 3 at 7:47 AM PST. (DBCRCON-196009) |
Highway 1 |
Highway 1 (TransCanada Highway). Tree pruning between Redgrave Rest Area and Wiseman Rd for 13.7 km (16 km east of East Boundary of Glacier National Park to 25 km west of Golden). Until Tue Dec 3 at 5:00 PM MST. Right lane is closed in both directions. Watch for traffic control. Expect minor delays. Last updated Mon Dec 2 at 6:26 PM MST. (DBC-70753) |
Highway 1 Both Directions |
Highway 1 (Kicking Horse Pass), in both directions. Watch for falling rocks between Golden Donald Upper Rd and Yoho Bridge (5 km east of Golden). Last updated Wed Nov 27 at 3:07 AM MST. (DBC-44269) |
Highway 10 Both Directions |
Highway 10, in both directions. Road construction work between 70th Ave and 75 Ave 1 km north of Langley - City. Until Thu Dec 19. From 8:00 PM to 5:00 AM PDT daily. Last updated Wed Sep 4 at 4:12 PM PDT. (DBC-67896) |
Highway 10 Both Directions |
Highway 10, in both directions. Utility work between Mufford Cres and Smith Cres for 2.5 km (Langley - District). Until Fri Dec 13. From 9:00 AM to 3:00 PM PST daily. Right turn lane closed. Shoulder closed. Watch for traffic control. Expect delays. Last updated Wed Nov 27 at 4:21 PM PST. (DBC-70589) |
Highway 10 |
Highway 10. Construction work at Worrell Cres (Langley - District). Until Thu Dec 19 at 5:00 PM PDT. Work is between 70th Ave. And 75th Ave. Last updated Mon Aug 19 at 8:47 AM PDT. (DBC-67327) |
Highway 10 Both Directions |
Highway 10, in both directions. Road construction work between 232 St and the end of Highway 10 for 0.5 km (Langley - District). Until Fri Feb 28, 2025. From 8:00 AM to 4:00 PM PST daily. Right lane closed. Expect delays. Last updated Wed Nov 13 at 1:19 PM PST. (DBC-70210) |
Highway 101 Both Directions |
Highway 101, in both directions. Road construction work at Monkey Tree Lane (Sechelt). Until Sun Dec 15. From 7:00 AM to 7:00 PM PST on weekdays. Shoulder closed. Right lane closed. For highway widening works as part of the Selma Park Subdivision entrance works. Intermittent lane closures. Last updated Tue Nov 12 at 9:23 AM PST. (DBC-70160) |
Highway 11 |
Highway 11. Limited visibility with fog between the start of Highway 11 and Cedar Valley Conn for 17.1 km. Fog patches. Last updated Tue Dec 3 at 3:08 AM PST. (DBCRCON-196028) |
Highway 11 Both Directions |
Highway 11, in both directions. Paving operations planned at McCallum Rd (Abbotsford). Starting Tue Dec 3 at 8:00 PM PST until Wed Dec 4 at 6:00 AM PST. Lane closures in both directions planned. Last updated Fri Nov 29 at 5:35 PM PST. (DBC-70676) |
Highway 11 Both Directions |
Highway 11, in both directions. Paving operations planned at McCallum Rd (Abbotsford). Starting Wed Dec 4 at 9:00 AM PST until Thu Dec 5 at 6:00 AM PST. Lane closures in both directions planned. Last updated Fri Nov 29 at 5:39 PM PST. (DBC-70678) |
Highway 11 Both Directions |
Highway 11, in both directions. Paving operations between McCallum Rd and Bateman Rd for 1.0 km (Abbotsford). Until Wed Dec 4 at 6:00 AM PST. Lane closures in both directions in effect. Last updated Mon Dec 2 at 1:26 PM PST. (DBC-70748) |
Highway 11 |
Highway 11. Paving operations between Valley Rd and Bateman Rd for 0.6 km (Abbotsford). Until Sat Dec 14 at 3:00 AM PST. Watch for traffic control. Last updated Tue Nov 26 at 10:02 AM PST. (DBC-70550) |
Highway 11 Southbound |
Highway 11, southbound. Road construction work at Townshipline Rd (Abbotsford). Until Tue Dec 31. Right turn lane closed. Last updated Tue Oct 8 at 2:26 PM PST. (DBC-69040) |
Highway 11 Both Directions |
Highway 11, in both directions. Road construction work between Abbotsford-Mission Bridge and Cedar Valley Conn for 0.6 km (Mission). Until Sat Dec 14. From 9:00 PM to 5:30 AM PST daily. Left turn lane closed. Lane Closure. Shoulder closed. Construction also effecting Highway 7 from Hurd to Haig street. Construction is weather-permitting. Saturday work until 6:30 AM. Last updated Tue Nov 26 at 10:26 AM PST. (DBC-70552) |
Highway 118 |
Highway 118. Watch for slippery sections between Highway 16 and Babine Lake for 48.9 km (Topley to Granisle). Compact snow. Last updated Tue Dec 3 at 7:00 AM PST. (DBCRCON-195335) |
Highway 12 |
Highway 12. Compact snow between Six Mile Rd and the end of Highway 12 for 33.7 km (27 km north of Lytton to Lillooet). Last updated Tue Dec 3 at 7:40 AM PST. (DBCRCON-196081) |
Highway 12 |
Highway 12. Utility work between Fraser Cres and Sumner Rd for 3.9 km (Lillooet). Until Fri Dec 6 at 4:00 PM PST. From 8:00 AM to 4:00 PM PST on weekdays and Saturday. Single lane alternating traffic. Please watch for signs and personnel. Last updated Wed Nov 13 at 11:12 AM PST. (DBC-68657) |
Highway 13 Both Directions |
Highway 13, in both directions. Utility work between Fraser Highway and 28th Avenue. Until Fri Dec 6 at 5:00 AM PST. Underground and aerial placing, splicing and testing. Last updated Fri Nov 29 at 6:46 PM PST. (DBC-70682) |
Highway 13 Both Directions |
Highway 13, in both directions. Utility work between 16 Ave and 28 Ave for 0.9 km (Langley - District). Until Fri Dec 6 at 3:00 PM PST. Underground and Aerial spacing, splicing and testing. Last updated Fri Nov 29 at 6:49 PM PST. (DBC-70680) |
Highway 14 Southbound |
Highway 14, southbound. Paving operations planned at Brickshire Drive. Starting Thu Dec 5 until Fri Dec 6. From 7:00 AM to 4:00 PM PST on Thursday and Friday. Shoulder will be closed. Exit ramp will be closed. Brickshire exit will be closed with traffic control. Last updated Thu Nov 28 at 12:15 PM PST. (DBC-70614) |
Highway 14 |
Highway 14. Road maintenance work between Deering Rd and Petrel Dr for 36.5 km (Port Renfrew to 1 km west of Jordan River). Watch for loose gravel and traffic pattern changes. Last updated Wed Oct 23 at 6:33 PM PDT. (DBC-69530) |
Highway 14 Westbound |
Highway 14, westbound. Utility work between Maple Ave S and Croce Rd for 1.4 km (Sooke). Until Tue Dec 31 at 6:00 AM PST. From 7:00 PM to 6:00 AM PST daily. Right turn lane closed. Shoulder maintenance. Single lane alternating traffic. Last updated Fri Nov 22 at 12:02 PM PST. (DBC-67026) |
Highway 14 Westbound |
Highway 14, westbound. Utility work planned between Luxton Rd and Loledo Pl for 0.5 km (Langford). Starting Wed Dec 11 at 9:00 AM PST until Wed Dec 11 at 2:00 PM PST. Lane Closure. Last updated Thu Nov 28 at 10:06 AM PST. (DBC-70610) |
Highway 15 Both Directions |
Highway 15, in both directions. Utility work between 76th Avenue and 73rd Avenue. Until Mon Dec 9. From 8:00 PM to 5:00 AM PST daily. Lane Closure. For pole relocation. Northbound right lane and southbound left turn lane will be closed. Last updated Wed Nov 6 at 12:42 PM PST. (DBC-70026) |
Highway 15 Southbound |
Highway 15 (Pacific Highway), southbound. Industrial traffic may slow or block regular traffic. Between 48 Ave and 40 Ave for 1.7 km (Surrey). Until Tue Dec 31 at 5:00 PM PST. From 8:00 AM to 5:00 PM PST daily. Last updated Tue Nov 12 at 8:06 AM PST. (DBC-70156) |
Highway 15 Northbound |
Highway 15 (Pacific Highway), northbound. Shoulder maintenance between 58 Ave and 60 Ave for 0.4 km (Surrey). Until Fri Dec 20. From 9:30 AM to 2:30 PM PST on weekdays. Right lane is blocked. No work during winter maintenance. Last updated Wed Nov 13 at 3:14 PM PST. (DBC-70215) |
Highway 15 Both Directions |
Highway 15 (Pacific Highway), in both directions. Utility work between 68A Ave and 80 Ave for 1.7 km (Surrey). Until Mon Dec 23. From 9:00 AM to 2:00 PM PST daily. Lane Closure. No work during winter maintenance. Last updated Wed Nov 27 at 3:18 PM PST. (DBC-70274) |
Highway 15 |
Highway 15 (Pacific Highway). Construction work between Fraser Hwy and 80 Ave for 1.1 km (Surrey). Until Mon Dec 9. From 8:00 PM to 5:00 AM PST daily. Lane closures in both directions in effect. No work during winter maintenance activities. Last updated Tue Nov 19 at 6:21 PM PST. (DBC-70366) |
Highway 16 |
Highway 16 (on Haida Gwaii). Utility work between Hodges Ave and E Cedar Ave for 40.8 km (Port Clements to Masset). Until Fri Dec 13. From 8:30 AM to 4:00 PM PST daily. Single lane alternating traffic. Watch for traffic control. Last updated Fri Nov 8 at 3:59 PM PST. (DBC-70117) |
Highway 16 |
Highway 16 (Yellowhead Highway). Water pooling between Prince Rupert Ferry Terminal and Maintenance Boundary SA27 for 71.3 km (Prince Rupert). Last updated Tue Dec 3 at 6:49 AM PST. (DBCRCON-195429) |
Highway 16 |
Highway 16 (Yellowhead Highway). Fog patches between Telegraph Rest Area and Maintenance Boundary SA25 for 126.9 km (63 km east of Prince Rupert to 24 km west of Cedarvale). Slushy with slippery sections. Last updated Tue Dec 3 at 6:56 AM PST. (DBCRCON-195893) |
Highway 16 |
Highway 16 (Yellowhead Highway). Watch for slippery sections between Maintenance Boundary SA25 and Moricetown Overhead Bridge for 118.9 km (24 km west of Cedarvale to 1 km west of Witset (Moricetown)). Compact snow. Last updated Tue Dec 3 at 6:39 AM PST. (DBCRCON-195994) |
Highway 16 |
Highway 16 (Yellowhead Highway). Watch for slippery sections between Station Rd W and Wakefield Rd for 67.3 km (1 km west of Witset (Moricetown) to 16 km east of Telkwa). Last updated Tue Dec 3 at 6:39 AM PST. (DBCRCON-196074) |
Highway 16 Eastbound |
Highway 16 (Yellowhead Highway), eastbound. Vehicle incident between Owens Rd and Raceway Rd for 4.3 km (8 to 12 km west of Smithers). Road cleared. Last updated Mon Dec 2 at 12:48 PM PST. (DBC-70743) |
Highway 16 |
Highway 16 (Yellowhead Highway). Watch for slippery sections between Wakefield Rd and 6 Mile Hill Brakecheck for 70.7 km (16 km east of Telkwa to 9 km east of Topley). Freezing rain. Last updated Tue Dec 3 at 7:26 AM PST. (DBCRCON-196078) |
Highway 16 |
Highway 16 (Yellowhead Highway). Watch for slippery sections between 6 Mile Hill Brakecheck and SA24/23 Maintenance Boundary for 73.7 km (9 km east of Topley to Priestly Hill). Heavy rain. Last updated Tue Dec 3 at 8:05 AM PST. (DBCRCON-196085) |
Highway 16 |
Highway 16 (Yellowhead Highway). Watch for slippery sections between SA24/23 Maintenance Boundary and Burrard Ave for 95.0 km (Priestly Hill to Vanderhoof). Last updated Tue Dec 3 at 6:50 AM PST. (DBCRCON-196077) |
Highway 16 |
Highway 16 (Yellowhead Highway). Travel advisory in effect between Priestly Station Rd and Irwin Rd for 61.4 km (Fort Fraser to 2 km west of Priestly Hill). Freezing rain. Last updated Tue Dec 3 at 8:09 AM PST. (DBC-70764) |
Highway 16 Westbound |
Highway 16 (Yellowhead Highway), westbound. Utility work between Pine Ave and Thackery Rd for 1.1 km (Vanderhoof). Until Thu Jan 16, 2025 at 4:00 PM PST. Lane Closure. Watch for traffic control. Last updated Thu Dec 21, 2023 at 8:15 AM PST. (DBC-59181) |
Highway 16 |
Highway 16 (Yellowhead Highway). Watch for slippery sections between Lloyd Dr and Loos Rd for 213.4 km (1 km west of Bednesti Norman to 49 km west of McBride). Last updated Tue Dec 3 at 6:47 AM PST. (DBCRCON-196048) |
Highway 19 Both Directions |
Highway 19 (Island Highway), in both directions. Utility work between Fort Rupert Rd and E Main Rd for 30.3 km (Port Hardy to 6 km south of Port McNeill). Until Fri Jan 31, 2025 at 3:00 PM PST. Single lane alternating traffic. Tree pruning. Last updated Mon Dec 2 at 10:49 AM PST. (DBC-70739) |
Highway 19 |
Highway 19 (Island Highway). Utility work planned between Big Tree Creek Rest Area and Big Tree Main for 1.0 km (33 to 34 km north of Campbell River). Starting Wed Dec 11 at 9:00 AM PST until Wed Dec 11 at 3:00 PM PST. Single lane alternating traffic will be in effect. Last updated Thu Nov 28 at 12:15 PM PST. (DBC-70616) |
Highway 19 Both Directions |
Highway 19 (Island Highway), in both directions. Utility work planned between Meredith Rd and Park Rd for 0.8 km (Campbell River). Starting Mon Dec 9 at 9:00 AM PST until Fri Dec 13 at 3:00 PM PST. Single lane alternating traffic will be in effect. Last updated Tue Nov 26 at 3:31 PM PST. (DBC-70556) |
Highway 19 Southbound |
Highway 19 (Inland Island Highway), southbound. Maintenance between Piercy Rd and Comox Valley Pky for 9.4 km (Cumberland). Until Fri Dec 6 at 4:30 PM PST. From 7:30 AM to 4:30 PM PST on weekdays. Right lane closed. Watch for traffic control. Speed limit 60 km/h. Last updated Mon Dec 2 at 5:12 AM PST. (DBC-70718) |
Highway 19A Southbound |
Highway 19A (Island Highway), southbound. Road construction work between Plummer Rd and Resort Way for 1.0 km (Parksville). Until Thu Dec 5 at 2:00 PM PST. Single lane alternating traffic. Possible delays. Watch for traffic control. Road widening and Island work - South Bound Single Lane Alternating traffic. Watch for work crews and Traffic Control Personnel. Last updated Wed Nov 27 at 11:59 AM PST. (DBC-70581) |
Highway 19A Northbound |
Highway 19A (Island Highway), northbound. Utility work planned between Barton Rd and Hobbs Rd for 0.4 km (3 km north of Qualicum Beach). Starting Wed Dec 4 at 9:00 AM PST until Wed Dec 4 at 3:00 PM PST. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. NB single lane alternating traffic between Barton Rd and Hobbs Rd. Last updated Fri Nov 29 at 8:46 PM PST. (DBC-70554) |
Highway 2 |
Highway 2. Watch for slippery sections between the start of Highway 2 and the end of Highway 2 for 41.5 km (British Columbia and Alberta Border to Dawson Creek). Last updated Tue Dec 3 at 6:54 AM MST. (DBCRCON-196056) |
Highway 20 |
Highway 20. Watch for slippery sections between Olsen Dr and Kappan Mtn Rd for 118.3 km (16 km east of Bella Coola to Anahim Lake). Compact snow. Last updated Tue Dec 3 at 5:09 AM PST. (DBCRCON-196051) |
Highway 20 Both Directions |
Highway 20, in both directions. Road maintenance work between Fisheries Pool Campground Access Rd and Rainbow Range Trailhead for 36.3 km (17 km east of Firvale to 39 km west of Anahim Lake). Until Wed May 7, 2025. From 7:00 AM to 3:30 PM PDT on weekdays. Single lane alternating traffic. Last updated Tue May 28 at 6:06 PM PDT. (DBC-64459) |
Highway 20 |
Highway 20. Watch for slippery sections between Graham Lake Access No 2 Rd and Stum Lake Rd for 109.3 km (Tatla Lake to Alexis Creek). Compact snow. Last updated Tue Dec 3 at 5:09 AM PST. (DBCRCON-196052) |
Highway 20 |
Highway 20. Utility work between Stack Valley Rd and Tlesc'ox'eten Rd for 2.9 km (43 to 40 km west of Williams Lake). Until Sat Nov 30. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Expect minor delays. Please watch for signage and personnel. Last updated Tue Oct 29 at 3:52 PM PDT. (DBC-69721) |
Highway 22 |
Highway 22. Watch for slippery sections between US Border and Warfield Hill Rd for 20.2 km (BC and WA Border, South of Rossland to Trail). Compact snow. Last updated Tue Dec 3 at 6:28 AM PST. (DBCRCON-196065) |
Highway 23 |
Highway 23. Compact snow between Junction Highway 1 and Mica Dam for 150.1 km (Revelstoke to 5 km north of Mica Dam). Slushy with slippery sections. Last updated Tue Dec 3 at 7:47 AM PST. (DBCRCON-195869) |
Highway 24 |
Highway 24. Watch for slippery sections between Lone Butte Horse Lake Rd and Eagle Island Rd for 50.0 km (Lone Butte to 34 km west of Little Fort). Last updated Tue Dec 3 at 7:38 AM PST. (DBCRCON-196080) |
Highway 24 |
Highway 24. Watch for slippery sections between Cottage Lane and Junction Hwy 5 for 36.3 km (Little Fort). Fog patches. Last updated Tue Dec 3 at 6:46 AM PST. (DBCRCON-195992) |
Highway 29 |
Highway 29. Watch for slippery sections between the start of Highway 29 and the end of Highway 29 for 235.9 km (Tumbler Ridge to 73 km north of Hudson's Hope). Compact snow. Last updated Tue Dec 3 at 7:02 AM MST. (DBCRCON-195882) |
Highway 29 |
Highway 29. Utility work between Chetwynd Dump Rd and Moberly Lake Rd for 11.6 km (5 to 17 km north of Chetwynd). Until Wed Dec 4. From 8:30 AM to 6:00 PM MST on weekdays. Single lane alternating traffic. Watch for traffic control. Last updated Tue Nov 12 at 11:35 AM MST. (DBC-70166) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Utility work between Exit 173: Old Hope Princeton Way and First Avalanche Gate for 4.0 km (Hope). Until Fri Dec 6. From 8:00 AM to 4:00 PM PST on weekdays. Right lane closed. Last updated Thu Nov 21 at 9:45 AM PST. (DBC-70425) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Utility work planned between Exit 177 and Sunshine Valley for 8.5 km (5 to 13 km east of Hope). Starting Wed Dec 11 at 8:00 AM PST until Wed Dec 11 at 5:00 PM PST. Right lane will be closed. Hydro crews will be working between Mt. Hope FSR and the Hope Slide Rest Area. 80 km/h speed limit will be in effect. Last updated Fri Nov 29 at 4:27 PM PST. (DBC-70673) |
Highway 3 |
Highway 3 (Crowsnest Highway). Fog patches between First Avalanche Gate and Sunday Summit for 78.6 km (17 km east of Hope to 32 km west of Princeton). Last updated Mon Dec 2 at 1:00 AM PST. (DBCRCON-195875) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Maintenance between Sunshine Valley and Manning Park Resort for 46.2 km (17 to 64 km east of Hope). Until Fri Dec 13 at 7:00 PM PST. Right lane is blocked. Shoulder closed. Work is between Rhododendron Flats and Cayuse Flats. Last updated Tue Nov 5 at 2:40 PM PST. (DBC-69992) |
Highway 3 |
Highway 3 (Crowsnest Highway). Construction work between Allison Pass Summit and Manning Park Resort for 9.3 km (54 to 64 km east of Hope). Until Tue Dec 3 at 3:00 PM PST. Right lane closed. Last updated Tue Dec 3 at 6:00 AM PST. (DBC-70761) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Utility work at Manning Park Resort (64 km east of Hope). Until Sat Dec 14. From 6:00 AM to 7:00 PM PST on weekdays. Right lane closed. Watch for traffic control. Work will be taking place between Cayuse Flats and Rhododendron Flats. Last updated Wed Nov 13 at 3:36 PM PST. (DBC-70216) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for slippery sections between Garret Rd and Kennedy Lake Rd for 12.2 km (32 to 20 km west of Princeton). Last updated Tue Dec 3 at 6:20 AM PST. (DBCRCON-196062) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for slippery sections between Vermilion Ave and Daly Ave for 37.6 km (Princeton to Hedley). Last updated Tue Dec 3 at 6:20 AM PST. (DBCRCON-196063) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Special event planned between 5th St and 7th Ave for 0.2 km (Keremeos). Starting Mon Dec 9 at 6:00 PM PST until Mon Dec 9 at 6:45 PM PST. All lanes will be blocked. Keremeos Light up parade. In between 5th and 9th street. Last updated Fri Nov 29 at 9:28 AM PST. (DBC-70645) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Utility work between Becks Rd and Daly Dr for 1.3 km (2 to 3 km east of Keremeos). Until Fri Dec 6 at 5:00 PM PDT. Lane Closure. Last updated Tue Oct 22 at 10:15 AM PDT. (DBC-69478) |
Highway 3 |
Highway 3 (Crowsnest Highway). Bridge maintenance between Kingfisher Dr and Harbour Key Dr (Osoyoos). Until Fri Dec 20. From 6:00 AM to 6:00 PM PST on weekdays and Saturday. Single lane alternating traffic. Last updated Fri Nov 15 at 11:24 AM PST. (DBC-70270) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for slippery sections between 68th Ave and Mannix Rd for 39.8 km (Christina Lake to 24 km west of Castlegar). Last updated Tue Dec 3 at 6:31 AM PST. (DBCRCON-196070) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for slippery sections between Junction Hwy 22 and Meadows Rd for 27.8 km (Castlegar to 10 km west of Salmo). Compact snow. Last updated Tue Dec 3 at 6:28 AM PST. (DBCRCON-196067) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for slippery sections between Tailings Rd and Cook St for 68.9 km (14 km east of Salmo to Creston). Last updated Tue Dec 3 at 5:47 AM PST. (DBCRCON-196072) |
Highway 3 |
Highway 3 (Crowsnest Highway). Winter driving conditions between Sunrise Rd and 9th Ave S for 31.8 km (Moyie to Cranbrook). Watch for slippery sections. Last updated Tue Dec 3 at 8:36 AM MST. (DBCRCON-196079) |
Highway 3 |
Highway 3 (Crowsnest Highway). Winter driving conditions between Michel Mouth Bridge and BC/AB Border for 17.8 km (Sparwood to British Columbia and Alberta Border). Watch for slippery sections. Last updated Tue Dec 3 at 3:56 AM MST. (DBCRCON-196025) |
Highway 30 |
Highway 30. Utility work between South Hardy Mainline and Beaver Lake Forest Trail for 1.1 km (20 to 21 km north of Port Alice). Until Thu Dec 19. Drilling & Geophysical Surveying in various locations. Single Lane Alternating Traffic. Last updated Thu Nov 7 at 12:11 PM PST. (DBC-70071) |
Highway 31 |
Highway 31. Watch for slippery sections between Balfour and Block Rd for 75.9 km (Balfour to Meadow Creek). Last updated Tue Dec 3 at 6:36 AM PST. (DBCRCON-196041) |
Highway 31 |
Highway 31. Watch for slippery sections between Block Rd and Junction Hwy 23 for 98.8 km (Meadow Creek to 30 km north of Trout Lake). Compact snow. Last updated Tue Dec 3 at 6:36 AM PST. (DBCRCON-196055) |
Highway 31A |
Highway 31A. Watch for slippery sections between Retallak and Junction Hwy 31 for 27.0 km (19 km east of New Denver to Kaslo). Compact snow. Last updated Tue Dec 3 at 6:36 AM PST. (DBCRCON-195863) |
Highway 33 |
Highway 33. Watch for slippery sections between Christian Valley Rd and McCulloch Rd for 76.2 km (Westbridge to 30 km south of Kelowna). Last updated Tue Dec 3 at 6:31 AM PST. (DBCRCON-196071) |
Highway 35 |
Highway 35. Watch for slippery sections between the start of Highway 35 and the end of Highway 35 for 23.4 km (Northbank to Burns Lake). Heavy rain. Last updated Tue Dec 3 at 8:05 AM PST. (DBCRCON-196086) |
Highway 37 |
Highway 37. Fog patches between Nalabila Blvd and Terrace for 57.8 km (Kitimat). Slushy with slippery sections. Last updated Tue Dec 3 at 6:56 AM PST. (DBCRCON-195382) |
Highway 37 |
Highway 37. Watch for slippery sections between Kitwanga and Cranberry Bridge #2 for 76.5 km (Kitwanga). Compact snow. Last updated Tue Dec 3 at 6:40 AM PST. (DBCRCON-195995) |
Highway 37 |
Highway 37. Compact snow between Cranberry Bridge #2 and Deltaic Cr Bridge for 144.6 km (70 km north of Kitwanga to 26 km south of Bell II). Slushy with slippery sections. Last updated Tue Dec 3 at 6:40 AM PST. (DBCRCON-196039) |
Highway 37 |
Highway 37. Bridge maintenance between Hanna North Bridge and Deltaic Cr Bridge for 56.9 km (7 km north of Meziadin to 26 km south of Bell II). Until Thu Dec 5 at 4:00 PM PST. From 7:00 AM to 4:00 PM PST on Monday and Tuesday. Single lane alternating traffic. Expect minor delays. Last updated Tue Dec 3 at 6:56 AM PST. (DBC-70667) |
Highway 37 |
Highway 37. Watch for slippery sections between Deltaic Cr Bridge and Tatogga Lake Resort for 169.5 km (26 km south of Bell II to Tatogga). Compact snow. Freezing rain. Last updated Tue Dec 3 at 8:55 AM PST. (DBCRCON-196087) |
Highway 37 |
Highway 37. Watch for slippery sections between Tatogga Lake Resort and the end of Highway 37 for 329.8 km (Tatogga to British Columbia and Yukon Border). Compact snow. Last updated Tue Dec 3 at 7:04 AM PST. (DBCRCON-196088) |
Highway 37 |
Highway 37. Stalled vehicle between French Creek Bridge and Blue River Bridge (39 km south of British Columbia and Yukon Border). Northbound lane closure. Single lane alternating traffic. Next update time Tue Dec 3 at 11:00 AM PST. Last updated Tue Dec 3 at 8:51 AM PST. (DBC-70726) |
Highway 37A |
Highway 37A. Compact snow between Hyder and Highway 37 Junction for 64.9 km (British Columbia and Alaska Border to Meziadin). Slushy with slippery sections. Last updated Tue Dec 3 at 6:40 AM PST. (DBCRCON-195998) |
Highway 39 |
Highway 39. Watch for slippery sections between the start of Highway 39 and McIntyre Dr for 29.9 km (Mackenzie Junction to Mackenzie). Compact snow. Last updated Tue Dec 3 at 6:46 AM PST. (DBCRCON-195383) |
Highway 3A Both Directions |
Highway 3A, in both directions. Geotechnical investigation planned between Kuskonook Rest Area and Bathie Rd (5 km south of Kuskonook). Starting Tue Dec 17 until Thu Dec 19. From 7:00 AM to 7:00 PM PST on Tuesday, Wednesday and Thursday. Single lane alternating traffic will be in effect. Watch for traffic control personnel. At Imasco Corner for Borehole drilling. Last updated Mon Nov 25 at 12:37 PM PST. (DBC-70076) |
Highway 3B |
Highway 3B. Watch for slippery sections between Highway 22 Jct W and Highway 3 Jct W for 28.2 km (Rossland to 8 km north of Nancy Greene Summit). Compact snow. Last updated Tue Dec 3 at 6:28 AM PST. (DBCRCON-195719) |
Highway 3B |
Highway 3B. Watch for slippery sections between Highway 22 Jct E and Highway 3 Jct E for 30.5 km (Trail to 14 km east of Fruitvale). Compact snow. Last updated Tue Dec 3 at 6:28 AM PST. (DBCRCON-196016) |
Highway 4 Both Directions |
Highway 4, in both directions. Maintenance between Port Alberni Summit and Chalet Rd for 9.5 km (Cathedral Grove). Vehicles/loads over 3.2m in width must contact Permit Centre for instructions at 1-800-559-9688. Next update time Wed Jan 1, 2025 at 10:00 AM PDT. Last updated Mon Oct 28 at 9:48 AM PDT. (DBC-52953) |
Highway 49 |
Highway 49. Watch for slippery sections between the start of Highway 49 and the end of Highway 49 for 15.2 km (Dawson Creek to British Columbia and Alberta Border). Last updated Tue Dec 3 at 6:55 AM MST. (DBCRCON-196058) |
Highway 5 Both Directions |
Highway 5 (Coquihalla South), in both directions. Maintenance between Exit 183: Othello Rd and Exit 192 for 9.0 km (6 to 15 km north of Hope). Until Tue Dec 31 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Lane Closure. Watch for traffic control. Last updated Thu Sep 5 at 10:23 AM PDT. (DBC-67924) |
Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Road maintenance work between Exit 183: Othello Rd and Exit 192 for 9.0 km (6 to 15 km north of Hope). Until Fri Dec 6 at 4:00 PM PST. Right lane is blocked. Last updated Thu Nov 7 at 9:21 AM PST. (DBC-70061) |
Highway 5 Southbound |
Highway 5 (Coquihalla South), southbound. Utility work between Exit 192 and Exit 183: Othello Rd for 2.7 km (9 to 6 km north of Hope). Until Mon Dec 30 at 4:00 PM PST. Right lane closed. Last updated Tue Nov 26 at 9:56 AM PST. (DBC-70549) |
Highway 5 Both Directions |
Highway 5, in both directions. Utility work planned between Louis Creek Rd and Agate Bay Rd for 0.6 km (Barriere). Starting Wed Dec 4 at 8:00 AM PST until Wed Dec 4 at 4:00 PM PST. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Mon Dec 2 at 7:42 AM PST. (DBC-70722) |
Highway 5 |
Highway 5. Limited visibility with fog between Church St and McMurphy Pullout; SA Boundary for 79.0 km (Little Fort to 18 km south of Avola). Last updated Tue Dec 3 at 6:46 AM PST. (DBCRCON-196075) |
Highway 5 Both Directions |
Highway 5, in both directions. Utility work between Burman Rd and Harmon Rd for 12.8 km (1 km north of Clearwater to Vavenby). Until Fri Dec 6. From 8:00 AM to 4:00 PM PST daily. Shoulder closed. Watch for traffic control. Last updated Wed Nov 27 at 1:46 PM PST. (DBC-70586) |
Highway 5 Southbound |
Highway 5, southbound. Utility work between Holland Rd and Lost Creek Rd for 3.8 km (3 to 7 km north of Clearwater). Until Tue Dec 31. From 7:00 AM to 5:00 PM PST daily. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Tue Nov 5 at 10:52 AM PST. (DBC-69976) |
Highway 52 E |
Highway 52 E. Watch for slippery sections between Highway 2 and Stone Creek Rd for 65.0 km (144 to 79 km east of Tumbler Ridge). Last updated Tue Dec 3 at 6:56 AM MST. (DBCRCON-196059) |
Highway 52 E |
Highway 52 E. Watch for slippery sections between Kelly Lake Rd and the end of Highway 52 E for 79.4 km (Tumbler Ridge). Compact snow. Last updated Tue Dec 3 at 7:02 AM MST. (DBCRCON-195978) |
Highway 52 N |
Highway 52 N (Heritage Highway). Watch for slippery sections between the start of Highway 52 N (Heritage Highway) and the end of Highway 52 N (Heritage Highway) for 98.5 km (Tumbler Ridge). Compact snow. Last updated Tue Dec 3 at 7:02 AM MST. (DBCRCON-196033) |
Highway 5A |
Highway 5A. Watch for falling rocks between the start of Highway 5A and Gulliford Lake Rest Area for 37.5 km (2 km south of Gulliford Lake Rest Area to Princeton). Last updated Tue Dec 3 at 3:08 AM PST. (DBC-58676) |
Highway 6 EW |
Highway 6 EW. Watch for slippery sections between North Fork Rd and Needles Ferry for 82.3 km (Cherryville to Needles). Last updated Tue Dec 3 at 6:36 AM PST. (DBCRCON-196064) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Construction work between Carr St and 218 St (Maple Ridge). Until Mon Dec 30 at 4:00 PM PDT. From 9:00 AM to 4:00 PM PDT on weekdays. Expect intermittent right lane closures as crews work on a residential structure. Last updated Fri Oct 18 at 4:14 PM PDT. (DBC-69370) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between 266 St and 272 St for 0.5 km (Maple Ridge). Until Sat Dec 7. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. Watch for traffic control. Expect delays. Work will be taking place November 12-16 / November 18-23 / November 25-30 / December 2-7. Last updated Tue Nov 12 at 5:01 PM PST. (DBC-67049) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Construction work between Horne St and James St for 0.2 km (Mission). Until Fri Dec 6 at 3:00 PM PST. Right lane is blocked. Shoulder closed. Curb adjustment for additional bus stop. Last updated Fri Nov 1 at 3:56 PM PST. (DBC-69851) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Special event planned between Haig St and Glasgow Ave for 1.7 km (Mission). Starting Sat Dec 7 at 3:00 PM PST until Sat Dec 7 at 10:00 PM PST. Road closure planned. Mission Candlelight Parade. Last updated Tue Nov 12 at 11:07 AM PST. (DBC-70168) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Utility work between Glasgow Ave and Manson St for 0.2 km (Mission). Until Sun Dec 15. From 7:30 PM to 5:00 AM PST daily. Single lane alternating traffic. Last updated Wed Nov 27 at 9:13 AM PST. (DBC-70574) |
Highway 7 |
Highway 7 (Lougheed Highway). Construction work between S River Rd and McIntyre Rd (3 km east of Mission). Until Fri Dec 6 at 3:00 PM PST. Potential remedial work to highway or offloadig materials from highway. Traffic control after 3:00 PM and during long weekend. Last updated Fri Nov 22 at 3:35 PM PST. (DBC-70469) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Tree pruning between Taylor Rd and Beach Camp Rd for 12.5 km (1 to 13 km west of Kent). Until Wed Jan 15, 2025. From 9:00 AM to 3:00 PM PST daily. Single lane alternating traffic. Last updated Thu Nov 28 at 12:14 PM PST. (DBC-70615) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Utility work between Highlands Blvd and Bodnar Rd for 5.8 km (Kent). Until Thu Dec 5. From 9:00 AM to 3:00 PM PST daily. Single lane alternating traffic. Expect delays. Last updated Wed Nov 27 at 12:34 PM PST. (DBC-70583) |
Highway 7 Eastbound |
Highway 7 (Lougheed Highway), eastbound. Construction work between Maria Lane and No 6 Rd for 5.6 km (Kent). Until Sun Dec 15. From 9:00 AM to 4:00 PM PST daily. Shoulder closed. Baseline Environmental Drilling work. Last updated Wed Nov 27 at 10:19 AM PST. (DBC-70576) |
Highway 77 |
Highway 77. Watch for slippery sections between the start of Highway 77 and the end of Highway 77 for 137.6 km (British Columbia and Northwest Territory Border). Compact snow. Last updated Tue Dec 3 at 6:50 AM MST. (DBCRCON-195396) |
Highway 7B |
Highway 7B (Mary Hill Bypass). Construction work at Kingsway Ave (Port Coquitlam). Until Fri Jan 31, 2025 at 2:00 PM PST. Bus stop improvement project. Last updated Thu Nov 28 at 1:23 PM PST. (DBC-70617) |
Highway 8 |
Highway 8. Tree pruning between the start of Highway 8 and Dot Ranch Cut-Off Rd East for 31.6 km (Spences Bridge). Until Fri Dec 20 at 5:30 PM PST. Single lane alternating traffic. Last updated Wed Nov 27 at 8:45 AM PST. (DBC-70573) |
Highway 8 |
Highway 8. Industrial traffic may slow or block regular traffic. Between Shackan IR and Dot Ranch Cut-Off Rd East for 0.2 km (26 to 27 km east of Spences Bridge). Until Fri Dec 13 at 4:00 PM PST. Single lane alternating traffic. Watch for traffic control. Last updated Tue Nov 19 at 6:47 PM PST. (DBC-70369) |
Highway 9 Southbound |
Highway 9, southbound. Utility work between Morrow Rd and Bristol Dr for 0.4 km (Kent). Until Fri Dec 6 at 4:00 PM PST. Right lane is blocked. Last updated Mon Nov 4 at 4:04 PM PST. (DBC-69944) |
Highway 9 Both Directions |
Highway 9, in both directions. Road construction work between Pioneer Ave and McCallum Rd for 1.3 km (Kent). Until Thu Dec 19 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Lane closure from Else Rd to McCallum Rd. No lane closures November 9th to 11th. Last updated Tue Oct 8 at 2:22 PM PDT. (DBC-69039) |
Highway 9 Both Directions |
Highway 9, in both directions. Construction work between McPherson Rd and Alder Ave for 1.1 km (Harrison Hot Springs). Until Mon Dec 9. From 7:00 AM to 5:00 PM PST daily. Single lane alternating traffic. Last updated Fri Nov 22 at 9:20 AM PST. (DBC-70447) |
Highway 9 Northbound |
Highway 9, northbound. Utility work planned between Alder Ave and Pine Ave for 0.3 km (Harrison Hot Springs). Starting Thu Dec 5 at 9:00 AM PST until Thu Dec 5 at 4:00 PM PST. Right lane will be blocked. Last updated Wed Nov 27 at 10:41 AM PST. (DBC-70578) |
Highway 9 Northbound |
Highway 9, northbound. Utility work between Balsam Ave and Walnut Ave for 0.3 km (Harrison Hot Springs). Until Fri Dec 6. From 9:00 AM to 4:00 PM PST on weekdays. Single lane alternating traffic. Last updated Tue Nov 5 at 1:48 PM PST. (DBC-69989) |
Highway 93 Northbound |
Highway 93, northbound. Construction work between West Boundary of Kootenay National Park and McKay Creek Maint (3 km north of Radium Hot Springs). Until Tue Dec 3 at 7:00 PM MST. Lane Closure. Lane closure at Aquacourt. Last updated Fri Nov 29 at 2:28 PM MST. (DBC-70660) |
Highway 95 Both Directions |
Highway 95, in both directions. Maintenance between Greenwood Rd and Mons Rd for 68.1 km (10 km north of Radium Hot Springs to 21 km south of Golden). From 8:00 AM to 3:30 PM MDT on Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic. Last updated Mon Oct 7 at 8:14 AM MDT. (DBC-68962) |
Highway 95A |
Highway 95A. Fog patches between the start of Highway 95A and Wasa Junction for 55.5 km (Cranbrook to 27 km north of Kimberley). Last updated Tue Dec 3 at 4:54 AM MST. (DBCRCON-196037) |
Highway 97 Both Directions |
Highway 97, in both directions. Landslide between Callan Rd and N Beach Rd for 1.5 km (2 to 1 km north of Summerland). Road open to traffic. One lane open in each direction. No delays anticipated. Please obey traffic control signage. Next update time Mon Feb 10, 2025 at 12:30 PM PST. Last updated Tue Dec 3 at 3:08 AM PST. (DBC-55794) |
Highway 97 Southbound |
Highway 97, southbound. Maintenance between Pelmewash Pky and Old Vernon Rd for 18.2 km (Kelowna). Until Wed Jan 1, 2025 at 3:00 PM PST. Single lane alternating traffic. Asplundh tree Services to do Vegetation clearing Southbound for BC Hydro along Hwy 97 between Pelmewash Prkwy & Old Vernon Rd, for 6 km. Last updated Fri Nov 29 at 10:05 AM PST. (DBC-70647) |
Highway 97 Both Directions |
Highway 97, in both directions. Vehicle recovery planned between Wetaskiwin Rd and Back Rd for 13.1 km (1 to 14 km west of Falkland). Starting Tue Dec 3 at 10:00 AM PST until Tue Dec 3 at 5:00 PM PST. Single lane alternating traffic will be in effect. Last updated Mon Dec 2 at 11:27 AM PST. (DBC-70742) |
Highway 97 |
Highway 97 (Cariboo Connector). Electrical maintenance between Loon Lake Rd and Cariboo Ave for 17.6 km (Clinton). Until Wed Dec 11. From 7:00 AM to 6:00 PM PST on weekdays. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Mon Dec 2 at 8:11 AM PST. (DBC-70725) |
Highway 97 |
Highway 97 (Cariboo Connector). Utility work between Valley Rd and Mound Rd for 2.6 km (3 km north of Clinton to Clinton). Until Fri Dec 20. From 9:00 AM to 4:00 PM PST on weekdays. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Wed Nov 20 at 3:44 PM PST. (DBC-70325) |
Highway 97 Southbound |
Highway 97 (Cariboo Connector), southbound. Utility work between Rodney Rd and Hinsche Rd for 0.6 km (13 km south of 150 Mile House). Until Fri Dec 6 at 6:00 PM PST. Single lane alternating traffic. Delays of 5 minutes. Slow down and watch for signage and personnel. Last updated Fri Nov 22 at 2:57 PM PST. (DBC-70467) |
Highway 97 Both Directions |
Highway 97 (Cariboo Connector), in both directions. Construction work between Olson Rd and Cinema Rd (22 km south of Hixon). Until Fri Dec 6 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Last updated Wed Oct 23 at 4:06 PM PDT. (DBC-69523) |
Highway 97 |
Highway 97 (Cariboo Connector). Watch for slippery sections between Stoner Pit Rd and Mitchell Rd for 75.9 km (22 km south of Pineview to 22 km north of Prince George). Last updated Tue Dec 3 at 6:46 AM PST. (DBCRCON-196001) |
Highway 97 |
Highway 97. Watch for slippery sections between Mitchell Rd and Old Hasler Rd for 237.9 km (22 km north of Prince George to 24 km south of Chetwynd). Compact snow. Last updated Tue Dec 3 at 6:46 AM PST. (DBCRCON-196047) |
Highway 97 Both Directions |
Highway 97, in both directions. Utility work between Grizzly Ave and Tudyah Lake Provincial Pk for 71.6 km (57 km north of Prince George to 7 km north of McLeod Lake). Until Wed Dec 11 at 4:00 PM PST. Lane Closure. Watch for traffic control. Last updated Thu Nov 7 at 1:41 PM PST. (DBC-68775) |
Highway 97 Both Directions |
Highway 97, in both directions. Bridge construction between Powder King Rd and Old Hasler Rd (49 km south of Chetwynd). Single lane alternating traffic. Watch for traffic control. Detour at Fisher Creek Bridge. Next update time Sun Dec 15 at 9:00 AM MST. Last updated Fri Nov 29 at 9:01 AM MST. (DBC-66238) |
Highway 97 |
Highway 97. Watch for slippery sections between Powder King Rd and Weiland Rd for 25.6 km (Chetwynd). Last updated Tue Dec 3 at 7:02 AM MST. (DBCRCON-195982) |
Highway 97 |
Highway 97. Watch for slippery sections between 52nd St NW and Watkins Rd for 33.9 km (Chetwynd). Last updated Tue Dec 3 at 7:02 AM MST. (DBCRCON-196031) |
Highway 97 |
Highway 97. Watch for slippery sections between Watkins Rd and 241 Rd for 43.2 km (33 km north of Chetwynd to 18 km south of Dawson Creek). Compact snow. Last updated Tue Dec 3 at 7:02 AM MST. (DBCRCON-196032) |
Highway 97 |
Highway 97. Watch for slippery sections between 245 Rd and Downtown Dawson Creek for 19.9 km (Dawson Creek). Last updated Tue Dec 3 at 6:55 AM MST. (DBCRCON-196060) |
Highway 97 |
Highway 97 (Alaska Highway). Watch for slippery sections between Downtown Dawson Creek and Kitt Rd for 131.4 km (Dawson Creek to 24 km south of Wonowon). Compact snow. Last updated Tue Dec 3 at 6:59 AM MST. (DBCRCON-196061) |
Highway 97 Both Directions |
Highway 97 (Alaska Highway), in both directions. Watch for slippery sections between 230 Rd and Taylor Bridge for 8.7 km (Taylor). Last updated Tue Dec 3 at 6:43 AM MST. (DBC-70760) |
Highway 97 Both Directions |
Highway 97 (Alaska Highway), in both directions. Winter operations will occur between 86 St and Julia Frtg for 14.3 km (Fort St John). Starting Tue Dec 3 at 9:00 PM MST until Sat Dec 7 at 4:30 AM MST. Snow deposit removal planned. Watch for traffic control personnel. Single lane alternating traffic will be in effect. Snow removal nightly from 9:00pm to 4:30am. Reduced speeds. Road closures and detours in effect where applicable. Last updated Mon Dec 2 at 12:37 AM MST. (DBC-70708) |
Highway 97 |
Highway 97 (Alaska Highway). Watch for slippery sections between Sikanni Rd and Pipeline Mainline for 8.0 km (Fort Nelson). Compact snow. Last updated Tue Dec 3 at 6:50 AM MST. (DBCRCON-195410) |
Highway 97A Both Directions |
Highway 97A, in both directions. Maintenance between Hutchison Rd and Davidson Dr for 2.4 km (5 to 8 km south of Sicamous). Until Wed Jan 15, 2025 at 6:00 AM PST. From 4:00 PM to 6:00 AM PST on weekdays and Saturday. Single lane alternating traffic. Expect minor delays. Retaining wall repairs. Last updated Sun Nov 17 at 10:27 AM PST. (DBC-70302) |
Highway 97C |
Highway 97C. Utility work planned between Merritt and Eight Mile Rd for 7.7 km (92 to 85 km south of Ashcroft). Starting Mon Dec 9 at 6:30 AM PST until Wed Dec 18 at 5:30 PM PST. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Wed Nov 27 at 8:34 AM PST. (DBC-70570) |
Highway 97C |
Highway 97C. Utility work between Merritt and Eight Mile Rd for 4.2 km (88 to 84 km south of Ashcroft). Until Tue Dec 31 at 5:00 PM PST. Single lane alternating traffic. Last updated Mon Nov 4 at 1:49 PM PST. (DBC-69936) |
Highway 99 Both Directions |
Highway 99, in both directions. Bridge maintenance planned between 112 St and Exit 20 for 1.6 km (Delta). Starting Mon Jan 6, 2025 until Tue Jan 14, 2025. From 8:00 PM to 4:00 AM PST daily. Lane Closure. Watch for traffic control personnel. Last updated Fri Nov 22 at 4:54 PM PST. (DBC-70476) |
Highway 99 Both Directions |
Highway 99, in both directions. Maintenance at Massey Tunnel (Richmond). Until Fri Dec 6 at 5:00 AM PST. Lane closures in both directions in effect. Watch for traffic control. Last updated Thu Nov 14 at 6:46 AM PST. (DBC-70228) |
Highway 99 Southbound |
Highway 99, southbound. Maintenance planned at Massey Tunnel (Richmond). Starting Tue Dec 3 at 10:00 PM PST until Thu Dec 5 at 5:00 AM PST. Lane Closure. Watch for traffic control personnel. Last updated Thu Nov 28 at 7:25 AM PST. (DBC-70604) |
Highway 99 Southbound |
Highway 99, southbound. Electrical maintenance between Blundell Rd and Exit 32: Steveston Hwy (Richmond). Until Wed Dec 4. From 10:00 PM to 5:30 AM PST on Monday, Tuesday, Wednesday and Thursday. Lane blocked. Expect minor delays. Last updated Fri Nov 29 at 11:12 AM PST. (DBC-70654) |
Highway 99 Southbound |
Highway 99, southbound. Construction work between Blundell Rd and Exit 32: Steveston Hwy for 2.5 km (Richmond). Until Fri Jan 31, 2025. From 10:00 PM to 5:00 AM PDT on weekdays. Lane Closure. Expect delays. Last updated Fri Aug 30 at 3:14 PM PDT. (DBC-67769) |
Highway 99 Both Directions |
Highway 99, in both directions. Maintenance planned between Garibaldi Hwy and Ocean Point Dr (2 km north of West Vancouver). Starting Wed Dec 4 at 7:30 AM PST until Wed Dec 4 at 5:30 PM PST. Left lane will be blocked. Last updated Fri Nov 29 at 10:49 AM PST. (DBC-70652) |
Highway 99 Northbound |
Highway 99, northbound. Ditching between Brunswick Beach Rd and Porteau Cove Rd for 0.7 km (4 km north of Lions Bay). Until Tue Dec 3 at 5:30 PM PST. Right lane closed. Last updated Fri Nov 29 at 10:45 AM PST. (DBC-70651) |
Highway 99 |
Highway 99. Compact snow between Lil'wat Pl and Hat Creek Rd for 100.6 km (Lillooet). Last updated Tue Dec 3 at 7:40 AM PST. (DBCRCON-196082) |
Highway 99 Both Directions |
Highway 99, in both directions. Utility work at E Lillooet Rd (Lillooet). Until Fri Dec 6. From 8:00 AM to 4:00 PM PST on weekdays and Saturday. Single lane alternating traffic. Southbound lane closure. Please watch for signs and personnel. Last updated Wed Nov 13 at 11:14 AM PST. (DBC-68655) |
Highway 99 Both Directions |
Highway 99, in both directions. Utility work between Toms Pit Rd and Fountain Valley Rd (9 km north of Lillooet). Until Fri Dec 6 at 4:00 PM PST. From 8:00 AM to 4:00 PM PST on weekdays and Saturday. Single lane alternating traffic. Eastbound lane closure. Expect delays of up to 5 minutes. Please watch for signs and personnel. Last updated Wed Nov 13 at 11:17 AM PST. (DBC-68656) |
Horsefly Rd |
Horsefly Rd. Watch for slippery sections between the start of Horsefly Rd and Horsefly Lake Rd for 47.4 km (2 km west of Dugan Lake to 1 km east of Horsefly). Last updated Tue Dec 3 at 5:10 AM PST. (DBCRCON-196053) |
Horsefly-Likely Rd |
Horsefly-Likely Rd. Watch for slippery sections between the start of Horsefly-Likely Rd and the end of Horsefly-Likely Rd for 4.5 km (150 Mile House). Last updated Tue Dec 3 at 5:10 AM PST. (DBCRCON-196054) |
McLure Ferry |
McLure Ferry. There will be required maintenance between McLure Ferry and the end of McLure Ferry (McLure). Starting Thu Dec 5 at 7:00 AM PST until Thu Dec 5 at 4:00 PM PST. Road closure planned. Last updated Mon Dec 2 at 6:55 PM PST. (DBC-70751) |
Nazko Rd |
Nazko Rd. Compact snow between Bluestone Rd and Baezaeko Rd for 67.3 km (75 to 8 km east of Nazko). Last updated Tue Dec 3 at 6:42 AM PST. (DBCRCON-196043) |
Nisga'a Hwy |
Nisga'a Hwy (Highway 113). Fog patches between Broad St and Highway 16 for 168.5 km (Gingolx to Terrace). Slushy with slippery sections. Last updated Tue Dec 3 at 6:56 AM PST. (DBCRCON-195422) |
Other Roads |
Old Alaska Highway. Geotechnical investigation at Kiskatinaw Curved Bridge 30 km north of Dawson Creek. Bridge closed. Slide impacting bridge structure, assessment underway. Next update time Thu Jan 2, 2025 at 10:00 AM MST. Last updated Wed Oct 2 at 10:11 AM MST. (DBC-30093) |
Other Roads Both Directions |
Youngsberg Road, in both directions. Bridge construction at Youngsberg Bridge near Princeton. Road closed. Estimated time of opening not available. No vehicle or pedestrian crossing available. Next update time Fri Jan 31, 2025 at 10:00 AM PST. Last updated Tue Nov 26 at 4:02 PM PST. (DBC-35978) |
Other Roads Both Directions |
Othello Road, in both directions. Road construction work between Highway 5 and Tunnel Road. Until Tue Dec 31 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Single lane alternating traffic. Expect delays. Last updated Fri Jul 26 at 2:59 PM PDT. (DBC-64917) |
Other Roads Both Directions |
Tzouhalem Road, in both directions. Road construction work between Cowichan Bay Road and Samuel Road. Until Mon Mar 24, 2025 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Shoulder closed. Last updated Mon Jun 17 at 7:52 AM PDT. (DBC-65244) |
Other Roads Both Directions |
NW Marine Drive, in both directions. Utility work at Acadia Rd. Until Tue Dec 31 at 7:00 PM PST. Lane Closure. NW Marine Dr. And Acadia Rd sewer separation and watermain work. Last updated Thu Nov 28 at 1:54 AM PST. (DBC-66577) |
Other Roads Westbound |
University Blvd., westbound. Maintenance between Western Parkway and Wesbrook Mall in Vancouver. Until Thu Jan 30, 2025. Shoring work on the south face of Menno Hall along University Blvd. Last updated Sun Sep 1 at 8:44 PM PDT. (DBC-67270) |
Other Roads Both Directions |
Fulford Ganges Road, in both directions. Road construction work between Seaview Avenue and Cranberry Road. From 7:30 AM to 3:30 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. No work on long weekends. Next update time Tue Mar 25, 2025 at 12:00 PM PDT. Last updated Fri Oct 11 at 3:04 PM PDT. (DBC-68621) |
Other Roads |
Fording River Road. Industrial traffic may slow or block regular traffic. Between Josephine Falls Trailhead and Fording FSR. Until Fri Dec 13. From 8:00 AM to 7:00 PM MDT on weekdays. Expect minor delays. Last updated Fri Oct 11 at 10:42 AM MDT. (DBC-69165) |
Other Roads Southbound |
Lochside Drive , southbound. Utility work between Frost Avenue and Weiler Avenue. Until Sat Dec 7. Detour in effect. Watermain replacement work being done on Lochside Drive between Weiler and Frost Avenue with 24 hour closures. Highway 17 being used as a detour. Last updated Fri Oct 18 at 9:08 AM PDT. (DBC-69355) |
Other Roads Eastbound |
Enderby Mabel Lake Rd, eastbound. Maintenance between River Rd and Carver Rd. Until Mon Dec 9. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Last updated Mon Oct 21 at 10:51 AM PDT. (DBC-69442) |
Other Roads Southbound |
Sylvester Rd, southbound. Utility work between Davies Rd and Nicomen Slough. Until Fri Jan 24, 2025. From 7:00 AM to 4:00 PM PST on weekdays. Single lane alternating traffic. Watch for traffic control. Last updated Thu Oct 31 at 1:37 PM PST. (DBC-69810) |
Other Roads Both Directions |
56th Avenue, in both directions. Geotechnical investigation between 256th St. And 264th St. Until Fri Jan 31, 2025 at 5:30 AM PST. From 9:00 PM to 5:30 AM PST daily. Early works investigation and asphalt coring. No closures Dec 21-Jan 5. Last updated Thu Nov 28 at 3:25 PM PST. (DBC-69857) |
Other Roads Both Directions |
Vesuvius Bay Road, in both directions. Road construction work between Langley Road and Chu an Drive. Until Fri Dec 6 at 5:00 PM PST. Single lane alternating traffic. Last updated Tue Nov 12 at 11:18 AM PST. (DBC-70169) |
Other Roads Eastbound |
Cypress Bowl Rd, eastbound. Utility work at Chippendale Rd. Until Fri Dec 6. From 7:00 AM to 5:00 PM PST daily. Watch for traffic control. Last updated Thu Nov 28 at 3:26 PM PST. (DBC-70622) |
Other Roads Both Directions |
Admirals Rd, in both directions. Construction work planned between Thomas Rd and Lekwammen Dr. In Saanich. Starting Wed Dec 4 at 7:00 AM PST until Fri Dec 6 at 5:00 PM PST. Shoulder will be closed. Expect minor delays. Watch for traffic control personnel. Work on street light and signalization poles - North and Southbound outside lanes and Shoulder closed between Thomas Rd and Lewkammen Dr. Watch for work crews and Traffic Control Personnel. Last updated Fri Nov 29 at 2:05 PM PST. (DBC-70664) |
Other Roads Both Directions |
Fraser Hwy, in both directions. Utility work between 174th St and 176th St. Until Mon Dec 9. From 8:00 PM to 5:00 AM PST on weekdays. Right lane is blocked. Centre lane blocked. Last updated Fri Nov 29 at 4:06 PM PST. (DBC-70670) |
Other Roads Both Directions |
Mission Mountain Road, in both directions. Compact snow between Mission Dam and Shalalth Cut Off near Lillooet. Watch for slippery sections. Last updated Tue Dec 3 at 7:35 AM PST. (DBC-70700) |
Other Roads Both Directions |
Mission Mtn Road, in both directions. Rock slope stabilization between Terzaghi Dam and South Shalath 60 km west of Lillooet. Until Fri Jan 3, 2025 at 4:00 PM PST. From 7:00 PM to 5:00 PM PST on weekdays. Single lane alternating traffic. Expect major delays. Expect 20 Minute Delays. Last updated Mon Dec 2 at 10:09 AM PST. (DBC-70738) |
Other Roads Eastbound |
Comox Rd, eastbound. Maintenance between Farmview Rd and Dyke Road Park 1 km north of Courtenay. Until Tue Dec 3 at 5:00 PM PST. Lane closures in both directions in effect. 5 minute delays. Last updated Mon Dec 2 at 3:15 PM PST. (DBC-70749) |
Road 40 |
Road 40 (Lillooet-Pioneer Rd). Slushy sections between Haylmore Ave and Yalakom Rd for 56.7 km (99 to 42 km west of Lillooet). Compact snow. Last updated Tue Dec 3 at 7:41 AM PST. (DBCRCON-196084) |
Road 40 |
Road 40 (Lillooet-Pioneer Rd). Compact snow between Mission Mountain Rd and Moha Rd for 43.3 km (Lillooet). Last updated Tue Dec 3 at 7:40 AM PST. (DBCRCON-196083) |
Telegraph Creek Rd |
Telegraph Creek Rd (Highway 51). Watch for slippery sections between Stikine Ave and Boulder Ave for 111.1 km (Telegraph Creek to Dease Lake). Compact snow. Last updated Tue Dec 3 at 7:04 AM PST. (DBCRCON-195424) |
Upper Arrow Lake Ferry Both Directions |
Upper Arrow Lake Ferry, in both directions. Departure delayed between Shelter Bay and Galena Bay. From 8:45 AM to 11:00 AM PST on Wednesday. Departure delayed every Wednesday for fueling purposes. Last updated Fri Nov 29 at 8:11 PM PST. (DBC-67380) |
Usk Ferry |
Usk Ferry. Seasonal shutdown between Usk Ferry and the end of Usk Ferry (Usk). Cable car in service. Last updated Thu Nov 21 at 4:32 PM PST. (DBC-70435) |