• Events for Highway 4
  • Highway 4 Both Directions Highway 4, in both directions. Paving operations between Sutton Pass Summit and Taylor River Rest Area for 4.6 km (Sutton Pass Summit). Until Fri Oct 31. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. 24/7 alternating traffic may be implemented periodically. Next update time Fri Oct 31 at 5:00 PM PDT. Last updated Fri Sep 5 at 9:52 AM PDT. (DBC-81228)
    Highway 4 Both Directions Highway 4, in both directions. Construction work between Hydro Hill West Creek and Kennedy River Rest Area for 2.3 km (25 km west of Sutton Pass Summit to 23 km east of Southern Boundary of Pacific Rim National Park). Until Fri Oct 31. Single lane alternating traffic. Watch for speed reduction and Trucks turning. Next update time Fri Oct 31 at 9:00 AM PDT. Last updated Wed Aug 20 at 9:36 AM PDT. (DBC-78891)
    Highway 4 Both Directions Highway 4, in both directions. Maintenance between Port Alberni Summit and Chalet Rd for 9.5 km (Cathedral Grove). Vehicles/loads over 3.2m in width must contact Permit Centre for instructions at 1-800-559-9688. Daytime travel restriction, must travel between 9pm-5am. Next update time Fri Nov 14 at 10:00 AM PDT. Last updated Fri Aug 1 at 10:04 AM PDT. (DBC-52953)