Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance between Mt Sicker Rd and Fuller Lake Rd for 3.7 km (Chemainus). Lane closures in both directions. Construction speed zone in effect. Southbound bridge closed for repairs. All Traffic diverted onto the adjacent bridge. No overwidth protocols in effect up to 4.4m. Next update time Mon Jan 20, 2025 at 7:00 AM PST. Last updated Fri Nov 29 at 9:22 PM PST. (DBC-70685) |
Highway 17 Both Directions |
Highway 17 (Patricia Bay Highway), in both directions. Construction work at Exit 18: Keating Cross Rd (Central Saanich). Until Tue Jul 1, 2025. Nighttime lane closures both directions. Access to Barbara Drive from Keating Cross Road and access to East Saanich, Martindale and Danica from Highway 17 permanently closed. Keating Cross Road southbound onramp to Highway 17 closed. Next update time Sat May 10, 2025 at 12:00 PM PDT. Last updated Thu Sep 26 at 12:08 PM PDT. (DBC-54341) |
Other Roads Both Directions |
Canal Rd, in both directions. Construction work at Mt Norman Access Rd. From 10:00 AM to 2:00 PM PST daily. Watch for traffic control. Expect delays. Road closed. Night work will begin on November 13th. Next update time Fri Dec 13 at 10:00 AM PST. Last updated Fri Nov 29 at 11:37 AM PST. (DBC-61149) |
Highway 1 Both Directions |
Highway 1, in both directions. Utility work at Highway 18. Until Mon Dec 16 at 5:00 PM PST. Left turn lane closed. Right turn lane closed. Expect minor delays. Water main, storm sewer maintenance and road resurfacing. Lane closures in effect until project end. Watch for workers/vehicles on the shoulder. Last updated Sat Nov 30 at 6:07 PM PST. (DBC-68453) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Galloping Goose Trail and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Sat Dec 14 at 5:30 AM PST. From 8:00 PM to 5:30 AM PST on weekdays. Left lane is closed in both directions. Expect delays. Traffic reduced to single lane both directions, with a maximum width of 4m and no change to the maximum height. Speed limit reduced to 50km/h. Last updated Mon Nov 25 at 12:12 PM PST. (DBC-65197) |
Highway 1 Southbound |
Highway 1 (Malahat Highway), southbound. Utility work planned between Mill Bay Rd and Whittaker Rd for 1.7 km (2 to 3 km north of Malahat Summit). Starting Wed Dec 11 at 9:00 AM PST until Wed Dec 11 at 3:00 PM PST. Right lane will be blocked. Work is between Bamberton Rd. And Roth Rd. For BC Hydro Pole replacement. Last updated Fri Nov 22 at 4:01 PM PST. (DBC-70475) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Road maintenance work planned between Sprott Rd and Norcross Rd for 0.6 km (1 to 2 km north of Duncan). Starting Wed Dec 4 at 7:30 PM PST until Wed Dec 4 at 10:00 PM PST. Right lane will be closed. Watch for traffic control personnel. Last updated Tue Dec 3 at 1:01 PM PST. (DBC-70779) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Utility work planned between River Rd and Panorama Ridge Rd for 1.7 km (Chemainus). Starting Fri Dec 13 at 9:00 AM PST until Fri Dec 13 at 3:00 PM PST. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. UTILITY WORK - Pole Cable Transfer - watch for work crews and Traffic Control Personnel. Last updated Tue Dec 3 at 2:56 PM PST. (DBC-70784) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Utility work planned between Grouhel Rd and Oyster Sto-Lo Rd for 1.4 km (2 to 1 km north of Ladysmith). Starting Fri Dec 13 at 9:00 AM PST until Fri Dec 13 at 3:00 PM PST. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. UTILITY WORK - Pole cable transfer. Watch for Traffic Control Personnel and work crews. Last updated Tue Dec 3 at 2:43 PM PST. (DBC-70783) |
Highway 14 Southbound |
Highway 14, southbound. Paving operations planned at Brickshire Drive. Starting Thu Dec 5 until Fri Dec 6. From 7:00 AM to 4:00 PM PST on Thursday and Friday. Shoulder will be closed. Exit ramp will be closed. Brickshire exit will be closed with traffic control. Last updated Thu Nov 28 at 12:15 PM PST. (DBC-70614) |
Highway 14 |
Highway 14. Road maintenance work between Deering Rd and Petrel Dr for 36.5 km (Port Renfrew to 1 km west of Jordan River). Watch for loose gravel and traffic pattern changes. Last updated Wed Oct 23 at 6:33 PM PDT. (DBC-69530) |
Highway 14 Westbound |
Highway 14, westbound. Utility work between Maple Ave S and Croce Rd for 1.4 km (Sooke). Until Tue Dec 31 at 6:00 AM PST. From 7:00 PM to 6:00 AM PST daily. Right turn lane closed. Shoulder maintenance. Single lane alternating traffic. Last updated Fri Nov 22 at 12:02 PM PST. (DBC-67026) |
Highway 14 Westbound |
Highway 14, westbound. Utility work planned between Luxton Rd and Loledo Pl for 0.5 km (Langford). Starting Wed Dec 11 at 9:00 AM PST until Wed Dec 11 at 2:00 PM PST. Lane Closure. Last updated Thu Nov 28 at 10:06 AM PST. (DBC-70610) |
Highway 19 Both Directions |
Highway 19 (Island Highway), in both directions. Utility work between Fort Rupert Rd and E Main Rd for 30.3 km (Port Hardy to 6 km south of Port McNeill). Until Fri Jan 31, 2025 at 3:00 PM PST. Single lane alternating traffic. Tree pruning. Last updated Mon Dec 2 at 10:49 AM PST. (DBC-70739) |
Highway 19 |
Highway 19 (Island Highway). Utility work planned between Big Tree Creek Rest Area and Big Tree Main for 1.0 km (33 to 34 km north of Campbell River). Starting Wed Dec 11 at 9:00 AM PST until Wed Dec 11 at 3:00 PM PST. Single lane alternating traffic will be in effect. Last updated Thu Nov 28 at 12:15 PM PST. (DBC-70616) |
Highway 19 Both Directions |
Highway 19 (Island Highway), in both directions. Utility work planned between Meredith Rd and Park Rd for 0.8 km (Campbell River). Starting Mon Dec 9 at 9:00 AM PST until Fri Dec 13 at 3:00 PM PST. Single lane alternating traffic will be in effect. Last updated Tue Nov 26 at 3:31 PM PST. (DBC-70556) |
Highway 19 Southbound |
Highway 19 (Inland Island Highway), southbound. Maintenance between Piercy Rd and Comox Valley Pky for 9.4 km (Cumberland). Until Fri Dec 6 at 4:30 PM PST. From 7:30 AM to 4:30 PM PST on weekdays. Right lane closed. Watch for traffic control. Speed limit 60 km/h. Last updated Mon Dec 2 at 5:12 AM PST. (DBC-70718) |
Highway 19A Southbound |
Highway 19A (Island Highway), southbound. Road construction work between Plummer Rd and Resort Way for 1.0 km (Parksville). Until Thu Dec 5 at 2:00 PM PST. Single lane alternating traffic. Possible delays. Watch for traffic control. Road widening and Island work - South Bound Single Lane Alternating traffic. Watch for work crews and Traffic Control Personnel. Last updated Wed Nov 27 at 11:59 AM PST. (DBC-70581) |
Highway 19A Northbound |
Highway 19A (Island Highway), northbound. Utility work planned between Barton Rd and Hobbs Rd for 0.4 km (3 km north of Qualicum Beach). Starting Wed Dec 4 at 9:00 AM PST until Wed Dec 4 at 3:00 PM PST. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. NB single lane alternating traffic between Barton Rd and Hobbs Rd. Last updated Fri Nov 29 at 8:46 PM PST. (DBC-70554) |
Highway 19A |
Highway 19A (Island Highway). Utility work planned between Northdowne Rd and Jamieson Rd for 0.3 km (18 km south of Buckley Bay Ferry Terminal). Starting Mon Dec 16 at 9:00 AM PST until Mon Dec 16 at 3:00 PM PST. Watch for traffic control personnel. Expect minor delays. Last updated Tue Dec 3 at 10:12 AM PST. (DBC-70769) |
Highway 19A |
Highway 19A (Island Highway). Limited visibility with fog between Jamieson Rd and the end of Highway 19A (Island Highway) for 82.2 km (12 km south of Buckley Bay Ferry Terminal to Campbell River). Last updated Tue Dec 3 at 9:10 PM PST. (DBCRCON-196142) |
Highway 28 |
Highway 28. Limited visibility with fog between Gold River Hwy and the end of Highway 28 for 47.4 km (Campbell River). Last updated Tue Dec 3 at 9:10 PM PST. (DBCRCON-196143) |
Highway 30 |
Highway 30. Utility work between South Hardy Mainline and Beaver Lake Forest Trail for 1.1 km (20 to 21 km north of Port Alice). Until Thu Dec 19. Drilling & Geophysical Surveying in various locations. Single Lane Alternating Traffic. Last updated Thu Nov 7 at 12:11 PM PST. (DBC-70071) |
Highway 4 Both Directions |
Highway 4, in both directions. Maintenance between Port Alberni Summit and Chalet Rd for 9.5 km (Cathedral Grove). Vehicles/loads over 3.2m in width must contact Permit Centre for instructions at 1-800-559-9688. Next update time Wed Jan 1, 2025 at 10:00 AM PDT. Last updated Mon Oct 28 at 9:48 AM PDT. (DBC-52953) |
Highway 4A Both Directions |
Highway 4A, in both directions. Utility work planned between Price Rd and Nicnbec Way for 1.6 km (1 to 3 km west of Parksville). Starting Thu Dec 5 at 9:00 AM PST until Mon Dec 9 at 3:00 PM PST. Right lane will be closed. Shoulder will be closed. Expect minor delays. Utility installation work. Maximum 5 minute delay to traffic. Watch for traffic control and work crews. Last updated Tue Dec 3 at 4:39 PM PST. (DBC-70788) |
Other Roads Both Directions |
Tzouhalem Road, in both directions. Road construction work between Cowichan Bay Road and Samuel Road. Until Mon Mar 24, 2025 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Shoulder closed. Last updated Mon Jun 17 at 7:52 AM PDT. (DBC-65244) |
Other Roads Both Directions |
Fulford Ganges Road, in both directions. Road construction work between Seaview Avenue and Cranberry Road. From 7:30 AM to 3:30 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. No work on long weekends. Next update time Tue Mar 25, 2025 at 12:00 PM PDT. Last updated Fri Oct 11 at 3:04 PM PDT. (DBC-68621) |
Other Roads Southbound |
Lochside Drive , southbound. Utility work between Frost Avenue and Weiler Avenue. Until Sat Dec 7. Detour in effect. Watermain replacement work being done on Lochside Drive between Weiler and Frost Avenue with 24 hour closures. Highway 17 being used as a detour. Last updated Fri Oct 18 at 9:08 AM PDT. (DBC-69355) |
Other Roads Both Directions |
Vesuvius Bay Road, in both directions. Road construction work between Langley Road and Chu an Drive. Until Fri Dec 6 at 5:00 PM PST. Single lane alternating traffic. Last updated Tue Nov 12 at 11:18 AM PST. (DBC-70169) |
Other Roads Both Directions |
Admirals Rd, in both directions. Construction work planned between Thomas Rd and Lekwammen Dr. In Saanich. Starting Wed Dec 4 at 7:00 AM PST until Fri Dec 6 at 5:00 PM PST. Shoulder will be closed. Expect minor delays. Watch for traffic control personnel. Work on street light and signalization poles - North and Southbound outside lanes and Shoulder closed between Thomas Rd and Lewkammen Dr. Watch for work crews and Traffic Control Personnel. Last updated Fri Nov 29 at 2:05 PM PST. (DBC-70664) |
Other Roads Northbound |
[Truncated] Burnside W Rd., northbound. Paving operations planned between Exit 10 - Burnside W merge and Watkis - Burnside Intersection near View Royal. Starting Wed Dec 4 at 7:00 AM PST until Tue Dec 10 at 5:00 PM PST. Right turn lane will be closed. Expect minor delays. Watch for traffic control personnel. PAVING - Northbound Right Turn lane closed at exit 10 - Burnside W merge and Watkis -Burnside Intersection. Watch for work crews and Traffic Control Personnel. Last updated Tue Dec 3 at 9:47 |