Highway 19 Both Directions |
Highway 19 (Island Highway), in both directions. Utility work between Fort Rupert Rd and E Main Rd for 30.3 km (Port Hardy to 6 km south of Port McNeill). Until Fri Jan 31, 2025 at 3:00 PM PST. Single lane alternating traffic. Tree pruning. Last updated Mon Dec 2 at 10:49 AM PST. (DBC-70739) |
Highway 19 |
Highway 19 (Island Highway). Watch for slippery sections between Beaver Cove Rd and Rainbow Rd for 120.7 km (15 km south of Port McNeill to 51 km north of Campbell River). Last updated Fri Jan 17 at 3:50 PM PST. (DBCRCON-210709) |
Highway 19 Southbound |
Highway 19 (Inland Island Highway), southbound. Roadside brushing between Jubilee Pky and Hamm Rd for 17.2 km (Campbell River). Until Mon Jan 27 at 4:00 PM PST. From 8:00 AM to 4:00 PM PST on Thursday and Friday. Right lane is blocked. Watch for traffic control. Last updated Fri Jan 10 at 1:48 PM PST. (DBC-71784) |
Highway 19 Northbound |
Highway 19 (Inland Island Highway), northbound. Maintenance between Parksville Exit (Highway 19A) and Church Rd for 5.6 km (Parksville). Until Mon Jan 27 at 3:00 PM PST. Right lane closed. Expect minor delays. Watch for traffic control. TREE MAINTENANCE - Right lane closure in multiple locations highway 19 between 19A - exit 46 and 4A - exit 51. Watch for work crews. Last updated Fri Jan 3 at 9:20 AM PST. (DBC-71601) |
Highway 19 Southbound |
Highway 19 (Inland Island Highway), southbound. Utility work planned between Parksville Exit (Highway 19A) and NW Bay Logging Rd for 1.3 km (Parksville to 2 km south of Parksville). Starting Mon Jan 20 at 9:00 AM PST until Mon Jan 20 at 3:00 PM PST. Right lane will be closed. Expect minor delays. BC Hydro pole replacement between Kaye Rd and NW Bay Logging Rd. Watch for work crews. Last updated Mon Jan 6 at 10:17 AM PST. (DBC-71525) |