• Events for Highway 23
  • Highway 23 Southbound Highway 23, southbound. Seal coating between Junction Hwy 31 and Junction Hwy 6 for 44.8 km (Nakusp). Until Mon Jun 30 at 7:00 PM PDT. Single lane alternating traffic. Expect delays. Pilot car controlled. Last updated Wed May 28 at 4:58 PM PDT. (DBC-77259)
    Highway 23 Northbound Highway 23, northbound. Shoulder maintenance planned between 5 Mile Boat Launch and Martha Creek Camp Ground for 8.9 km (10 to 1 km north of Revelstoke). Starting Thu Jun 12 until Wed Jun 18. From 7:00 AM to 5:00 PM PDT daily. Shoulder will be closed. Geological testing of the rock along the Highway. Speed reduction to 50 km/h. Last updated Wed May 28 at 3:31 PM PDT. (DBC-77255)
    Highway 23 Both Directions Highway 23, in both directions. Utility work planned between Goldstream River Bridge and Mica Dam Avalanche Gates for 43.3 km (47 to 3 km south of Mica Dam). Starting Mon Jun 16 until Fri Jun 27. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic will be in effect. Speed reduction to 50 km/hr. Watch for traffic control. Last updated Tue Jun 3 at 4:43 PM PDT. (DBC-77293)