Highway 19A Both Directions |
Highway 19A (Island Highway), in both directions. Utility work planned between Marview Dr and Lambert Lane for 0.2 km (16 km north of Qualicum Beach). Starting Tue May 20 at 9:00 AM PDT until Fri May 23 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. Watch for speed reduction and work crews. Last updated Fri May 16 at 3:57 PM PDT. (DBC-76734) |
Highway 19A |
Highway 19A (Island Highway). Water pooling between Jamieson Rd and Glenmore Rd for 58.5 km (12 km south of Buckley Bay Ferry Terminal to 11 km south of Campbell River). Heavy rain. Last updated Sat May 17 at 1:08 PM PDT. (DBCRCON-223147) |
Highway 19A |
Highway 19A (Island Highway). Utility work between Virginia Dr and Grieve Rd for 1.2 km (1 km north of Courtenay to Courtenay). Until Fri May 23 at 3:00 PM PDT. Single lane alternating traffic. Telus Aerial placing and Splicing. Last updated Fri May 9 at 10:14 AM PDT. (DBC-76409) |
Highway 19A Northbound |
Highway 19A (Island Highway), northbound. Utility work planned between Lalum Rd and Ployart Rd for 0.4 km (15 to 16 km south of Campbell River). Starting Wed May 28 at 11:00 PM PDT until Thu May 29 at 6:00 AM PDT. Single lane alternating traffic will be in effect. Rogers - Run communication line. Last updated Wed May 7 at 1:48 PM PDT. (DBC-76326) |
Highway 19A Both Directions |
Highway 19A (Island Highway), in both directions. Shoulder maintenance between Catherwood Rd and Jubilee Pky for 11.3 km (12 km south of Campbell River to Campbell River). Until Wed May 21 at 5:00 PM PDT. From 7:30 AM to 5:00 PM PDT daily. Watch for traffic control. WATCH FOR SLOW MOVING TRACTOR FOR SHOULDER REPAIR, AND SLOW MOVING EQUIPMENT. Last updated Wed May 14 at 9:40 AM PDT. (DBC-76622) |
Highway 19A |
Highway 19A (Island Highway). Construction work planned between Henry Rd and Heard Rd for 2.8 km (4 to 1 km south of Campbell River). Starting Wed Jun 4 at 7:00 AM PDT until Fri Jan 30, 2026 at 7:00 PM PDT. Multiple locations. Work at each location done within 3 hrs. Last updated Tue Apr 8 at 2:45 PM PDT. (DBC-75100) |