Highway 1 |
Highway 1 (TransCanada Highway). Paving operations between Cassiar Tunnel and Exit 29: Willingdon Ave for 3.8 km (Vancouver to Burnaby). Until Mon Sep 15. From 7:00 PM to 7:00 AM PDT on weekdays and Sunday. Traffic down to 1 lane each way. Westbound paving 7PM- 5AM. Eastbound paving 7PM-7AM. Follow construction signage and watch for crews. Next update time Mon Sep 15 at 7:00 AM PDT. Last updated Mon Jul 14 at 6:28 PM PDT. (DBC-79054) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Construction work at Exit 27: E 1st Ave (Vancouver). Until Mon Aug 4 at 11:45 PM PDT. Entrance ramp closed. Watch for traffic control. Next update time Mon Aug 4 at 11:45 PM PDT. Last updated Fri Aug 1 at 9:13 AM PDT. (DBC-78794) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Paving operations planned at Exit 27: E 1st Ave (Vancouver). Starting Wed Aug 6 at 10:00 PM PDT until Thu Aug 7 at 5:00 AM PDT. Exit ramp will be closed. Please note that Emergency Vehicles will not have access to the closed ramp. Next update time Thu Aug 7 at 5:00 AM PDT. Last updated Fri Aug 1 at 1:44 PM PDT. (DBC-80025) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Paving operations planned at Exit 28: Boundary Rd (Vancouver). Starting Wed Aug 6 at 10:00 PM PDT until Thu Aug 7 at 5:00 AM PDT. Entrance ramp will be closed. Please note that emergency vehicles will not have access to the closed ramp. Next update time Thu Aug 7 at 5:00 AM PDT. Last updated Fri Aug 1 at 1:51 PM PDT. (DBC-80026) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Paving operations planned at Grandview Highway (Burnaby). Starting Tue Aug 5 at 10:00 PM PDT until Wed Aug 6 at 6:00 AM PDT. Exit ramp will be closed. HOV Exit 28A will be closed. Use an alternate exit. Next update time Wed Aug 6 at 6:00 AM PDT. Last updated Fri Aug 1 at 12:28 PM PDT. (DBC-80015) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Paving operations planned between Exit 29: Willingdon Ave and Grandview Highway for 1.0 km (Burnaby). Starting Tue Aug 5 at 11:00 PM PDT until Wed Aug 6 at 4:00 AM PDT. Entrance ramp will be closed. Willingdon on ramp that enters Highway 1 past Grandview Hwy will be closed. Next update time Wed Aug 6 at 4:00 AM PDT. Last updated Fri Aug 1 at 12:36 PM PDT. (DBC-80018) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Paving operations at Exit 33: Kensington Ave (Burnaby). Until Sun Aug 31. Exit ramp is closed. One northbound lane on Kensington Avenue will be closed. Next update time Sun Aug 31. Last updated Mon Jul 7 at 7:00 AM PDT. (DBC-77926) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work between 248 St and Bradner Rd for 5.7 km (Langley - District). Until Tue Sep 30. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:00 AM PDT on weekdays. Lane closures in both directions in effect. Full highway closures from 11:00PM to 4:30AM as needed. Traffic diverted to Exit 73 on and off-ramps at those times. Next update time Tue Sep 30. Last updated Mon Jul 28 at 2:30 PM PDT. (DBC-79804) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Construction work at Exit 73 (Langley - District). Until Wed Dec 31 at 7:00 PM PDT. Exit ramp is closed. Current westbound offramp loop is closed. A new offramp will open before the overpass. Exit the highway and turn left or right onto 264th Street. Next update time Wed Dec 31 at 7:00 AM PDT. Last updated Sat Aug 2 at 11:01 PM PDT. (DBC-76914) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Vehicle incident between Exit 73 and Exit 66: 232nd St for 7.5 km (Langley - District). Road closed. Watch for traffic control. Expect delays. Next update time Mon Aug 4. Last updated Sun Aug 3 at 11:15 PM PDT. (DBC-80068) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Gladwin Rd and Nicomen River Rd for 1.1 km (10 to 11 km east of Lytton). Single lane alternating traffic. Work will take place from 4:00am-4:30pm and 6:00pm-4:00am PT daily. Expect up to 40 minute delays due to railway crossing / construction activities. Next update time Mon Sep 15 at 10:00 AM PDT. Last updated Tue Jul 8 at 10:09 AM PDT. (DBC-75637) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge construction planned between Gladwin Rd and Nicomen River Rd (10 km east of Lytton). Starting Thu Aug 7 at 10:00 PM PDT until Wed Aug 13 at 9:00 AM PDT. Road closure planned. Overnight closures for concrete deck pouring. August 7th and August 12th - 10 PM until 9 AM. Emergency vehicles will be accommodated through closures. Next update time Wed Aug 13 at 9:00 AM PDT. Last updated Tue Jul 29 at 11:04 AM PDT. (DBC-79847) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. 60km/h zone until Aug 16. No work Aug 2/3/4. 80km/h outside construction hours. Watch for traffic control. Next update time Sat Aug 16 at 10:00 AM PDT. Last updated Thu Jul 31 at 10:19 PM PDT. (DBC-64961) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Bolton Rd for 4.5 km (Tappen). Until Wed Dec 31. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Expect up to 20 min delays. Reduced speed through work zone to 60 km/hr. Intermittent minor stoppages and single lane alternating traffic. Watch for traffic control. Next update time Mon Dec 1 at 9:00 AM PDT. Last updated Mon Jun 16 at 6:28 AM PDT. (DBC-72306) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Tappen Beach Rd and 65 Ave NW for 2.6 km (Salmon Arm to 2 km east of Tappen). Until Mon Sep 15. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. 20 minute closure at 7:00pm at Kault Hill for blasting. Next update time Mon Sep 15 at 9:00 AM PDT. Last updated Sun Jul 20 at 6:37 AM PDT. (DBC-72305) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 8:00 PM to 6:00 AM PDT on weekdays and Saturday. Single lane alternating traffic. No single lane alternating traffic Friday Aug 1 - Monday Aug 4, inclusive.
Single lane alternating traffic to resume 8PM, Tuesday Aug 5. Next update time Wed Aug 6 at 12:00 PM PDT. Last updated Tue Jul 29 at 8:26 AM PDT. (DBC-70490) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work planned between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Starting Tue Aug 5 at 12:00 PM PDT. Expect 30-min closures from 7pm-8am Mon to Sun morning. 2-hour closures 3:30am - 5:30am Tues - Sat mornings, and 12:30am to 2:30am Sunday mornings. Intermittent stoppages may occur. Next update time Fri Aug 29 at 12:00 PM PDT. Last updated Sat Aug 2 at 2:33 PM PDT. (DBC-73974) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work between Roderick St and Culduthel Rd for 0.6 km (Saanich). Until Tue Sep 30 at 5:00 AM PDT. Right lane closed. Left lane is closed. Expect minor delays. Watch for traffic control. Last updated Wed Feb 19 at 11:59 AM PDT. (DBC-72994) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Carey Rd and Galloping Goose Trail (Saanich). Watch for traffic control. Traffic pattern change and night closures on Carey. Plan your route accordingly and expect traffic delays. Construction zone in effect 24/7. Last updated Fri Aug 1 at 1:49 PM PDT. (DBC-79782) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Tillicum Rd and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Wed Dec 24, 2025. From 8:00 PM to 5:30 AM PST on weekdays and Sunday. Lane closures in both directions in effect. Traffic reduced to single lane both directions. Maximum width 4m. No maximum height change. Speed limit 50km/h. Last updated Fri Dec 20 at 9:03 AM PST. (DBC-71006) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Exit 6: McKenzie Ave and Exit 10: Burnside Rd W for 3.8 km (View Royal to Saanich). Construction work at Colwood Interchange, Helmcken Interchange, and McKenzie Interchange until Fall 2027. Expect speed changes, traffic pattern changes, and overnight work. Next update time Tue Sep 16 at 10:00 AM PDT. Last updated Mon Jun 16 at 10:07 AM PDT. (DBC-73856) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work planned between Wilmot Rd and Koksilah Rd for 1.7 km (Cobble Hill). Starting Tue Aug 5 at 8:00 AM PDT until Tue Aug 5 at 4:00 PM PDT. Concrete pour for sign installation. No lanes will be blocked. Last updated Tue Jul 29 at 11:36 AM PDT. (DBC-79860) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Electrical maintenance planned at Whippletree Frtg (2 km north of Cobble Hill). Starting Mon Aug 18 at 8:30 AM PDT until Mon Aug 18 at 12:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. "Maintenance will be taking place Southbound on Highway 1 At Phipps Road in the Slow Lane.". Last updated Thu Jul 31 at 9:34 AM PDT. (DBC-79960) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Electrical maintenance planned at Cowichan Bay Rd (3 km south of Duncan). Starting Thu Aug 21 at 8:30 AM PDT until Thu Aug 21 at 12:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. "Southbound Right Lane Closure with Speed Reduction in Place.". Last updated Thu Jul 31 at 11:04 AM PDT. (DBC-79969) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Electrical maintenance planned at Miller Rd (2 km south of Duncan). Starting Wed Aug 20 at 8:30 AM PDT until Wed Aug 20 at 12:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. "Southbound Right Lane Closure with Speed Reduction in Place.". Last updated Thu Jul 31 at 10:55 AM PDT. (DBC-79967) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Special event between Davis Rd and Grouhel Rd for 1.9 km (Ladysmith). Until Mon Aug 4 at 12:15 AM PDT. Right lane is closed in both directions. Expect delays. Watch for traffic control. LADYSMITH DAYS SPECIAL EVENT - Slow down and watch for pedestrians. Last updated Fri Jul 25 at 11:03 AM PDT. (DBC-79731) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Construction work between Crace St and Nicol St for 0.1 km (Nanaimo). Until Tue Sep 30 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Last updated Mon Jun 30 at 8:19 AM PDT. (DBC-77623) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work planned at Exit 17: Westview Dr (North Vancouver - City). Starting Mon Aug 11 at 7:00 AM PDT until Wed Aug 27 at 5:00 PM PDT. Build along Westview Drive. No lane closure. Between Westview northbound off ramp and Hwy 1 overpass. Last updated Mon Jul 14 at 4:07 PM PDT. (DBC-79230) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Shoulder maintenance between Exit 19: Lynn Valley Rd and Exit 21: Mountain Hwy for 2.0 km (North Vancouver - District to North Vancouver - City). Until Tue Aug 5. From 7:00 AM to 8:00 PM PDT daily. Last updated Tue Jun 24 at 11:19 AM PDT. (DBC-78472) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Stalled vehicle at Second Narrows Bridge (North Vancouver - District). Right lane is blocked. Expect delays. The stall is at the north end of the bridge. Next update time Sun Aug 3 at 11:45 PM PDT. Last updated Sun Aug 3 at 11:08 PM PDT. (DBC-80069) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work between 216th St and Exit 66: 232nd St for 3.8 km (Langley - District). Until Tue Sep 30. Watch for traffic control. Watch for intermittent lane closures. Last updated Wed Jun 4 at 2:35 PM PDT. (DBC-77541) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between 248 St and Bradner Rd for 6.9 km (Langley - District to Abbotsford). Starting Wed Aug 6 until Sun Aug 10. From 11:00 PM to 6:30 AM PDT daily. Watch for traffic control personnel. 20 min rolling lane closures. Last updated Fri Aug 1 at 2:00 PM PDT. (DBC-80027) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work at Exit 73 (Langley - District). Until Wed Dec 31. Exit ramp is closed. Current off-ramp will be closed, new off-ramp will be opened before the overpass. Turn left or right to 56th south from off-ramp. Last updated Thu Jun 19 at 8:12 PM PDT. (DBC-78296) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Tue Sep 30 at 12:00 PM PDT. Last updated Mon Jul 28 at 11:06 AM PDT. (DBC-66582) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Utility work between Exit 83: Mt Lehman Rd and Bradner Rd for 3.8 km (Abbotsford). Until Wed Aug 13. From 8:00 AM to 4:00 PM PDT daily. Last updated Wed Jun 25 at 11:06 AM PDT. (DBC-78517) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Utility work between Exit 83: Mt Lehman Rd and Bradner Rd (Abbotsford). Until Wed Aug 13. From 8:00 AM to 4:00 PM PDT on weekdays. Shoulder closed. Last updated Wed Jun 25 at 3:21 PM PDT. (DBC-78532) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work between Peardonville Rd and Exit 90: McCallum Rd for 5.0 km (Abbotsford). Until Fri Aug 15. From 9:00 PM to 5:30 AM PDT on weekdays. Lane closures in both directions in effect. Last updated Mon Jul 7 at 1:53 PM PDT. (DBC-78916) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work between Riverside Rd and Exit 92 (Abbotsford). Until Fri Aug 29 at 5:00 AM PDT. From 9:00 PM to 5:30 AM PDT on weekdays. Lane closures in both directions in effect. Lane closures in effect on Hwy 11 and Hwy 1. One lane in each direction will be maintained at all times. Last updated Wed Jul 9 at 12:24 PM PDT. (DBC-78915) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Exit 146 and Exit 151: Peters Rd for 5.1 km (14 km east of Chilliwack to 9 km west of Hope). Starting Tue Aug 5 until Fri Aug 29. From 7:00 AM to 7:00 PM PDT daily. Roadway will be reduced to one lane. Speed reduction in place. Eastbound on ramp at Exit 146 will be closed. Last updated Fri Aug 1 at 4:24 PM PDT. (DBC-80035) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Utility work planned between 1st Ave and Toll Rd for 10.5 km (17 to 6 km north of Yale). Starting Mon Aug 18 until Fri Aug 29 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Right lane will be blocked. Last updated Fri Jul 25 at 11:56 AM PDT. (DBC-79733) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. There is a wildfire between Blue Lake Rd and Main St for 20.0 km (Lytton to 2 km south of Jackass Mountain Summit). Wildfire is across the Highway and Fraser River, highway not affected. Please do not stop to take photos or observe fire. Drive with caution in the area. Next update time Tue Aug 5 at 10:00 AM PDT. Last updated Fri Aug 1 at 12:17 PM PDT. (DBC-79970) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Crack sealing is underway between Quartz Rd and Vavasour Rd for 36.2 km (Cache Creek to 34 km west of Kamloops). Until Thu Aug 7. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Watch for traffic control. Expect delays. Work is happening between Cache Creek and the Savona Bridge. Last updated Fri Aug 1 at 6:47 AM PDT. (DBC-79750) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work planned between Tunkwa Lake Rd and Six Mile Hill Rd for 1.7 km (23 to 25 km west of Kamloops). Starting Tue Aug 19 until Fri Aug 22. From 8:00 AM to 4:00 PM PDT daily. Lane closures in both directions planned. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Jul 17 at 1:34 PM PDT. (DBC-79389) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Vehicle recovery planned between Taft OH Bridge and Enchanted Forest Ftg Rd for 6.7 km (29 km west of Revelstoke to 29 km east of Sicamous). Starting Tue Aug 5 at 9:00 PM PDT until Tue Aug 5 at 11:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Fri Aug 1 at 1:17 PM PDT. (DBC-80021) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Vehicle recovery planned between Three Valley Siding Rd and Three Valley Frtg Rd for 4.2 km (16 to 20 km west of Revelstoke). Starting Tue Aug 5 at 6:00 PM PDT until Tue Aug 5 at 9:00 PM PDT. Lane Closure. Last updated Fri Aug 1 at 1:17 PM PDT. (DBC-80022) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Woods OH Bridge and Boulder Mtn Avalanche Gate for 4.2 km (8 to 12 km west of Revelstoke). Until Sun Aug 31. From 7:00 PM to 7:00 AM PDT daily. Single lane alternating traffic. Speed reduction to 30km/h during construction. Last updated Fri Aug 1 at 5:04 PM PDT. (DBC-75826) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge construction at Meadows in the Sky Pkwy (Revelstoke). Until Fri Oct 31. Watch for traffic control. Lane Closure. Expect speed reductions to 50km/hr. Lane width restricted to 4m. No work on long weekends. Last updated Thu Jun 12 at 1:18 PM PDT. (DBC-76584) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Hemlock Grove Boardwalk and Illecillewaet Campground for 0.6 km (8 to 9 km east of West Boundary of Glacier National Park). Until Fri Oct 31. From 7:00 AM to 7:00 PM PDT daily. Culvert replacement work. Speed limit 50km/h at all times due to narrowing/realignment requirements. Last updated Fri Jul 11 at 4:20 PM PDT. (DBC-79076) |
Highway 1 |
Highway 1 (TransCanada Highway). Rest area closed at Redgrave (14 km east of East Boundary of Glacier National Park). Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses. Next update time Mon Dec 1. Last updated Mon Jul 21 at 12:51 PM MDT. (DBC-73964) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Redgrave and Wiseman Rd for 6.0 km (15 to 21 km east of East Boundary of Glacier National Park). Until Sat Nov 15. Watch for traffic control. Expect minor delays. Construction zone reduced speed limit in effect. Lane widths are 5 metres each direction. Watch for crews and expect delays. Next update time Fri Aug 22 at 10:00 AM MDT. Last updated Sat Jul 5 at 10:01 AM MDT. (DBC-75437) |
Highway 1 |
Highway 1 (Kicking Horse Pass). Maintenance planned between Golden Donald Upper Rd and Yoho Bridge for 7.8 km (Golden). Starting Tue Aug 5 at 12:00 PM MDT until Tue Aug 5 at 6:00 PM MDT. Watch for traffic control personnel. Reduce Speed. Lane shift from slow lane to fast lane for west bound traffic. Last updated Thu Jul 31 at 11:42 AM MDT. (DBC-79964) |
Highway 1 |
Highway 1 (Kicking Horse Pass). Maintenance planned at Golden Donald Upper Rd (Golden). Starting Tue Aug 5 until Fri Aug 8. From 12:00 PM to 6:00 PM MDT on Tuesday and from 8:00 PM to 6:00 PM MDT on Wednesday, Thursday and Friday. Watch for traffic control personnel. Reduce speed. Lane shift from slow lane to fast lane for east bound traffic. Last updated Thu Jul 31 at 11:36 AM MDT. (DBC-79965) |