• Events for Highway 1
  • Highway 1 Both Directions [Truncated] Highway 1 (TransCanada Highway), in both directions. Paving operations planned between Cassiar Tunnel and Exit 29: Willingdon Ave for 3.8 km (Vancouver to Burnaby). Starting Sun Jul 13 until Mon Sep 15. From 7:00 PM to 7:00 AM PDT on weekdays and Sunday. Traffic down to 1 lane each way. Westbound paving will be between 7 PM and 5 AM. Eastbound paving will be between 7 PM and 7 AM. Both directions will be affected. Follow construction signage and watch for crews on the road. Next upda
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Construction work at Exit 27: E 1st Ave (Vancouver). Until Sun Jul 20 at 11:45 PM PDT. Exit ramp is closed. Watch for traffic control. Sewer upgrades. Use Exit 26 or 28 as alternate options. Left turn lane onto westbound on-ramp also closed. Next update time Sun Jul 20 at 11:45 PM PDT. Last updated Wed Jul 9 at 9:33 AM PDT. (DBC-78794)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Vehicle incident between Exit 32: Sprott St and Douglas Rd (Burnaby). Merge lane and right lane blocked. Next update time Fri Jul 11 at 8:00 PM PDT. Last updated Fri Jul 11 at 7:10 PM PDT. (DBC-79129)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Paving operations at Exit 33: Kensington Ave (Burnaby). Until Sun Aug 31. Exit ramp is closed. One northbound lane on Kensington Avenue will be closed. Next update time Sun Aug 31. Last updated Mon Jul 7 at 7:00 AM PDT. (DBC-77926)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Vehicle incident between 216th St and 208 St (Langley - District). Right lane is blocked. Expect delays. Next update time Fri Jul 11 at 8:00 PM PDT. Last updated Fri Jul 11 at 7:02 PM PDT. (DBC-79127)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Industrial traffic may slow or block regular traffic. Between 248 St and Bradner Rd for 7.2 km (Langley - District to Abbotsford). Until Thu Jul 31 at 4:30 AM PDT. From 11:00 PM to 4:30 AM PDT on weekdays. 20 min closures for crane move. Traffic to be diverted to Exit 73/264 St. Next update time Wed Jul 30 at 9:00 AM PDT. Last updated Wed Jun 11 at 10:04 PM PDT. (DBC-77894)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Utility work between 248 St and Bradner Rd for 6.0 km (Langley - District to Abbotsford). Until Tue Jul 22. From 11:00 PM to 4:30 AM PDT on weekdays. Intermittent full closures required for relocation of hydro lines. Expect up to 20 minutes delay. Next update time Tue Jul 22 at 4:30 AM PDT. Last updated Tue Jul 8 at 2:35 PM PDT. (DBC-78961)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Construction work at Exit 73 (Langley - District). Until Wed Dec 31 at 7:00 PM PDT. Exit ramp is closed. Current Westbound off-ramp loop will be closed. A new off-ramp will be opened before the overpass. The traveling public will exit the highway and turn left or right onto 264th Street. Next update time Wed Dec 31 at 7:00 AM PDT. Last updated Sun Jun 22 at 10:17 AM PDT. (DBC-76914)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work between Gladwin Rd and Nicomen River Rd for 1.1 km (10 to 11 km east of Lytton). Single lane alternating traffic. Work will take place from 4:00am-4:30pm and 6:00pm-4:00am PT daily. Expect up to 40 minute delays due to railway crossing / construction activities. Next update time Mon Sep 15 at 10:00 AM PDT. Last updated Tue Jul 8 at 10:09 AM PDT. (DBC-75637)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. 60km/h zone from May 13 to Aug 16. 80km/h outside construction hours. Watch for traffic control. Next update time Sat Aug 16 at 10:00 AM PDT. Last updated Fri Jun 6 at 10:26 PM PDT. (DBC-64961)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Bolton Rd for 4.5 km (Tappen). Until Wed Dec 31. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Expect up to 20 min delays. Reduced speed through work zone to 60 km/hr. Intermittent minor stoppages and single lane alternating traffic. Watch for traffic control. Next update time Mon Dec 1 at 9:00 AM PDT. Last updated Mon Jun 16 at 6:28 AM PDT. (DBC-72306)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Tappen Beach Rd and 65 Ave NW for 2.6 km (Salmon Arm to 2 km east of Tappen). Until Mon Sep 15. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. 20 minute closure at 7:00pm at Kault Hill for blasting. Single lane alternating traffic July 18-19 from 7:00pm-6:00am. Next update time Mon Sep 15 at 9:00 AM PDT. Last updated Thu Jul 10 at 12:09 PM PDT. (DBC-72305)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 8:00 PM to 6:00 AM PDT on weekdays and Saturday. Single lane alternating traffic. Next update time Wed Jul 16 at 12:00 PM PDT. Last updated Tue Jul 8 at 10:17 AM PDT. (DBC-70490)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Expect 30-min closures from 7pm-8am and 2-hour closures from 2:30am-4:30am, Monday night to Saturday night. Intermittent stoppages may occur. Next update time Fri Aug 1 at 12:00 PM PDT. Last updated Sun Jun 29 at 7:07 AM PDT. (DBC-73974)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Utility work between Roderick St and Culduthel Rd for 0.6 km (Saanich). Until Tue Sep 30 at 5:00 AM PDT. Right lane closed. Left lane is closed. Expect minor delays. Watch for traffic control. Last updated Wed Feb 19 at 11:59 AM PDT. (DBC-72994)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Tillicum Rd and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Wed Dec 24, 2025. From 8:00 PM to 5:30 AM PST on weekdays and Sunday. Lane closures in both directions in effect. Traffic reduced to single lane both directions. Maximum width 4m. No maximum height change. Speed limit 50km/h. Last updated Fri Dec 20 at 9:03 AM PST. (DBC-71006)
    Highway 1 Highway 1 (TransCanada Highway). Road construction work between Exit 6: McKenzie Ave and Exit 10: Burnside Rd W for 3.8 km (View Royal to Saanich). Construction work at Colwood Interchange, Helmcken Interchange, and McKenzie Interchange until Fall 2027. Expect speed changes, traffic pattern changes, and overnight work. Next update time Tue Sep 16 at 10:00 AM PDT. Last updated Mon Jun 16 at 10:07 AM PDT. (DBC-73856)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Electrical maintenance between Davis Rd and Simpson Rd for 8.3 km (Ladysmith). Until Fri Jul 11. From 7:00 PM to 5:00 AM PDT on Tuesday, Wednesday, Thursday and Friday. Lane Closure. Watch for traffic control. Speed reduction and alternating lane closures in all directions. Last updated Wed Jul 9 at 12:54 AM PDT. (DBC-78959)
    Highway 1 Northbound Highway 1 (TransCanada Highway), northbound. Construction work between Crace St and Nicol St for 0.1 km (Nanaimo). Until Tue Sep 30 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Last updated Mon Jun 30 at 8:19 AM PDT. (DBC-77623)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Shoulder maintenance between Exit 19: Lynn Valley Rd and Exit 21: Mountain Hwy for 2.0 km (North Vancouver - District to North Vancouver - City). Until Tue Aug 5. From 7:00 AM to 8:00 PM PDT daily. Last updated Tue Jun 24 at 11:19 AM PDT. (DBC-78472)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Bridge maintenance at Port Mann Bridge (Surrey). Until Sat Jul 12 at 5:00 AM PDT. From 9:00 PM to 5:00 AM PDT on weekdays. Watch for traffic control. Eastbound right lane of Surrey lanes closed at the west end of Port Mann Bridge. Last updated Mon Jul 7 at 9:29 PM PDT. (DBC-78566)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Construction work between 216th St and Exit 66: 232nd St for 3.8 km (Langley - District). Until Tue Sep 30. Watch for traffic control. Watch for intermittent lane closures. Last updated Wed Jun 4 at 2:35 PM PDT. (DBC-77541)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Maintenance between Exit 73 and 248 St for 3.8 km (Langley - District). Until Thu Jul 31. From 8:30 PM to 5:00 AM PDT daily. Right turn lane closed. Centre lane closed. Shoulder closed. Work will be taking place east of 248th St and west of Lefeuvre Rd. Last updated Tue Jun 3 at 10:38 AM PDT. (DBC-77479)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Construction work at Exit 73 (Langley - District). Until Wed Dec 31. Exit ramp is closed. Current off-ramp will be closed, new off-ramp will be opened before the overpass. Turn left or right to 56th south from off-ramp. Last updated Thu Jun 19 at 8:12 PM PDT. (DBC-78296)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Exit 73 and Exit 83: Mt Lehman Rd for 3.8 km (Abbotsford). Until Thu Jul 31. From 8:30 PM to 5:30 AM PDT daily. Lane Closure. Highway 1 improvement project. Last updated Fri Jul 4 at 12:19 PM PDT. (DBC-78830)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Utility work between Exit 83: Mt Lehman Rd and Bradner Rd for 3.8 km (Abbotsford). Until Wed Aug 13. From 8:00 AM to 4:00 PM PDT daily. Last updated Wed Jun 25 at 11:06 AM PDT. (DBC-78517)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Utility work between Exit 83: Mt Lehman Rd and Bradner Rd (Abbotsford). Until Wed Aug 13. From 8:00 AM to 4:00 PM PDT on weekdays. Shoulder closed. Last updated Wed Jun 25 at 3:21 PM PDT. (DBC-78532)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Utility work planned between Peardonville Rd and Exit 90: McCallum Rd for 5.0 km (Abbotsford). Starting Mon Jul 14 until Fri Aug 15. From 9:00 PM to 5:30 AM PDT on weekdays. Lane closures in both directions planned. Last updated Mon Jul 7 at 1:53 PM PDT. (DBC-78916)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Utility work between Riverside Rd and Exit 92 (Abbotsford). Until Fri Aug 29 at 5:00 AM PDT. From 9:00 PM to 5:30 AM PDT on weekdays. Lane closures in both directions in effect. Lane closures in effect on Hwy 11 and Hwy 1. One lane in each direction will be maintained at all times. Last updated Wed Jul 9 at 12:24 PM PDT. (DBC-78915)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Utility work planned between Exit 90: McCallum Rd and Exit 92 for 1.9 km (Abbotsford). Starting Tue Jul 22 until Thu Jul 24. From 10:00 PM to 5:00 AM PDT daily. Left lane will be blocked. Watch for traffic control personnel. Last updated Fri Jun 20 at 9:47 AM PDT. (DBC-78317)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Maintenance at Exit 165: Flood Rd (Hope). Until Mon Jul 14. From 7:00 AM to 7:00 PM PDT daily. Exit ramp is closed. Watch for traffic control. Last updated Fri Jul 11 at 12:53 PM PDT. (DBC-78791)
    Highway 1 Highway 1 (TransCanada Highway). Water pooling between Waverly Park Frtg and Bernie Rd for 56.9 km (15 km east of Chase to 8 km west of Sicamous). Last updated Thu Jul 10 at 8:26 PM PDT. (DBCRCON-223278)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Paving operations planned between 65 Ave NW and Tappen Beach Rd for 2.6 km (Salmon Arm to 2 km east of Tappen). Starting Fri Jul 18 until Sat Jul 19. From 7:00 PM to 6:00 AM PDT on Friday and Saturday. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Expect delays of 20 minutes. Last updated Thu Jul 10 at 12:02 PM PDT. (DBC-79007)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Utility work planned between Shuswap St and 10 St NE for 0.7 km (Salmon Arm). Starting Mon Jul 14 until Thu Jul 17. From 9:00 PM to 5:00 AM PDT on Monday, Tuesday, Wednesday and Thursday. Expect minor delays. Last updated Wed Jul 2 at 3:55 PM PDT. (DBC-78759)
    Highway 1 Highway 1 (TransCanada Highway). Geotechnical investigation planned between Bernie Rd and Malakwa Rd for 30.0 km (Sicamous). Starting Wed Jul 23 at 9:00 PM PDT until Sun Jul 27 at 5:00 AM PDT. Expect minor delays. Night time construction work planned. Last updated Fri Jul 11 at 11:49 AM PDT. (DBC-79118)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Woods OH Bridge and Boulder Mtn Avalanche Gate for 4.2 km (8 to 12 km west of Revelstoke). Until Sun Aug 31. From 7:00 PM to 7:00 AM PDT daily. Single lane alternating traffic with a 4 meter width restriction. Speed reduction to 30km/h during construction. Last updated Tue May 20 at 5:08 PM PDT. (DBC-75826)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Bridge maintenance planned between Columbia River Bridge and Victoria Rd W (Revelstoke). Starting Wed Jul 16 at 6:00 AM PDT until Wed Jul 16 at 8:00 AM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Crews will be curb painting on the bridge. Last updated Thu Jul 10 at 7:14 AM PDT. (DBC-78955)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Bridge construction at Meadows in the Sky Pkwy (Revelstoke). Until Fri Oct 31. Watch for traffic control. Lane Closure. Expect speed reductions to 50km/hr. Lane width restricted to 4m. No work on long weekends. Last updated Thu Jun 12 at 1:18 PM PDT. (DBC-76584)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work planned between Hemlock Grove Boardwalk and Illecillewaet Campground for 0.6 km (8 to 9 km east of West Boundary of Glacier National Park). Starting Wed Jul 16 until Fri Oct 31. From 7:00 AM to 7:00 PM PDT daily. Culvert replacement work. Speed limit 50km/h at all times due to narrowing/realignment requirements. Last updated Fri Jul 11 at 4:20 PM PDT. (DBC-79076)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Road maintenance work planned between Illecillewaet Campground and Glacier National Park Summit (3 km west of Rogers Pass Summit). Starting Thu Jul 17 at 10:30 AM PDT until Thu Jul 17 at 5:00 PM PDT. Left lane will be closed. Watch for traffic control personnel. Last updated Fri Jun 27 at 10:54 AM PDT. (DBC-78611)
    Highway 1 Highway 1 (TransCanada Highway). Rest area closed at Redgrave Rest Area (14 km east of East Boundary of Glacier National Park). Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses. Last updated Wed May 21 at 10:39 AM MDT. (DBC-73964)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work between Redgrave and Wiseman Rd for 6.0 km (15 to 21 km east of East Boundary of Glacier National Park). Until Sat Nov 15. Watch for traffic control. Expect minor delays. Construction zone reduced speed limit in effect. Lane widths are 5 metres each direction. Watch for crews and expect delays. Next update time Fri Aug 22 at 10:00 AM MDT. Last updated Sat Jul 5 at 10:01 AM MDT. (DBC-75437)