Highway 4 Both Directions |
Highway 4, in both directions. Maintenance planned between Old Nanaimo Hwy and Chatsworth Rd for 26.6 km (9 km west of Qualicum Beach to 1 km east of Port Alberni). Starting Wed Jun 11 at 9:00 AM PDT until Wed Jun 11 at 3:00 PM PDT. Road closure planned. Detour will not be available. Watch for traffic control personnel. Full closure between Chalet Rd and the brake check at the Alberni summit. Next update time Wed Jun 11 at 3:00 PM PDT. Last updated Fri Jun 6 at 2:41 PM PDT. (DBC-77654) |
Highway 4 Westbound |
Highway 4, westbound. Electrical maintenance planned between Elizabeth St and Gertrude St (Port Alberni). Starting Thu Jun 12 at 11:30 AM PDT until Thu Jun 12 at 3:30 PM PDT. Watch for traffic control personnel. Shoulder will be closed. Last updated Mon May 26 at 12:18 PM PDT. (DBC-77114) |
Highway 4 Both Directions |
Highway 4, in both directions. Paving operations between Elizabeth St and Helen St for 0.2 km (Port Alberni). Until Fri Jun 27 at 5:00 PM PDT. Roadway reduced to two lanes. Expect minor delays. Watch for traffic control. PAVING PREP, PAVING and LINE PAINTING - WATCH FOR WORK CREWS. Last updated Mon Jun 2 at 10:44 AM PDT. (DBC-77421) |
Highway 4 Eastbound |
Highway 4, eastbound. Electrical maintenance planned between Helen St and Merrifield St (Port Alberni). Starting Thu Jun 12 at 9:00 AM PDT until Thu Jun 12 at 11:30 AM PDT. Right lane will be closed. Watch for traffic control personnel. Last updated Mon May 26 at 12:21 PM PDT. (DBC-77115) |
Highway 4 Both Directions |
Highway 4, in both directions. Maintenance between Port Alberni Summit and Chalet Rd for 9.5 km (Cathedral Grove). Vehicles/loads over 3.2m in width must contact Permit Centre for instructions at 1-800-559-9688. Next update time Fri Aug 1 at 10:00 AM PDT. Last updated Wed Apr 2 at 10:13 AM PDT. (DBC-52953) |