Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Paving operations planned at Exit 27: E 1st Ave (Vancouver). Starting Mon Sep 15 at 10:00 PM PDT until Tue Sep 16 at 6:00 AM PDT. Exit ramp will be closed. Watch for traffic control personnel. Eastbound 1st Avenue offramp closed. Emergency Vehicles will have access to the closed ramp. Next update time Tue Sep 16 at 6:00 AM PDT. Last updated Fri Sep 12 at 9:09 PM PDT. (DBC-81534) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Paving operations planned at Exit 29: Willingdon Ave (Burnaby). Starting Mon Sep 15 at 10:00 PM PDT until Tue Sep 16 at 6:00 AM PDT. Entrance ramp will be closed. Emergency Vehicles will have access to the closed ramps. Closure of the Willingdon Avenue on ramp to Highway One Eastbound. Next update time Tue Sep 16 at 6:00 AM PDT. Last updated Mon Sep 15 at 6:11 AM PDT. (DBC-81536) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work between 248 St and Bradner Rd for 5.7 km (Langley - District). Until Tue Sep 30. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:00 AM PDT on weekdays. Lane closures in both directions in effect. Full highway closures from 11:00PM to 4:30AM as needed. Traffic diverted to Exit 73 on and off-ramps at those times. Next update time Tue Sep 30. Last updated Mon Jul 28 at 2:30 PM PDT. (DBC-79804) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Construction work at Exit 73 (Langley - District). Until Wed Dec 31 at 7:00 PM PDT. Exit ramp is closed. Current westbound offramp loop is closed. A new offramp will open before the overpass. Exit the highway and turn left or right onto 264th Street. Next update time Wed Dec 31 at 7:00 AM PDT. Last updated Sat Aug 2 at 11:01 PM PDT. (DBC-76914) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Gladwin Rd and Nicomen River Rd for 1.1 km (10 to 11 km east of Lytton). Single lane alternating traffic. Work will take place from 6:00am-4:30pm PT daily. Expect up to 40 minute delays due to railway crossing / construction activities. Next update time Fri Sep 19 at 10:00 AM PDT. Last updated Mon Sep 15 at 11:46 AM PDT. (DBC-75637) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work planned between Gladwin Rd and Nicomen River Rd (11 km east of Lytton). Starting Mon Sep 15 at 10:00 PM PDT until Tue Sep 16 at 3:00 AM PDT. Road closure planned. Next update time Tue Sep 16 at 3:00 AM PDT. Last updated Fri Sep 12 at 7:59 PM PDT. (DBC-81393) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. 60km/h work zone. 80km/h outside construction hours. Watch for traffic control. Next update time Sat Sep 20 at 5:00 PM PDT. Last updated Sat Aug 16 at 12:40 PM PDT. (DBC-64961) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Bolton Rd for 4.5 km (Tappen). Until Wed Dec 31. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Speed limit 60 km/h. Single lane alternating traffic and intermittent stoppages. Expect delays up to 20 min delays. Watch for traffic control. Next update time Mon Dec 1 at 9:00 AM PDT. Last updated Sat Sep 13 at 6:42 AM PDT. (DBC-72306) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Tappen Beach Rd and 65 Ave NW for 2.6 km (Salmon Arm to 2 km east of Tappen). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Expect minor delays. Next update time Fri Sep 26 at 9:00 AM PDT. Last updated Mon Sep 15 at 9:17 AM PDT. (DBC-72305) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 8:00 PM to 6:00 AM PDT on weekdays and Saturday. Single lane alternating traffic. Hwy closed 9am-3pm M-F and Sat starting Tue Sept 16. Watch for traffic control. Use alternate route Hwy 97A and 97B. Next update time Tue Sep 16 at 12:00 PM PDT. Last updated Mon Sep 15 at 12:05 PM PDT. (DBC-70490) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Rock scaling at West Boundary of Mount Revelstoke National Park (1 km west of West Boundary of Mount Revelstoke National Park). Until Thu Oct 30 at 7:00 PM PDT. Work is 19km to 28km east of Revelstoke. Expect speed reductions to 50 km/h in work zone, flag persons, lane closures and delays up to 20 minutes. Next update time Thu Oct 30 at 7:00 PM PDT. Last updated Tue Sep 9 at 12:05 PM PDT. (DBC-81113) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Expect up to 30 minute delays and single lane alternating traffic anytime. 2hr closures 3:30am - 5:30am Tues-Sat mornings, and 12:30am-2:30am Sunday and Monday mornings. Next update time Sun Sep 21 at 12:00 PM PDT. Last updated Mon Sep 15 at 12:08 PM PDT. (DBC-73974) |
Highway 1 |
Highway 1. Utility work between Sackum and Venables Valley road. Until Tue Sep 30. From 7:00 AM to 6:00 PM PDT on weekdays. Single lane alternating traffic. Please watch for traffic control personnel and crews working. Expect minor delays of up to five minutes. Last updated Mon Aug 11 at 10:07 AM PDT. (DBC-80309) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work between Roderick St and Culduthel Rd for 0.6 km (Saanich). Until Tue Sep 30 at 5:00 AM PDT. Right lane closed. Left lane is closed. Expect minor delays. Watch for traffic control. Last updated Wed Feb 19 at 11:59 AM PDT. (DBC-72994) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Carey Rd and Galloping Goose Trail (Saanich). Watch for traffic control. Traffic pattern change and night closures on Carey. Plan your route accordingly and expect traffic delays. Construction zone in effect 24/7. Last updated Fri Aug 1 at 1:49 PM PDT. (DBC-79782) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Tillicum Rd and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Wed Dec 24, 2025. From 8:00 PM to 5:30 AM PST on weekdays and Sunday. Lane closures in both directions in effect. Traffic reduced to single lane both directions. Maximum width 4m. No maximum height change. Speed limit 50km/h. Last updated Fri Dec 20 at 9:03 AM PST. (DBC-71006) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Exit 6: McKenzie Ave and Exit 8: Helmcken Rd (View Royal). Until Fri Sep 19 at 5:30 AM PDT. Lane closures in both directions in effect. Nightly lane closures Mon-Fri September 15-19th. Last updated Mon Sep 15 at 6:08 AM PDT. (DBC-81326) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Exit 6: McKenzie Ave and Exit 10: Burnside Rd W for 3.8 km (View Royal to Saanich). Construction work at Colwood Interchange, Helmcken Interchange, and McKenzie Interchange until Fall 2027. Expect speed changes, traffic pattern changes, and overnight work. Next update time Tue Sep 16 at 10:00 AM PDT. Last updated Mon Jun 16 at 10:07 AM PDT. (DBC-73856) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work at Drinkwater Rd (1 km north of Duncan). Until Fri Oct 10. In effect 24/7. No lanes affected. Watch for signage in area. Last updated Fri Sep 12 at 9:39 AM PDT. (DBC-81493) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Tree pruning between MacMillan Bloedel Haul Rd and Davis Rd for 5.9 km (1 km south of Ladysmith to Chemainus). Until Tue Sep 16 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Tree Maintenance - watch for speed reduction and work crews. Last updated Mon Sep 8 at 2:54 PM PDT. (DBC-81297) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Utility work between Brenton-Page Rd and Cedar Rd for 0.7 km (4 to 5 km north of Ladysmith). Until Fri Sep 26 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Utility work - watch for speed reduction and work crews. Last updated Wed Sep 3 at 2:43 PM PDT. (DBC-81173) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Bridge maintenance planned between Spruston Rd and Haslam Rd (6 km south of Nanaimo). Starting Tue Sep 16 at 9:00 AM PDT until Tue Sep 16 at 2:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. BRIDGE DECK REPAIR WATCH FOR TRAFFIC CONTROL AND WORKERS. Last updated Mon Sep 15 at 2:51 PM PDT. (DBC-81611) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Construction work between Crace St and Nicol St for 0.1 km (Nanaimo). Until Tue Sep 30 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Last updated Mon Jun 30 at 8:19 AM PDT. (DBC-77623) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Paving operations planned at Exit 11: 15th St (West Vancouver). Starting Mon Sep 15 at 9:00 PM PDT until Tue Sep 16 at 5:00 AM PDT. Paving on the eastbound offramp and the westbound onramp. Watch for crews and lane closures. Ramps will remain open. Last updated Fri Sep 12 at 7:33 PM PDT. (DBC-81529) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Electrical maintenance between Exit 14: Capilano Rd and Exit 13 for 1.5 km (North Vancouver - District to West Vancouver). Until Fri Sep 26. From 9:00 PM to 6:00 AM PDT daily. Right turn lane closed. Right lane closed. Last updated Wed Sep 10 at 5:09 PM PDT. (DBC-81002) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Exit 19: Lynn Valley Rd and Exit 21: Mountain Hwy for 0.5 km (North Vancouver - City). Until Wed Nov 5. From 7:00 AM to 8:00 PM PDT daily. Work on shoulders. Watch for traffic control. Last updated Wed Aug 6 at 2:53 PM PDT. (DBC-80161) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Paving operations at Exit 33: Kensington Ave (Burnaby). Until Fri Oct 31. From 8:00 PM to 5:00 AM PDT on weekdays and Sunday. Exit ramp is closed. Last updated Tue Sep 9 at 6:49 AM PDT. (DBC-81340) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work between 216th St and Exit 66: 232nd St for 3.8 km (Langley - District). Until Tue Sep 30. Watch for traffic control. Watch for intermittent lane closures. Last updated Wed Jun 4 at 2:35 PM PDT. (DBC-77541) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Construction work between Bradner Rd and 248 St for 5.3 km (Abbotsford to Langley - District). Until Tue Mar 31, 2026. Watch for traffic control. Traffic pattern change. Watch for signage. Last updated Wed Aug 20 at 3:22 PM PDT. (DBC-80694) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work at Exit 73 (Langley - District). Until Wed Dec 31. Exit ramp is closed. Current off-ramp will be closed, new off-ramp will be opened before the overpass. Turn left or right to 56th south from off-ramp. Last updated Thu Jun 19 at 8:12 PM PDT. (DBC-78296) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Tue Sep 30 at 12:00 PM PDT. Last updated Mon Jul 28 at 11:06 AM PDT. (DBC-66582) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Pavement patching underway between Exit 168: Flood Hope Rd and Exit 165: Flood Rd for 3.2 km (Hope). Until Mon Sep 15 at 3:30 PM PDT. Right lane closed. Last updated Mon Sep 15 at 9:59 AM PDT. (DBC-81590) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work planned between Emory Creek Campground and Victoria St for 5.6 km (Yale). Starting Tue Sep 16 at 7:00 AM PDT until Tue Sep 16 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Fri Sep 12 at 9:51 AM PDT. (DBC-81494) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Utility work planned between Anderson River Mainline and Toll Rd for 11.4 km (7 to 19 km north of Yale). Starting Mon Sep 22 at 7:00 AM PDT until Tue Sep 23 at 7:00 PM PDT. Last updated Wed Sep 10 at 2:08 PM PDT. (DBC-81420) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work between Slanzi Rd and Ainslie Rd N for 5.5 km (15 to 20 km south of Jackass Mountain Summit). Until Mon Sep 15 at 5:00 PM PDT. Road maintenance work. Lane Closure. West bound right lane will be closed for barrier placement. 60km/hr speed reduction in effect. Last updated Thu Sep 11 at 1:35 PM PDT. (DBC-81464) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Line painting planned at Vicars Rd (Kamloops). Starting Wed Sep 24 at 9:00 PM PDT until Thu Sep 25 at 5:00 AM PDT. Left turn lane will be closed. Last updated Mon Sep 15 at 8:42 AM PDT. (DBC-81584) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work planned between Stoney Flats Rd and Ska-Hiish Dr for 7.4 km (13 to 5 km west of Chase). Starting Wed Sep 17 at 9:00 AM PDT until Wed Sep 17 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Tue Sep 9 at 1:28 PM PDT. (DBC-81360) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Geotechnical investigation planned between 3 St SW and Shuswap St for 0.2 km (Salmon Arm). Starting Sun Oct 19 at 7:00 AM PDT until Mon Oct 20 at 5:00 PM PDT. Lane Closure. Centre lane will be closed. Last updated Wed Sep 3 at 11:48 AM PDT. (DBC-81160) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Paving operations planned between Silver Sands Rd and Solsqua-Sicamous Rd (Sicamous). Starting Tue Sep 23 at 4:30 AM PDT until Tue Sep 23 at 12:00 PM PDT. Paving operations planned. Lane Closure. Watch for traffic control personnel. Paving HWY 1 Westbound turn lane & Eastbound travel lane. Last updated Tue Sep 9 at 10:55 AM PDT. (DBC-81357) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance planned between Crazy Ck. Bridge and 19 mile Rd for 8.0 km (30 km east of Sicamous to 27 km west of Revelstoke). Starting Tue Sep 16 until Thu Sep 18. From 8:00 AM to 5:00 PM PDT on Tuesday, Wednesday and Thursday. Single lane alternating traffic will be in effect. Bridge Deck Condition Assessments. Last updated Tue Sep 9 at 12:41 PM PDT. (DBC-81355) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance planned between Crazy Ck. Bridge and Three Valley Frtg Rd for 18.9 km (16 km west of Revelstoke to 29 km east of Sicamous). Starting Tue Sep 16 at 8:00 AM PDT until Thu Sep 18 at 5:00 PM PDT. From 8:00 AM to 5:00 PM PDT on Tuesday, Wednesday and Thursday. Watch for crews working in multiple lanes. Pass with caution in the area. Last updated Fri Sep 12 at 2:04 PM PDT. (DBC-81511) |
Highway 1 |
Highway 1 (TransCanada Highway). Rock scaling planned between Three Valley Avalanche Gate and Three Valley Frtg Rd for 2.1 km (16 to 18 km west of Revelstoke). Starting Tue Sep 16 until Wed Sep 17. From 8:00 AM to 4:00 PM PDT on Tuesday and Wednesday. There will be delays up to 20 minutes. Last updated Mon Sep 15 at 10:03 AM PDT. (DBC-81575) |
Highway 1 |
Highway 1 (TransCanada Highway). Traffic signal outage planned between Highway 23 North and Glacier National Park East Boundary for 86.2 km (Revelstoke to 5 km west of East Boundary of Glacier National Park). Starting Thu Sep 18 at 8:00 AM PDT until Thu Sep 18 at 4:00 PM PDT. Utility work planned. BC Hydro planned outage. Last updated Mon Sep 15 at 11:57 AM PDT. (DBC-81600) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge construction at Meadows in the Sky Pkwy (Revelstoke). Until Fri Oct 31. Watch for traffic control. Lane Closure. Expect speed reductions to 50km/hr. Lane width restricted to 4m. No work on long weekends. Last updated Thu Jun 12 at 1:18 PM PDT. (DBC-76584) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance planned between Albert Canyon West Bridge and Albert Canyon Rd (3 km east of East Boundary of Mount Revelstoke National Park). Starting Tue Sep 16 until Wed Sep 17. From 7:00 AM to 3:00 PM PDT on Tuesday and Wednesday. Single lane alternating traffic will be in effect. Work will be taking place on the Albert Canyon West Bridge. Last updated Mon Sep 15 at 9:55 AM PDT. (DBC-81330) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Hemlock Grove Boardwalk and Illecillewaet Campground for 0.6 km (8 to 9 km east of West Boundary of Glacier National Park). Until Fri Oct 31. From 7:00 AM to 7:00 PM PDT daily. Culvert replacement work. Speed limit 50km/h at all times due to narrowing/realignment requirements. Last updated Fri Jul 11 at 4:20 PM PDT. (DBC-79076) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work planned at Illecillewaet Campground (4 km west of Rogers Pass Summit). Starting Tue Sep 23 at 10:30 AM PDT until Tue Sep 23 at 5:00 PM PDT. Left lane will be closed. Watch for traffic control personnel. Last updated Fri Sep 12 at 12:46 PM PDT. (DBC-81509) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Pavement patching is planned. Between Glacier National Park East Boundary and Quartz Creek Bridge (Structure) for 13.5 km (East Boundary of Glacier National Park). Starting Tue Sep 16 until Thu Sep 18. From 7:00 AM to 4:00 PM PDT on Tuesday, Wednesday and Thursday. Single lane alternating traffic will be in effect. Last updated Mon Sep 15 at 11:14 AM PDT. (DBC-81598) |
Highway 1 |
Highway 1 (TransCanada Highway). Rest area closed at Redgrave (14 km east of East Boundary of Glacier National Park). Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses. Next update time Mon Dec 1. Last updated Mon Jul 21 at 12:51 PM MDT. (DBC-73964) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Redgrave and Wiseman Rd for 6.0 km (15 to 21 km east of East Boundary of Glacier National Park). Until Sat Nov 15. Watch for traffic control. Expect minor delays. Construction zone reduced speed limit in effect. Lane widths are 5 metres each direction. Watch for crews and expect delays. Next update time Sat Nov 15 at 10:00 AM MDT. Last updated Fri Aug 22 at 10:02 AM MDT. (DBC-75437) |
Highway 1 |
Highway 1 (Kicking Horse Pass). Maintenance planned between Golden Donald Upper Rd and Yoho Bridge for 7.8 km (Golden). Starting Wed Sep 17 until Fri Sep 19. From 7:30 AM to 5:30 PM MDT on Wednesday, Thursday and Friday. Watch for traffic control personnel. Reduce speed. East bound lane shift from right lane to left lane. Last updated Mon Sep 15 at 1:19 PM MDT. (DBC-81603) |
Highway 1 Both Directions |
Highway 1 (Kicking Horse Pass), in both directions. Ditching at Kicking Horse Rest Area (9 km east of Golden). Until Thu Sep 18 at 4:00 PM MDT. From 7:30 AM to 4:00 PM MDT on Monday, Tuesday, Wednesday and Thursday. Right lane is closed in both directions. Last updated Sun Sep 14 at 7:57 PM MDT. (DBC-81564) |