• Events for Highway 19A
  • Highway 19A Northbound Highway 19A (Island Highway), northbound. Utility work planned between Enterprise St and Hammond Bay Rd for 0.1 km (Nanaimo). Starting Wed Aug 20 at 10:00 AM PDT until Wed Aug 20 at 3:00 PM PDT. Right turn lane will be closed. Expect minor delays. Watch for traffic control personnel. Pole work - Right turn lane at Marlin Way closed. Slow down and watch for work crews. Last updated Thu Aug 7 at 2:11 PM PDT. (DBC-80199)
    Highway 19A Both Directions Highway 19A (Island Highway), in both directions. Geotechnical investigation planned between Greig Rd and Plummer Rd for 0.3 km (Parksville). Starting Mon Aug 18 at 8:00 AM PDT until Fri Aug 22 at 5:00 PM PDT. Expect minor delays. Watch for traffic control personnel. LANE SHIFT - SLOW DOWN AND WATCH FOR WORK CREWS. Last updated Tue Aug 5 at 2:12 PM PDT. (DBC-80116)
    Highway 19A Highway 19A (Island Highway). Ditching between Comox Rd and Ryan Rd for 1.5 km (Courtenay). Lane Closure. Watch for traffic control. Right lane closed. Last updated Tue Jul 29 at 11:25 AM PDT. (DBC-79859)
    Highway 19A Both Directions Highway 19A (Island Highway), in both directions. Utility work planned between Iron River Rd and Colorado Dr for 6.8 km (Campbell River). Starting Mon Aug 18 at 7:30 AM PDT until Fri Sep 19 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. When work on shoulder is not available expect Single Lane Alternating Traffic on 19A 9am to 3pm. Last updated Wed Aug 6 at 10:17 AM PDT. (DBC-80147)
    Highway 19A Highway 19A (Island Highway). Construction work between Henry Rd and Heard Rd for 2.8 km (4 to 1 km south of Campbell River). Until Fri Jan 30, 2026 at 7:00 PM PDT. Multiple locations. Work at each location done within 3 hrs. Last updated Tue Apr 8 at 2:45 PM PDT. (DBC-75100)