Highway 99 Both Directions |
Highway 99, in both directions. Bridge construction at Exit 32: Steveston Hwy (Richmond). Until Sun Feb 23. From 8:00 AM to 9:00 PM PST on weekends. Reduced speed zone and lane shift. Next update time Sun Feb 23 at 9:00 PM PST. Last updated Thu Feb 20 at 3:50 PM PST. (DBC-73056) |
Highway 99 Both Directions |
Highway 99, in both directions. Bridge construction at Exit 32: Steveston Hwy (Richmond). Until Sat Feb 22 at 8:00 AM PST. Road closed. Detour in effect. Expect delays. Next update time Sat Feb 22 at 8:00 AM PST. Last updated Thu Feb 20 at 4:29 PM PST. (DBC-73058) |
Highway 99 |
Highway 99. Tree pruning between Peace Park Dr and Exit 1: Beach Rd for 0.1 km (Surrey). Until Sat Mar 15 at 5:00 PM PST. Right lane is blocked. Last updated Fri Jan 31 at 12:11 PM PST. (DBC-72457) |
Highway 99 Southbound |
Highway 99, southbound. Bridge construction planned at Exit 32: Steveston Hwy (Richmond). Starting Thu Feb 27 at 10:00 PM PST until Fri Feb 28 at 5:30 AM PST. Exit ramp will be closed. Last updated Thu Feb 20 at 4:36 PM PST. (DBC-73059) |