Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge construction at Nicomen River Rd (14 km east of Lytton). Until Sat Nov 30. Watch for traffic control. Expect delays. Speed reduced to 30 km/h. Highway stoppages with expected delays of 15 minutes. Project completion: 30 November 2024. Next update time Fri Nov 29 at 3:00 PM PDT. Last updated Fri Oct 25 at 5:08 AM PDT. (DBC-56391) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Blasting. Road closed intermittently. Watch for traffic control. Speed reduction to 60km/hr. Next update time Mon Nov 25 at 10:00 AM PDT. Last updated Mon Oct 21 at 10:28 AM PDT. (DBC-64961) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Until Sat Nov 23. 2-hour closure from 6:00am-8:00am and 30-minute closures from 8:00am-6:00pm daily. Emergency vehicle access open. Next update time Sat Nov 23 at 6:00 PM PST. Last updated Fri Nov 8 at 4:02 PM PST. (DBC-68375) |
Highway 1 Both Directions |
Highway 1, in both directions. Utility work at Highway 18. Until Sat Nov 30 at 5:00 PM PST. Left turn lane closed. Right turn lane closed. Expect minor delays. Water main, storm sewer maintenance and road resurfacing. Lane closures in effect until project end. Watch for workers/vehicles on the shoulder. Last updated Thu Nov 21 at 8:24 AM PST. (DBC-68453) |
Highway 1 Both Directions |
Highway 1, in both directions. Utility work between 5km south of Hell's Gate and Alexandra Tunnel. Until Thu Nov 21. From 8:00 AM to 4:00 PM PST daily. Right lane is blocked. Expect minor delays. For pole access and cable splicing. Last updated Mon Nov 4 at 10:03 AM PST. (DBC-69912) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Galloping Goose Trail and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Sat Dec 14 at 5:30 AM PDT. From 8:00 PM to 5:30 AM PDT on weekdays. Left lane is closed in both directions. Expect delays. Traffic reduced to single lane both directions, with a minimum width of 4m and no change to the minimum height. Speed limit reduced to 50km/h. Last updated Thu Jun 20 at 4:49 PM PDT. (DBC-65197) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Bridge construction at Burnside Rd W (Saanich). Until Sat Dec 14 at 5:30 AM PDT. From 8:00 PM to 5:30 AM PDT on weekdays and Sunday. Right lane closed. Lane closure Sun to Thurs night for widening of the Eastbound Colquitz Bridge. Maximum width 4.0m. Speed limit reduced to 50 km/h. Left lane and offramp to Burnside Drive will remain open. Last updated Thu Jun 20 at 4:49 PM PDT. (DBC-64542) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Construction work planned between Exit 6: McKenzie Ave and Burnside Rd W (Saanich). Starting Thu Nov 28 until Sat Nov 30. From 7:00 PM to 5:00 AM PST on Thursday and Friday. Off-ramp left turn lane to Interurban Rd closed. Detour via Burnside Rd W to Tillicum Rd. Follow signage. Last updated Wed Nov 20 at 4:59 PM PST. (DBC-70412) |
Highway 1 Both Directions |
Highway 1 (Malahat Highway), in both directions. Special event between West Shore Pky and Mill Bay Rd for 20.6 km (4 km north of Malahat Summit to Langford). Until Thu Nov 21 at 2:00 PM PST. Commercial vehicle chain check along Highway 1.Commercial Vehicles over 11,794 kg must carry chains. Last updated Thu Nov 21 at 11:36 AM PST. (DBC-70429) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Mill Bay Rd and Butterfield Rd for 2.1 km (Mill Bay to 4 km north of Malahat Summit). Starting Mon Nov 25 at 10:00 PM PST until Fri Nov 29 at 6:00 AM PST. Tree pruning planned. Right lane will be closed. Last updated Mon Nov 4 at 3:14 PM PST. (DBC-69942) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Bridge maintenance between Mt Sicker Rd and Fuller Lake Rd for 3.7 km (Chemainus). Until Sun Dec 15 at 5:00 PM PST. Width limit 4.40 m. Chemainus River Bridge right lane closure. Construction speed zone in effect. Last updated Tue Nov 5 at 4:54 PM PST. (DBC-70003) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Special event planned between Davis Rd and Grouhel Rd for 1.6 km (Ladysmith). Starting Thu Nov 28 at 4:00 PM PDT until Thu Nov 28 at 9:00 PM PDT. Left turn lane will be closed. Right turn lane will be closed. Left turn lanes closed at Roberts St, Buller St. Right turn lane closed at 1st Ave. Access to Ladysmith through Dogwood Dr via N Davis Rd. Obey all signage and traffic control. Last updated Thu Oct 17 at 2:04 PM PDT. (DBC-69339) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Crace St and Bastion St for 0.5 km (Nanaimo). Until Fri Nov 22 at 3:00 PM PST. Centre lane is closed in both directions. Possible delays. Watch for traffic control. Last updated Sun Nov 10 at 2:18 PM PST. (DBC-70025) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Exit 33: Kensington Ave and Exit 37: Gaglardi Way for 4.3 km (Burnaby). Until Sat Nov 23. From 8:00 PM to 5:00 AM PST daily. Right lane closed. Shoulder closed. Last updated Thu Nov 14 at 11:52 AM PST. (DBC-70242) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work between Exit 37: Gaglardi Way and King Edward St for 3.2 km (Burnaby to Coquitlam). Until Fri Feb 28, 2025 at 7:00 AM PDT. From 9:30 PM to 7:00 AM PDT daily. Lane Closure. Expect delays. Lane closures are needed to move materials & equipment for the construction of TransLink's North Rd maintenance facility. Last updated Fri Sep 13 at 10:04 PM PDT. (DBC-60503) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between 208 St and Exit 73 for 9.3 km (Langley - District). Until Sat Nov 30 at 5:00 AM PDT. Lane Closure. Expect minor delays. Last updated Tue Jun 25 at 9:00 AM PDT. (DBC-65554) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Geotechnical investigation between 248 St and Bradner Rd for 7.2 km (Langley - District to Abbotsford). Until Sat Nov 30 at 5:30 AM PDT. Centre lane blocked. Right lane is blocked. Weekend closures from 9:00 PM to 7:30 AM. Last updated Fri Nov 1 at 7:00 PM PDT. (DBC-69860) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Geotechnical investigation at Exit 73 (Langley - District). Until Sat Nov 30 at 5:30 AM PDT. Early works investigation with coring and drilling. Saturday work from 9:00 p, to 7:00am. NO work on Sundays. Last updated Fri Nov 1 at 6:57 PM PDT. (DBC-69861) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road maintenance work between Bradner Rd and Exit 90: McCallum Rd for 8.1 km (Abbotsford). Until Sat Nov 30. From 8:30 PM to 5:30 AM PDT on weekdays. Median installation and soil removal. Fast lane closed in both directions. Last updated Mon Oct 28 at 10:09 AM PDT. (DBC-69660) |
Highway 1 Both Directions |
[Truncated] Highway 1 (TransCanada Highway), in both directions. Construction work planned between Exit 83: Mt Lehman Rd and Exit 90: McCallum Rd for 7.2 km (Abbotsford). Starting Sun Dec 1 until Tue Dec 31. From 8:30 PM to 5:30 AM PST on weekdays. Left lane will be closed in both directions. Industrial traffic may slow or block regular traffic. For advanced works on median installation. Please use caution and obey all traffic control. Work ongoing Monday to Friday nights, ending Saturday mornin |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Exit 153: Laidlaw Rd and Exit 160: Hunter Creek Rd (1 km west of Hope). Starting Mon Nov 25 at 7:00 AM PST until Mon Nov 25 at 1:00 PM PST. Expect minor delays. Right lane will be closed. Last updated Tue Nov 19 at 9:29 AM PST. (DBC-70343) |
Highway 1 |
Highway 1 (TransCanada Highway). Fog patches between Albert St and Jackass Summit for 69.2 km (Yale to 2 km north of Jackass Mountain Summit). Last updated Thu Nov 21 at 3:07 AM PST. (DBCRCON-192840) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Electrical maintenance between Anderson River Mainline and Thomas Rd for 2.8 km (21 to 24 km north of Yale). Until Thu Nov 28. From 8:00 AM to 4:00 PM PST daily. Lane Closure. Last updated Thu Nov 14 at 11:46 AM PST. (DBC-70240) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work planned between Main St and Gladwin Rd for 0.4 km (Lytton). Starting Fri Nov 22 at 8:30 AM PST until Fri Nov 22 at 4:30 PM PST. Right lane will be closed. Possible delays. Watch for traffic control personnel. Last updated Thu Nov 14 at 10:14 AM PST. (DBC-70236) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Gladwin Rd and Nicomen River Rd for 0.1 km (10 km east of Lytton). Until Sun Dec 22 at 7:00 PM PDT. Single lane alternating traffic. Expect delays up to 20 minutes. Next update time Fri Nov 22 at 10:00 AM PDT. Last updated Thu Oct 17 at 9:55 AM PDT. (DBC-69330) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work between Nicomen River Rd and Junction Hwy 8 for 1.4 km (3 to 2 km west of Spences Bridge). Until Wed Nov 27 at 6:30 PM PST. Single lane alternating traffic. Last updated Mon Nov 4 at 1:55 PM PST. (DBC-69937) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work between Deer Dr and West Kamloops for 12.4 km (Kamloops). Until Fri Nov 22. From 8:00 AM to 4:00 PM PST daily. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Mon Nov 4 at 1:17 PM PST. (DBC-69932) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Electrical maintenance between West Kamloops and East Kamloops for 10.6 km (Kamloops). Until Fri Dec 20. From 9:00 AM to 4:00 PM PST on weekdays. Lane Closure. Shoulder closed. Left lane is closed. Centre lane closed. Watch for traffic control and workers on the shoulder. Speed reduced in work zone. Last updated Fri Nov 1 at 2:40 PM PST. (DBC-69739) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work at Notch Hill Rd (18 km west of Tappen). Until Fri Dec 6. From 6:30 AM to 6:30 PM PST on weekdays. Shoulder closed. Single lane alternating traffic. Last updated Thu Nov 14 at 6:08 PM PST. (DBC-70254) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Tappen Valley Rd for 3.2 km (Tappen). Until Tue Dec 31. From 7:00 AM to 4:00 AM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays. Expect up to 30 min delays. Reduced speed through work zone at 80 km/hr during inactive work, 60 km/hr during active work. Intermittent minor stoppages. Last updated Fri Sep 20 at 3:51 PM PDT. (DBC-57219) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW (1 km west of Salmon Arm). Until Tue Dec 31. From 7:00 AM to 4:00 AM PDT on weekdays and Saturday. Up to one 20 minute closure daily and one 30 minute closure daily. Additional 5 minute closures may be required intermittently. Watch for traffic control. Last updated Wed Oct 30 at 12:01 PM PDT. (DBC-57687) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Tree pruning between 65 Ave NW and Salmon River Rd for 6.0 km (Salmon Arm). Until Thu Nov 21. From 7:00 AM to 5:00 PM PST on weekdays. Single lane alternating traffic. Shoulder closed. Last updated Wed Nov 13 at 1:10 PM PST. (DBC-70209) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Old Sicamous Rd and Old Spallumcheen Rd for 0.4 km (Sicamous). Until Sat Nov 23 at 3:00 PM PST. From 8:00 PM to 6:00 AM PST and from 9:00 AM to 3:00 PM PST on weekdays and Saturday. Single lane alternating traffic. Tree clearing and construction work. Delays up to 20 minutes. Last updated Fri Nov 15 at 7:43 PM PST. (DBC-70282) |
Highway 1 |
Highway 1 (TransCanada Highway). Slushy with slippery sections between Perry River Bridge and Glacier National Park West Boundary for 90.1 km (25 km east of Sicamous to 1 km east of West Boundary of Glacier National Park). Last updated Thu Nov 21 at 6:14 AM PST. (DBCRCON-193585) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work planned between Camp Creek Rd and Three Valley Siding Rd for 4.8 km (25 to 20 km west of Revelstoke). Starting Mon Dec 2 until Fri Dec 6. From 10:00 AM to 3:00 PM PST on weekdays. Right lane will be closed. Speed reduced to 60 km/h in work zone. Last updated Mon Nov 18 at 11:45 AM PST. (DBC-70327) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Rock slope stabilization at Three Valley Frtg Rd (16 km west of Revelstoke). Until Fri Dec 20 at 4:30 PM PST. From 6:30 AM to 4:30 PM PST on weekdays. Single lane alternating will be used, with delays of less than 20 minutes. Last updated Wed Nov 13 at 7:23 AM PST. (DBC-69367) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work between Allen Frontage Rd and Pine Rd for 0.3 km (3 to 2 km west of Revelstoke). Until Mon Nov 25. From 8:00 AM to 4:00 PM PST daily. Right lane closed. Last updated Thu Nov 21 at 10:02 AM PST. (DBC-70426) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Back Rd and Big Eddy Rd for 2.1 km (1 to 3 km west of Revelstoke). Starting Fri Nov 22 at 8:00 AM PST until Fri Nov 22 at 4:00 PM PST. Right lane will be closed. Last updated Tue Nov 19 at 3:31 PM PST. (DBC-70358) |
Highway 1 |
Highway 1 (TransCanada Highway). Watch for slippery sections between Glacier National Park West Boundary and Quartz Creek Bridge (Structure) for 57.1 km (1 km east of West Boundary of Glacier National Park to 14 km east of East Boundary of Glacier National Park). Compact snow. Last updated Thu Nov 21 at 5:49 AM PST. (DBCRCON-193525) |
Highway 1 |
Highway 1 (TransCanada Highway). Watch for slippery sections between Columbia West FSR and West Boundary of Yoho National Park for 68.0 km (14 km east of East Boundary of Glacier National Park to 1 km west of West Boundary of Yoho National Park). Last updated Thu Nov 21 at 6:49 AM MST. (DBCRCON-193526) |
Highway 1 Both Directions |
Highway 1 (Kicking Horse Pass), in both directions. Watch for falling rocks between Golden Donald Upper Rd and Yoho Bridge (5 km east of Golden). Last updated Wed Nov 20 at 2:45 AM MST. (DBC-44269) |
Highway 1 |
Highway 1 (Kicking Horse Pass). Watch for slippery sections between Beaverfoot Rd and BC/Alberta Border for 45.6 km (1 km west of West Boundary of Yoho National Park to 16 km east of Field). Compact snow. Last updated Thu Nov 21 at 6:49 AM MST. (DBCRCON-193448) |