Highway 14 Both Directions |
Highway 14, in both directions. Utility work planned between Jordan River Recsite and Kirby Creek Rd for 12.6 km (Jordan River). Starting Fri Jul 4 at 8:00 AM PDT until Fri Jul 4 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Mon Jun 16 at 8:58 AM PDT. (DBC-78055) |
Highway 14 Both Directions |
Highway 14, in both directions. Utility work between Church Rd and Phillips Rd for 1.1 km (Sooke). Until Wed Dec 31 at 12:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Mon May 5 at 7:43 AM PDT. (DBC-75277) |
Highway 14 Both Directions |
Highway 14, in both directions. Paving operations between Veterans Memorial Pky and the end of Highway 14 for 3.3 km (Colwood to Langford). Until Fri Jul 18 at 5:30 AM PDT. From 7:30 PM to 5:30 AM PDT on weekdays and Sunday. Lane closures along with a traffic pattern change will be in effect. Watch for crews. Last updated Wed Jun 11 at 11:08 AM PDT. (DBC-77869) |
Highway 14 Both Directions |
Highway 14, in both directions. Utility work planned between Veterans Memorial Pky and Veterans Memorial Pky (Colwood). Starting Wed Jul 9 until Mon Jul 14. From 7:00 PM to 5:00 AM PDT and from 9:00 AM to 3:00 PM PDT daily. Single lane alternating traffic will be in effect. Shoulder will be closed. Last updated Thu Jun 26 at 9:31 AM PDT. (DBC-78562) |