Highway 99 |
Highway 99. Utility work between Texas Creek Road and Split Rock Road 2 km south of Lillooet. Until Mon Aug 11. From 8:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Please watch for signage personnel. Expect minor delays of up to five minutes. Last updated Wed Jul 30 at 11:43 AM PDT. (DBC-79905) |
Highway 99 Northbound |
Highway 99, northbound. Special event between the start of Highway 99 and Exit 1: Beach Rd for 0.6 km (British Columbia and Washington Border to Surrey). Until Fri Aug 29. Watch for traffic control. Vessel inspection at Peace Arch Visitor Centre. From 8am-8pm on the following dates: Aug 4 & 5, Aug 28 & 29. Last updated Mon Jul 21 at 11:38 AM PDT. (DBC-78210) |
Highway 99 Northbound |
Highway 99, northbound. Construction work between Exit 20 and 72 St for 4.1 km (Delta). Until Fri Aug 22. Shoulder closed. Last updated Thu Jul 17 at 3:25 PM PDT. (DBC-79404) |
Highway 99 Both Directions |
Highway 99, in both directions. Utility work planned between Exit 20 and Exit 28 for 3.4 km (Delta). Starting Tue Aug 19 until Sat Sep 6. From 8:00 AM to 6:00 AM PDT daily. No traffic control or lane closures. Last updated Fri Aug 8 at 9:38 AM PDT. (DBC-80222) |
Highway 99 Southbound |
Highway 99, southbound. Utility work between Massey Tunnel and Exit 28 for 0.3 km (Delta). Until Sun Aug 17. From 10:00 PM to 5:30 AM PDT daily. Shoulder closed. Last updated Thu Aug 7 at 11:47 AM PDT. (DBC-80194) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work at Exit 32: Steveston Hwy (Richmond). Until Thu Aug 14. From 10:00 PM to 5:00 AM PDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Periods of lane shifts and restricted left turns to and from ramps. Follow posted detour routes and traffic control personnel. Plan for additional travel time through detours and consider alternate exits. Last updated Fri Aug 8 at 4:11 PM PDT. (DBC-80253) |
Highway 99 Northbound |
Highway 99, northbound. Paving operations at Ansell Pl (West Vancouver). Until Mon Aug 11 at 6:00 PM PDT. Right lane closed. Last updated Fri Aug 8 at 2:43 PM PDT. (DBC-80248) |
Highway 99 Southbound |
Highway 99, southbound. Paving operations planned between Ocean Point Dr and Ansell Pl for 3.9 km (West Vancouver to 2 km south of Lions Bay). Starting Tue Aug 12 at 5:00 AM PDT until Wed Aug 13 at 6:00 PM PDT. From 5:00 AM to 6:00 PM PDT on Tuesday and Wednesday. Northbound traffic diverted to northbound right lane and southbound traffic to the left lane northbound. Last updated Fri Aug 8 at 2:36 PM PDT. (DBC-80246) |
Highway 99 Northbound |
Highway 99, northbound. Paving operations planned between Ocean Point Dr and Lions Bay Ave for 3.2 km (Lions Bay). Starting Tue Aug 12 at 6:00 AM PDT until Tue Aug 12 at 6:00 PM PDT. Right lane will be closed. Last updated Fri Aug 8 at 2:49 PM PDT. (DBC-80250) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work between Park St and Portage Rd for 0.5 km (Pemberton). Until Sat Aug 30. From 7:30 AM to 4:30 PM PST daily. Right turn lane off Hwy 99 and left turn lane onto Hwy 99 from existing access road are affected. Construction access and heavy truck access. Last updated Tue Mar 4 at 10:48 AM PST. (DBC-73529) |