Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Paving operations between Sunday Summit and Copper Mountain Rd for 34.2 km (Princeton). Until Sat Oct 4 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Width limit 5.00 m. Height limit 5.00 m. Project from Sunday Summit to Princeton. Expect delays up to 20 mins. Next update time Sat Oct 4 at 7:00 PM PDT. Last updated Sun Sep 7 at 6:06 AM PDT. (DBC-78739) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Construction work between First Avalanche Gate and Second Avalanche Gate for 4.4 km (13 to 18 km east of Hope). Until Tue Sep 30. From 7:00 AM to 7:00 PM PDT daily. Right lane is blocked. Last updated Mon Sep 8 at 1:52 PM PDT. (DBC-81317) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work between Second Avalanche Gate and Allison Pass Summit for 7.9 km (33 to 40 km east of Hope). Until Mon Dec 1 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Expect delays. Lane Closure. Temporary detour at Snass Creek Bridge. Last updated Mon Apr 21 at 12:32 PM PDT. (DBC-74724) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Crack sealing is planned at Manning Park Resort (64 km east of Hope). Starting Mon Sep 22 at 9:00 AM PDT until Tue Sep 23 at 3:30 PM PDT. From 9:00 AM to 3:30 PM PDT on Monday and Tuesday. Left lane will be closed in both directions. Last updated Thu Sep 18 at 3:59 PM PDT. (DBC-81760) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Road construction work between Garret Rd and Sunday Summit for 11.3 km (43 to 32 km west of Princeton). Until Fri Oct 31. Single lane alternating traffic. Watch for traffic control. Minimum width to be maintained through project zone is 4.4 meters. Next update time Fri Oct 31. Last updated Tue Sep 9 at 3:52 PM PDT. (DBC-77799) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for falling rocks between Wilgress Lake Rest Area and Granby Rd for 26.1 km (2 km west of Eholt Summit to Grand Forks). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73820) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for falling rocks between East Lake Dr and Highway 3B for 39.8 km (Christina Lake to 24 km west of Castlegar). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73822) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work at Porto Rico Rd (2 km east of Moyie). Until Sat Nov 1 at 5:00 PM MDT. From 7:00 AM to 5:00 PM MDT on weekdays and Saturday. Right lane closed. Shoulder closed. Grading and paving upgrades for new sign installation. Last updated Tue Sep 2 at 11:13 AM MDT. (DBC-81097) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work at Peavine Bridge (9 km east of Moyie). Until Sat Nov 1 at 5:00 PM MDT. From 7:00 AM to 5:00 PM MDT on weekdays and Saturday. Right turn lane closed. Shoulder closed. Grading and paving upgrades for sign installation. Last updated Tue Sep 2 at 11:12 AM MDT. (DBC-81098) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Utility work planned between Fernie Ski Hill Rd and Boardman Rd for 3.0 km (1 to 4 km west of Fernie). Starting Wed Oct 1 at 8:00 AM MDT until Wed Oct 1 at 6:00 PM MDT. Right lane will be blocked. Watch for traffic control personnel. Last updated Fri Sep 12 at 4:53 PM MDT. (DBC-81517) |