Highway 99 Both Directions |
Highway 99, in both directions. Construction work planned at Exit 32: Steveston Hwy (Richmond). Starting Tue May 20 at 11:00 PM PDT until Wed May 21 at 4:30 AM PDT. Road closure planned. Watch for traffic control personnel. Detour via Steveston Highway on and off ramps https://www.Highway99tunnel.Ca/current-work/. Next update time Wed May 21 at 4:30 AM PDT. Last updated Wed May 14 at 11:40 AM PDT. (DBC-76583) |
Highway 99 Southbound |
Highway 99, southbound. Utility work between Exit 26 and 112 St for 4.9 km (Delta). Until Mon Jun 16. From 12:00 AM to 12:00 AM PDT daily. Right turn lane closed. Watch for traffic control. Expect delays. No closures on the long weekend. Last updated Wed May 14 at 4:13 PM PDT. (DBC-76647) |
Highway 99 Southbound |
Highway 99, southbound. Construction work between Exit 26 and Exit 20 for 1.8 km (Delta). Until Mon Jun 16. Right lane is blocked. Last updated Thu May 1 at 2:28 PM PDT. (DBC-76066) |
Highway 99 Southbound |
Highway 99, southbound. Construction work planned between Exit 28 and Exit 26 for 1.5 km (Delta). Starting Mon May 26 at 9:30 PM PDT until Wed May 28 at 5:30 AM PDT. Right lane will be closed. Last updated Wed May 7 at 3:15 PM PDT. (DBC-76330) |
Highway 99 Both Directions |
Highway 99, in both directions. Bridge maintenance planned between Garibaldi Hwy and Ocean Point Dr for 1.7 km (2 km north of West Vancouver to West Vancouver). Starting Mon May 19 until Wed May 21. From 7:30 AM to 5:30 PM PDT daily. Alternating lane closures. Watch for traffic control. Last updated Fri May 16 at 9:03 AM PDT. (DBC-76720) |
Highway 99 Southbound |
Highway 99, southbound. Bridge maintenance planned between Daisy Lake Rd and Alice Lake Rd (1 km north of Squamish). Starting Tue May 20 at 7:30 AM PDT until Tue May 20 at 5:30 PM PDT. Right lane will be closed. Watch for traffic control personnel. Last updated Fri May 16 at 8:59 AM PDT. (DBC-76719) |
Highway 99 Both Directions |
Highway 99, in both directions. Road sweeping planned between Centennial Way and Alpha Lake Rd for 46.9 km (Whistler to Squamish). Starting Sun May 18 until Fri May 23. From 7:30 AM to 5:30 PM PDT daily. Watch for slow moving vehicles. Last updated Fri May 16 at 9:06 AM PDT. (DBC-76721) |
Highway 99 Northbound |
Highway 99, northbound. Utility work planned between Spring Creek Dr and Alta Lake Rd for 1.6 km (Whistler). Starting Mon May 26 at 9:00 AM PDT until Fri May 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. BC Hydro equipment inspection and pole replacement. Watch for crews working. Last updated Fri May 9 at 4:45 PM PDT. (DBC-76439) |
Highway 99 Both Directions |
Highway 99, in both directions. Utility work planned between Lorimer Rd and Nancy Greene Dr for 0.6 km (Whistler). Starting Mon May 26 at 9:00 AM PDT until Fri May 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. BC Hydro equipment inspection and pole replacement. Watch for crews working. Last updated Fri May 9 at 4:45 PM PDT. (DBC-76437) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work between Park St and Portage Rd for 0.5 km (Pemberton). Until Sat Aug 30. From 7:30 AM to 4:30 PM PST daily. Right turn lane off Hwy 99 and left turn lane onto Hwy 99 from existing access road are affected. Construction access and heavy truck access. Last updated Tue Mar 4 at 10:48 AM PST. (DBC-73529) |
Highway 99 Both Directions |
Highway 99, in both directions. Rock slope stabilization between Lil'wat Pl and Seton Lake Rd for 0.6 km (15 km south of Lillooet). Until Sat Jun 21 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT on weekdays and Saturday. Single lane alternating traffic. The work is 1 KM north of the Cottonwood Rec Site. Rock scaling and slope mesh installation. Last updated Thu Apr 24 at 1:40 PM PDT. (DBC-75530) |
Highway 99 |
Highway 99. Bridge maintenance between Lil'wat Pl and Texas Creek Rd for 43.0 km (Lillooet). From 6:00 AM to 3:00 PM PDT on Monday, Tuesday and Wednesday. Lane Closure. Expect Bridge Cleaning between Lillooet and Blowdown. Short Delays possible. Last updated Fri Apr 25 at 1:19 PM PDT. (DBC-75810) |