• Events for Highway 13
  • Highway 13 Southbound Highway 13, southbound. Construction work between the end of Highway 13 and 52 Ave for 0.9 km (Langley - District). Until Thu Jul 31. Entrance ramp closed. Eastbound Highway 1 entrance loop is closed. Eastbound exit ramp from Highway 1 onto 264th is open. Through lane after the exit loop is closed. In effect 24/7. Next update time Thu Jul 31 at 12:00 PM PDT. Last updated Sun Apr 13 at 6:26 AM PDT. (DBC-74478)
    Highway 13 Both Directions Highway 13, in both directions. Construction work at 56 Ave (Langley - District). Until Thu Jul 31 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Detour in effect. Entrance ramp closed. Last updated Mon Apr 21 at 12:10 PM PDT. (DBC-74197)