Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work at Exit 165: Flood Rd (Hope). Lane Closure. Exit ramp is closed. Expect delays. Eastbound exit 165 closed, use exit 168. Next update time Fri May 30 at 9:00 AM PDT. Last updated Fri May 9 at 9:28 AM PDT. (DBC-73987) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Gladwin Rd and Nicomen River Rd for 1.1 km (10 to 11 km east of Lytton). From 7:00 AM to 5:30 PM PDT daily. Future Planned Closure: May 20th, 2025 12:01AM - 4:00AM. Until further notice, full time single lane alternating traffic. Expect up to 40-minute delays due to railway crossing and construction activities. Next update time Mon Sep 15 at 10:00 AM PDT. Last updated Wed May 14 at 5:46 PM PDT. (DBC-75637) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. May 13-Aug 16 7am-5pm Monday to Saturday 60km/h. 80km/h outside construction hours. Watch for traffic control. Next update time Sat Aug 16 at 10:00 AM PDT. Last updated Mon May 12 at 5:31 PM PDT. (DBC-64961) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Bolton Rd for 4.5 km (Tappen). Until Wed Dec 31. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. Expect up to 20 min delays. Reduced speed through work zone to 60 km/hr. Intermittent minor stoppages and single lane alternating traffic. Watch for traffic control. Next update time Mon Dec 1 at 9:00 AM PST. Last updated Thu Feb 27 at 1:35 PM PST. (DBC-72306) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW for 2.6 km (Salmon Arm to 2 km east of Tappen). Until Sat May 31. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. 20 minute closure at 1 PM. Intermittent 5 minute closures and single lane alternating traffic may be required. Next update time Mon May 26 at 9:00 AM PST. Last updated Thu Feb 27 at 1:27 PM PST. (DBC-72305) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 9:00 AM to 3:00 PM PDT on weekdays and Saturday. Road closed. Alternate route: Hwy 97A and 97B. Single lane alternating traffic 8 PM to 6 AM Mon-Thurs. No closures from Friday, May 16, to Tuesday, May 20. Regular closures to resume May 21 at 9 AM. Next update time Sun May 25 at 12:00 PM PDT. Last updated Fri May 16 at 10:54 AM PDT. (DBC-70490) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Starting Tues May 20 until Sun Jun 29. Travelers should expect 30 min closures between 7PM and 8AM and 2 hr closures between 2:30 AM and 4:30 AM, Mon to Sun morning. Stoppages at any time. Next update time Sun Jun 29 at 12:00 PM PDT. Last updated Fri May 16 at 12:12 PM PDT. (DBC-73974) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Roderick St and Culduthel Rd for 0.6 km (Saanich). Starting Mon Jul 7 at 10:00 PM PST until Tue Sep 30 at 5:00 AM PST. Right lane will be closed. Left lane will be closed. Expect minor delays. Watch for traffic control personnel. Last updated Wed Feb 19 at 11:59 AM PST. (DBC-72994) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Tillicum Rd and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Wed Dec 24, 2025. From 8:00 PM to 5:30 AM PST on weekdays and Sunday. Lane closures in both directions in effect. Traffic reduced to single lane both directions. Maximum width 4m. No maximum height change. Speed limit 50km/h. Last updated Fri Dec 20 at 9:03 AM PST. (DBC-71006) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Exit 6: McKenzie Ave and Exit 10: Burnside Rd W for 3.8 km (View Royal to Saanich). Construction work at Colwood Interchange, Helmcken Interchange, and McKenzie Interchange until Fall 2027. Expect speed changes, traffic pattern changes, and overnight work. Next update time Fri Jun 13 at 10:00 AM PDT. Last updated Tue Mar 25 at 4:46 PM PDT. (DBC-73856) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Utility work planned between Shawnigan-Mill Bay Rd and Butterfield Rd for 3.5 km (Mill Bay). Starting Wed May 28 at 8:00 AM PDT until Wed May 28 at 4:00 PM PDT. Shoulder will be closed. Last updated Thu May 15 at 11:06 AM PDT. (DBC-76679) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work planned between Trunk Rd and York Rd for 0.6 km (Duncan). Starting Tue May 20 until Sat Jun 14 at 4:00 PM PDT. Coronation Avenue bike lanes project. Work is on Coronation Avenue. Last updated Mon May 5 at 7:25 AM PDT. (DBC-74880) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work planned between Somenos Rd and Mt Sicker Rd for 1.5 km (2 to 4 km south of Chemainus). Starting Wed May 28 at 8:30 AM PDT until Wed May 28 at 3:30 PM PDT. Lane will be blocked. Last updated Thu May 15 at 10:08 AM PDT. (DBC-76672) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Electrical maintenance planned at Henry Rd (Chemainus). Starting Fri May 23 at 1:30 AM PDT until Fri May 23 at 4:00 AM PDT. Lane Closure. Watch for traffic control personnel. Last updated Fri May 16 at 8:54 AM PDT. (DBC-76717) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Electrical maintenance planned at Edgelow Rd (2 km south of Ladysmith). Starting Thu May 22 at 7:00 PM PDT until Fri May 23 at 1:00 AM PDT. Lane Closure. Watch for traffic control personnel. Last updated Fri May 16 at 8:55 AM PDT. (DBC-76718) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Electrical maintenance planned at Oyster Sto-Lo Rd (2 km north of Ladysmith). Starting Thu May 22 at 1:30 AM PDT until Thu May 22 at 4:00 AM PDT. Centre lane will be closed in both directions. Watch for traffic control personnel. Last updated Fri May 16 at 8:50 AM PDT. (DBC-76413) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Electrical maintenance planned at Fielding Rd (1 km south of Nanaimo). Starting Wed May 21 at 7:00 PM PDT until Thu May 22 at 1:00 AM PDT. Lane closures in both directions planned. Watch for traffic control personnel. Last updated Fri May 16 at 8:52 AM PDT. (DBC-76716) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Electrical maintenance planned at Cedar Rd (Nanaimo). Starting Tue May 20 at 7:00 PM PDT until Wed May 21 at 1:00 AM PDT. Lane closures in both directions planned. Watch for traffic control personnel. Last updated Fri May 16 at 8:48 AM PDT. (DBC-76410) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Electrical maintenance planned at Haliburton St (Nanaimo). Starting Wed May 21 at 1:30 AM PDT until Wed May 21 at 4:00 AM PDT. Lane closures in both directions planned. Watch for traffic control personnel. Last updated Fri May 16 at 8:49 AM PDT. (DBC-76412) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Construction work between Finlayson St and Nicol St for 0.3 km (Nanaimo). Until Thu May 29 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Construction work - Highway 1 Northbound between Crace St. And Esplanade. Right lane closed. Watch for work crews. Last updated Mon Apr 21 at 11:59 AM PDT. (DBC-70846) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between 216th St and Exit 73 for 9.3 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:30 AM PDT on weekdays. Night time construction work. Left lane is closed in both directions. Last updated Fri Mar 21 at 1:14 PM PDT. (DBC-74277) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work between 216th St and Exit 73 for 11.4 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 5:00 AM PDT daily. Lane closures in both directions in effect. Last updated Tue Apr 1 at 8:54 AM PDT. (DBC-74725) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Road construction work at Exit 73 (Langley - District). Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT on weekdays and Saturday. Shoulder maintenance. Exit ramp work on shoulder. Last updated Tue Apr 1 at 4:32 PM PDT. (DBC-74748) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Maintenance at Exit 73 (Langley - District). Until Sat May 31 at 7:00 AM PDT. From 9:00 PM to 7:00 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays. Shoulder closed. Last updated Tue Apr 1 at 4:43 PM PDT. (DBC-74751) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Geotechnical investigation between Riverside Rd and Exit 90: McCallum Rd for 0.6 km (Abbotsford). Until Fri May 23. From 8:00 PM to 5:00 AM PDT daily. Shoulder closed. Last updated Mon Apr 28 at 1:41 PM PDT. (DBC-75906) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work planned between Nicomen River Rd and Junction Hwy 8 for 1.7 km (14 to 12 km west of Spences Bridge). Starting Wed May 21 at 8:00 AM PDT until Thu May 22 at 6:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Tue May 13 at 8:00 AM PDT. (DBC-76568) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Utility work between Juniper Beach Prov Park Access Rd and Back Valley Rd for 3.8 km (10 to 14 km east of Cache Creek). Until Fri May 23. From 8:00 AM to 4:00 PM PDT daily. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Thu May 1 at 4:16 PM PDT. (DBC-75457) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Paving operations planned between Pat Rd and Miners Bluff Rd for 17.7 km (Kamloops). Starting Tue May 20 until Fri Jun 27 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Lane Closure. Watch for traffic control personnel. Last updated Wed May 14 at 7:22 AM PDT. (DBC-76609) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work planned between Stoney Flats Rd and Chief Neskonlith Dr for 8.0 km (13 to 5 km west of Chase). Starting Mon Jun 9 at 8:00 AM PDT until Fri Jun 13 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Thu May 15 at 1:28 PM PDT. (DBC-76683) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work planned between Stoney Flats Rd and Chief Neskonlith Dr for 8.0 km (5 to 13 km west of Chase). Starting Tue May 27 at 8:00 AM PDT until Fri May 30 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Wed May 14 at 1:05 PM PDT. (DBC-76630) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Rock slope stabilization between Three Valley Avalanche Gate and Three Valley Frtg Rd for 2.1 km (18 to 16 km west of Revelstoke). Until Sun May 18 at 5:00 PM PDT. From 5:00 AM to 5:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays of 20 minutes. No work taking place for May Long Weekend from Friday May 16 to Tuesday May 20. Work resumes on Wednesday May 21. Last updated Thu May 15 at 3:16 PM PDT. (DBC-74730) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Woods OH Bridge and Boulder Mtn Avalanche Gate for 4.2 km (8 to 12 km west of Revelstoke). Until Sun Aug 31. From 7:00 PM to 7:00 AM PDT daily. Speed reduction to 30km/h during construction. Last updated Fri Apr 25 at 5:56 PM PDT. (DBC-75826) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work planned between Back Rd and Pine Rd for 0.5 km (3 to 2 km west of Revelstoke). Starting Mon May 26 until Thu May 29. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic will be in effect. Last updated Thu May 15 at 3:02 PM PDT. (DBC-76629) |
Highway 1 |
Highway 1 (TransCanada Highway). There will be ditching between Three Valley OH Bridge and Highway 23 South for 22.3 km (Revelstoke). Starting Tue May 20 at 6:00 AM PDT until Tue May 20 at 3:00 PM PDT. Shoulder maintenance planned. Single lane alternating traffic will be in effect. Last updated Thu May 15 at 5:42 PM PDT. (DBC-76697) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge construction planned at Meadows in the Sky Pkwy (Revelstoke). Starting Tue May 20 until Fri Oct 31. Watch for traffic control personnel. Lane Closure. Expect speed reductions to 50km/hr. No work on long weekends. Last updated Tue May 13 at 2:27 PM PDT. (DBC-76584) |
Highway 1 |
Highway 1 (TransCanada Highway). Rest area closed at Redgrave Rest Area (14 km east of East Boundary of Glacier National Park). Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses. Next update time Mon May 19 at 9:00 AM MDT. Last updated Mon May 5 at 9:57 AM MDT. (DBC-73964) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Maintenance between Redgrave Rest Area and Anderson Rd for 39.9 km (14 km east of East Boundary of Glacier National Park to 1 km west of Golden). From 8:00 AM to 3:30 PM MDT on Monday and Tuesday. Last updated Mon May 5 at 8:18 AM MDT. (DBC-76164) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Redgrave Rest Area and Wiseman Rd for 6.0 km (15 to 21 km east of East Boundary of Glacier National Park). Until Mon Oct 27. From 7:00 AM to 7:00 PM MDT daily. Construction zone reduced speed limit in effect. Lane widths are 5 metres each direction. Watch for crews and expect delays. Next update time Tue Jul 15 at 12:00 PM MDT. Last updated Tue Apr 15 at 9:05 PM MDT. (DBC-75437) |
Highway 1 Both Directions |
Highway 1 (Kicking Horse Pass), in both directions. Watch for falling rocks between Golden Donald Upper Rd and Yoho Bridge (5 km east of Golden). Debris on roadway. Last updated Sat May 17 at 3:36 PM MDT. (DBC-44269) |
Highway 1 |
Highway 1 (Kicking Horse Pass). Bridge maintenance planned between Kicking Horse Rest Area and Glenogle Rd for 4.9 km (9 km east of Golden to 9 km west of West Boundary of Yoho National Park). Starting Tue May 20 at 8:00 AM MDT until Tue May 20 at 3:00 PM MDT. Right lane will be closed. Bridge Maintenance eastbound on Park Bridge. Watch for crew, equipment, and flaggers, and obey all road crew. Last updated Thu May 15 at 4:47 PM MDT. (DBC-76691) |