Highway 16 |
Highway 16 (on Haida Gwaii). Road construction work between Wiggins Rd and Brandt Rd for 3.3 km (Tlell). Until Fri May 3. From 7:30 AM to 3:30 PM PDT on weekdays. Watch for traffic control. Last updated Wed May 1 at 5:02 PM PDT. (DBC-63195) |
Highway 16 |
Highway 16 (Yellowhead Highway). Road sweeping between Prince Rupert Ferry Terminal and Port Edward Turnoff for 15.8 km (Prince Rupert). Until Thu May 2 at 5:00 PM PDT. From 8:00 AM to 5:00 PM PDT on Thursday and Friday. Slow moving vehicles. Last updated Tue Apr 30 at 12:37 PM PDT. (DBC-63394) |
Highway 16 Eastbound |
Highway 16 (Yellowhead Highway), eastbound. Construction work between 11th Ave E and Prince George St (Prince Rupert). Until Thu May 15, 2025 at 7:00 PM PDT. Right lane closed. Secondary Eastbound lane closed. No delays expected. Last updated Thu Apr 25 at 8:40 AM PDT. (DBC-62476) |
Highway 16 |
Highway 16 (Yellowhead Highway). Road sweeping planned between Port Edward Turnoff and Rainbow Avalanche Gates for 13.5 km (7 to 21 km east of Prince Rupert). Starting Fri May 3 at 8:00 AM PDT until Wed May 8 at 5:00 PM PDT. From 8:00 AM to 5:00 PM PDT on weekends, Monday, Tuesday, Wednesday and Friday. Slow moving vehicles. Last updated Tue Apr 30 at 12:47 PM PDT. (DBC-63396) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Bridge maintenance between Port Edward Turnoff and Telegraph Rest Area for 35.6 km (54 to 18 km east of Prince Rupert). Until Fri May 3. From 7:00 AM to 3:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Last updated Tue Apr 23 at 12:28 PM PDT. (DBC-63083) |