Highway 99 Both Directions |
Highway 99, in both directions. Bridge maintenance planned at Railway Rd (Surrey). Starting Tue Nov 26 at 10:00 PM PST until Thu Nov 28 at 5:00 AM PST. Lane Closure. Watch for traffic control personnel. Last updated Fri Nov 22 at 11:50 AM PST. (DBC-70460) |
Highway 99 Both Directions |
Highway 99, in both directions. Bridge maintenance planned between 112 St and Exit 20 for 1.6 km (Delta). Starting Mon Jan 6, 2025 until Tue Jan 14, 2025. From 8:00 PM to 4:00 AM PST daily. Lane Closure. Watch for traffic control personnel. Last updated Fri Nov 22 at 4:54 PM PST. (DBC-70476) |
Highway 99 Both Directions |
Highway 99, in both directions. Maintenance planned at Massey Tunnel (Richmond). Starting Mon Dec 2 at 10:00 PM PST until Fri Dec 6 at 5:00 AM PST. Lane closures in both directions planned. Watch for traffic control personnel. Last updated Thu Nov 14 at 6:46 AM PST. (DBC-70228) |
Highway 99 Southbound |
Highway 99, southbound. Construction work between Blundell Rd and Exit 32: Steveston Hwy for 2.5 km (Richmond). Until Fri Jan 31, 2025. From 10:00 PM to 5:00 AM PDT on weekdays. Lane Closure. Expect delays. Last updated Fri Aug 30 at 3:14 PM PDT. (DBC-67769) |
Highway 99 Both Directions |
Highway 99, in both directions. Road maintenance work planned between Garibaldi Hwy and Ocean Point Dr for 3.2 km (West Vancouver to 2 km south of Lions Bay). Starting Mon Nov 25 at 7:30 AM PST until Thu Nov 28 at 5:30 PM PST. Watch for traffic control personnel. Left lane will be closed in both directions. Last updated Fri Nov 22 at 10:13 AM PST. (DBC-70450) |
Highway 99 |
Highway 99. Watch for slippery sections between Lil'wat Pl and Seton Lake Rd for 45.1 km (Lillooet). Last updated Sat Nov 23 at 7:00 PM PST. (DBCRCON-194218) |
Highway 99 |
Highway 99. Watch for slippery sections between Seton Lake Rd and the end of Highway 99 for 75.9 km (Lillooet). Compact snow. Last updated Sat Nov 23 at 7:00 PM PST. (DBCRCON-194219) |
Highway 99 Both Directions |
Highway 99, in both directions. Utility work at E Lillooet Rd (Lillooet). Until Fri Dec 6. From 8:00 AM to 4:00 PM PST on weekdays and Saturday. Single lane alternating traffic. Southbound lane closure. Please watch for signs and personnel. Last updated Wed Nov 13 at 11:14 AM PST. (DBC-68655) |
Highway 99 Both Directions |
Highway 99, in both directions. Utility work between Toms Pit Rd and Fountain Valley Rd (9 km north of Lillooet). Until Fri Dec 6 at 4:00 PM PST. From 8:00 AM to 4:00 PM PST on weekdays and Saturday. Single lane alternating traffic. Eastbound lane closure. Expect delays of up to 5 minutes. Please watch for signs and personnel. Last updated Wed Nov 13 at 11:17 AM PST. (DBC-68656) |