Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Construction work between 1st St and 3rd Ave E for 0.2 km (Prince Rupert). Until Sun Nov 30 at 5:30 PM PDT. Road closed. Detour in effect. Detour via: 3rd Ave E to 1st Ave E, 1st Ave W to 2nd St. Next update time Sun Nov 30 at 5:30 PM PDT. Last updated Tue May 27 at 4:01 PM PDT. (DBC-77182) |
Highway 16 Both Directions |
Highway 16 (on Haida Gwaii), in both directions. Bridge maintenance between E Cedar Ave and Beitush Rd for 6.3 km (7 km west of Tlell to 5 km east of Port Clements). Bridge construction. Bridge repairs in effect at Woodpile Bridge. Speed reduction, reduce speed. Next update time Wed Jul 2 at 11:30 AM PDT. Last updated Mon Jun 30 at 11:29 AM PDT. (DBC-74895) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Line painting between Eby St and Tetrault St for 0.4 km (Terrace). Until Tue Sep 30. From 9:00 PM to 6:00 AM PDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Lane Closure. Last updated Tue Jul 1 at 1:36 PM PDT. (DBC-78703) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Utility work planned between Stella Rd and Francois Lake Rd for 2.0 km (2 km west of Fraser Lake to 4 km east of Endako). Starting Wed Jul 2 at 8:00 AM PDT until Mon Jul 14 at 4:00 PM PDT. Lane Closure. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Jun 26 at 9:58 AM PDT. (DBC-78564) |
Highway 16 Westbound |
Highway 16 (Yellowhead Highway), westbound. Line painting between Budds Rd and McBride Timber Rd for 2.3 km (4 to 7 km east of Bednesti Norman). Until Tue Sep 30. From 6:00 PM to 6:00 AM PDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Right lane is blocked. Last updated Tue Jul 1 at 1:30 PM PDT. (DBC-78704) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Line painting between Domano Blvd and Victoria St for 5.0 km (Prince George). Until Tue Sep 30. From 9:00 PM to 6:00 AM PDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic. Watch for traffic control. Last updated Tue Jul 1 at 1:34 PM PDT. (DBC-78706) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Line painting between River Rd and Boundary Rd for 3.5 km (Prince George). Until Tue Sep 30. From 6:00 PM to 6:00 AM PDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Right lane is blocked. Last updated Tue Jul 1 at 1:38 PM PDT. (DBC-78707) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Construction work at Overlander Falls Access (17 km east of Tete Jaune). Until Thu Jul 10 at 11:45 PM PDT. Speed limit 70 km/h. Last updated Mon Jun 30 at 8:52 AM PDT. (DBC-78334) |